N3904026Q5283_ Attachment 1_ CDRLS.pdf

PDF 425 KB Posted

Attached to
Various Countersunk Cap Screws
Solicitation number
N3904026Q5283
Issued by

About this file

This is a contract continuation sheet and attachment specifying requirements for self-locking socket flat countersunk head cap screws. The solicitation document covers three line items with the following specifications: Item 1 requires 150 each of 7/8-9UNC-3A x 1-3/4 inch screws; Item 2 requires 600 each of 7/8-9UNC-3A x 1-1/2 inch screws; and Item 3 requires 600 each of 7/8-9UNC-3A x 2-1/2 inch screws. All items must comply with FF-S-86H Type IV shape specifications, be manufactured from steel with a minimum 12% elongation in four diameters, incorporate MIL-DTL-18240F Type N self-locking mechanisms, and be marked with six dots (approximately 0.032" diameter) raised or depressed on the screw head. The fasteners must be uncoated and furnished with thread protectors that are neither yellow nor magenta in color.

The contract data requirements outlined in Exhibit A (DD Form 1423) mandate that vendors provide certificates of compliance for each of the three items covering three distinct specifications: minimum 12% elongation, MIL-DTL-18240F compliance, and FF-S-86H compliance. Certificates must be submitted with material shipments and include the vendor quality assurance official's signature, title, and material identification (lot, batch, part number, etc.). All inspection and test reports required for traceability to each contract item must accompany the signed compliance statement, with distribution to code 410 via mail without DD Form 250 required.

View the file

Other files

File Type Posted
N3904026Q5283_ Attachment 2_ OPSEC.pdf PDF
N3904026Q5283_ Combined Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQ DOC NO. - 53498291, 5346E026, 5346E031 ATTACHMENT

CONTINUATION SHEET CONTRACT NO. - _______________ PAGE OF 13

NAME OF OFFER OR/CONTRACTOR

1 SELF-LOCKING SOCKET FLAT COUNTERSUNK HEAD CAP SCREW 82O:

150 EA

2 SELF-LOCKING SOCKET FLAT COUNTERSUNK HEAD CAP SCREW 82O:

600 EA ______

3 SELF-LOCKING SOCKET FLAT COUNTERSUNK HEAD CAP SCREW 82O:

600 EA

C. DESCRIPTION/SPECIFICATIONS:

C.1 (ITEM 1) - SELF-LOCKING SOCKET FLAT COUNTERSUNK HEAD CAP

SCREW 82O:

C.1.1 SIZE: 7/8 – 9UNC – 3A X 1-3/4 INCH LONG

C.1.2 QUANTITY: 150 EA

C.2 (ITEM 2) - SELF-LOCKING SOCKET FLAT COUNTERSUNK HEAD CAP

SCREW 82O:

C.2.1 SIZE: 7/8 – 9UNC – 3A X 1-1/2 INCH LONG

C.2.2 QUANTITY: 600 EA

C.3 (ITEM 3) - SELF-LOCKING SOCKET FLAT COUNTERSUNK HEAD CAP

SCREW 82O:

C.3.1 SIZE: 7/8 – 9UNC – 3A X 2-1/2 INCH LONG

C.3.2 QUANTITY: 600 EA

C.4. ALL ITEMS (1 – 3)

C.4.1. SHAPE: FF-S-86H TYPE IV

C.4.2. MATERIAL: STEEL

C.4.3. 12% MINIMUM ELONGATION IN 4 DIAMETERS

ITEM # SUPPLIES/SERVICES QTY U/I

C.4.4. SELF-LOCKING: MIL-DTL-18240F TYPE N

C.4.5. MARK WITH 6 DOTS (~0.032” DIA) RAISED OR DEPRESSED,

(~0.010) ON HEAD TOP OR SIDE,

C.4.6. COATING: UNCOATED

D.1. PACKAGING REQUIREMENTS:

D.1.1. FURNISH EACH FASTENER WITH THREAD PROTECORS. (NO YELLOW

OR MAGENTA)

E.1. DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTCHMENT #1:

E.1. CERTIFICATION OF COMPLIANCE FOR EACH ITEM; EXHIBIT A

SEQUENCE A001AA, A002AA, A003AA:

E.1.1. MINIMUM 12% ELONGATION IN 4 DIAMETERS

E.2. CERTIFICATION OF COMPLIANCE FOR EACH ITEM; EXHIBIT A

SEQUENCE A001AB, A002AB, A003AB:

E.2.1. MIL-DTL-18240F

E.3. CERTIFICATION OF COMPLIANCE FOR EACH ITEM; EXHIBIT A

SEQUENCE A001AC, A002AC, A003AC:

E.3.1. FF-S-86H

EXHIBIT A

(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)

CONTRACT DATA REQUIREMENTS LIST

SYSTEM/ITEM: SLF LCKG SCKT FLT CNTRSNK HD CP SCRW 82O CATEGORY ____________

ITEM NO 1 CONTRACTOR

01 SEQ NO A001AA

02 DATA DESC CERTIFICATE OF COMPLIANCE

03 SUBTITLE ELONGATION

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.1.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

15 TOTAL __

16 REMARKS

SEQ. NO. A001

PREPARED BY ________________________________________________ DATE__________________ APPROVED BY ________________________________________________ DATE__________________

DD FORM 1423

01 SEQ NO A001AB

03 SUBTITLE MIL-DTL-18240

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.2.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

15 TOTAL __

01 SEQ NO A001AC

03 SUBTITLE FF-S-86H

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.3.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

ITEM NO 2 CONTRACTOR

01 SEQ NO A002AA

03 SUBTITLE ELONGATION

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.1.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

SEQ. NO. A002

01 SEQ NO A002AB

03 SUBTITLE MIL-DTL-18240

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.2.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

01 SEQ NO A002AC

03 SUBTITLE FF-S-86H

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.3.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

ITEM NO 3 CONTRACTOR

01 SEQ NO A003AA

03 SUBTITLE ELONGATION

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.1.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

SEQ. NO. A003

01 SEQ NO A003AB

03 SUBTITLE MIL-DTL-18240

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.2.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

01 SEQ NO A003AC

03 SUBTITLE FF-S-86H

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. E.3.

06 TECH OFFICE 2320.4

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)

CONTRACT/SOLICITATION ________________________________________________________________

ITEM ___________________________________________ (DATE FOR ITEM) ___________________

REQUIRED CERTIFICATION

A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL.

CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN

PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES,

INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND

SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.

CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR

COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART)

"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH

ALL CONTRACT REQUIREMENTS".

B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:

1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF

THE VENDOR OFFICIAL DESIGNATED RESPONSIBLE FOR QUALITY ASSURANCE.

2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART #, ETC.) SHALL BE INCLUDED

ON THE CERTIFICATE OF COMPLIANCE.

CERTIFICATE OF COMPLIANCE

COMPANY NAME

MATERIAL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)

CONTRACT NO. ______________ ORDER NO. ________________ ITEM NO. ____________________ NATIONAL/LOCAL STOCK NO. NSN/LSN ____________________________________________________ MANUFACTURER’S PART NO. _____________________________________________________________ MANUFACTURER’S SERIAL NO. ___________________________________________________________ DRAWING AND PIECE NO. _________________________________________________________________

MANUFACTURER’S LOT/HEAT NOS. AS MARKED ON THE MATERIAL _________________________

ALL INSPECTIONS AND TEST REPORTS REQUIRED BY ATTACHMENT I TO EXHIBIT A (DD FORM

1423) FOR TRACEABILITY TO EACH CONTRACT ITEM MUST ACCOMPANY THIS SIGNED

STATEMENT:

THE INSPECTION AND TEST REPORTS (AS APPLICABLE) PROVIDED REPRESENT THE ACTUAL

ATTRIBUTES OF THE ITEMS FURNISHED ON THIS CONTRACT AND INDICATE FULL

COMPLIANCE WITH ALL CONTRACT REQUIREMENTS. I ATTEST ALL ITEMS FURNISHED ON

THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS.

SIGNATURE ___________________________________________________ DATE _______________

QUALITY ASSURANCE OFFICIAL

File details come from the government source that posted it. Updated .