This document is a set of Questions and Answers related to a Request for Quote (RFQ) for a Topside Diesel Generator rental/lease at the Point Loma Naval Base in San Diego, California.
The key details are: The generator will be used as the primary power source during docking and undocking evaluations, with an estimated runtime of less than 20 hours per evaluation. When not in use for the evaluations, the generator will be used as a standby unit, with a monthly 10-minute operational check. The period of performance is from June 25, 2024 through March 3, 2025, with one optional extension period. The solicitation will close on April 30, 2024 at 9:00 AM ET. Offerors must have an active CAGE code, be registered in SAM.gov, and not appear on the Excluded Parties List. This is a commercial item acquisition conducted under FAR Part 12 and Part 13.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
Q: Can you tell me how many hours a day the generator will be running during the 33 week rental or how many power operations are going to be performed? The SOW is confusing. It states in 1.1 the genset will be in PRIME power rating for the duration of the power operations. In 3.2.2 is says the genset will only operate “I assume run” for the operation “I assume power operations” (less than 24 hours) and will be in PRIME mode for the remainer of period. If that’s the case it will be in Prime mode for the entire Period of Performance.
1. SCOPE
1.1. A diesel-powered portable Tier 4 Final generator with a built-in fuel tank to be deployed on top of a submarine. Topside generators are considered to be PRIME power rating for the duration of power operations.
3. REQUIREMENTS
3.2.2. The diesel generator will most likely operate only for the operation (less than 24 hours) and will be in Prime mode for the remainder of the use period.
A: The generator will power the boat during the docking and undocking evaluation. During those evaluation it is the primary source of power to the boat, so when sizing a generator prime and standby ratings differ. The duration of those evaluations are unknow to me but would say less than 20 hours each.
When being utilized on the pier during the in dock portion of the avail it will be used as a standby unit.
The know run time will be 10 mins a month for and OP check. To my knowledge there isn’t a mode of operation to the ratings it’s a duration of the unit operating