This document is a Questions and Answers (Q&A) related to a federal contract opportunity for a Topside Diesel Generator for the Point Loma Naval Base in San Diego, CA.

The key details are:

  • The generator will primarily operate as the prime power source during docking and undocking evaluations, likely less than 20 hours each time. When not in use for the evaluations, the generator will be used as a standby unit.
  • This is a new requirement and there is no incumbent contractor.
  • The Period of Performance is 25 Jun 2024 through 3 Feb 2025, with one option period from 4 Feb 2025 through 3 Mar 2025.
  • The solicitation closes on 30 Apr 2024 at 9:00 AM ET local time.
  • The generator must meet all specifications outlined in the Statement of Work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

Q: Can you tell me how many hours a day the generator will be running during the 33 week rental or how many power operations are going to be performed? The SOW is confusing. It states in 1.1 the genset will be in PRIME power rating for the duration of the power operations. In 3.2.2 is says the genset will only operate “I assume run” for the operation “I assume power operations” (less than 24 hours) and will be in PRIME mode for the remainer of period. If that’s the case it will be in Prime mode for the entire Period of Performance.

1. SCOPE

1.1. A diesel-powered portable Tier 4 Final generator with a built-in fuel tank to be deployed on top of a submarine. Topside generators are considered to be PRIME power rating for the duration of power operations.

3. REQUIREMENTS

3.2.2. The diesel generator will most likely operate only for the operation (less than 24 hours) and will be in Prime mode for the remainder of the use period.

A: The generator will power the boat during the docking and undocking evaluation. During those evaluation it is the primary source of power to the boat, so when sizing a generator prime and standby ratings differ. The duration of those evaluations are unknow to me but would say less than 20 hours each.

When being utilized on the pier during the in dock portion of the avail it will be used as a standby unit.

The know run time will be 10 mins a month for and OP check. To my knowledge there isn’t a mode of operation to the ratings it’s a duration of the unit operating

7/1/24

Q: Will the government please clarify if there is an incumbent providing service on this contract or is this level of effort a new need? If there is an incumbent, can the government please provide the most recent contract award number & contract value?

A: This is a new requirement.