N3904026Q3035 Attachment 3 - Temp DH Parts Alternate Schedule.pdf

PDF 139 KB Posted

Attached to
Temp Dehumidification System - PNSY
Solicitation number
N3904026Q3035
Issued by

About this file

This document is a Temporary Dehumidification Equipment Lease Schedule for an alternate location at PNSY (presumably a naval shipyard). The schedule details the lease terms for multiple dehumidification components across two cooling seasons, including DCCU (Dehumidification Cooling Control Unit) units, a 230 Ton Chiller, Chilled Water Pump, various hoses, elbows, valves, and manifolds. The first season runs from 2/18/26 to 5/9/28, with specific arrival and return dates for each component. The second and third season schedule provides additional dates from 3/12/27 to 5/9/28. A notable option allows for equipment lease duration to be extended or decreased as required by the project, providing flexibility in the equipment rental terms.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .