22R0006_Attachment_1_P307_Section_11_Appendix_P.pdf
PDF 383 KB Posted
- Attached to
- Mobile Crane and Qualified Crane Operator Services IDIQ- PNSY Federal contract opportunity
- Solicitation number
- N3904022R0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 22R0006 Amend 0002_Released.pdf | ||
| 22R0006 Amend 0002_Attachment 5_NAVFAC P307 Weight Handling Program Mgmt- Section 8.pdf | ||
| N3904022R0006-0001_Released.pdf | ||
| 22R0006_Attachment_4_Wage_Rates.pdf | ||
| N3904022R0006_FINAL_RFQ_22Oct21.pdf | ||
| 22R0006_Attachment_3_Sample Lifting Requirements.pdf | ||
| 22R0006_Attachment_1_ 01 35 26_Governmental Safety Requirements.pdf | ||
| 22R0006_Attachment_2_CNRMAINST 11262.1B Contractor Oversight.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC P-307
JUNE 2016
WEIGHT HANDLING
PROGRAM
MANAGEMENT
NAVFAC P-307 can be downloaded from https://www.navfac.navy.mil/ncc. To order printed copies, visit https://nll.ahf.nmci.navy.mil (PKI digital certificate required) or contact:
700 Robbins Avenue Philadelphia, PA 19111-5098 Phone: (215) 697-2626
DSN: 442-2626
Stock Number - 0525-LP-109-7546
Due to increased DoD security requirements, a System Authorization Access Request (SAAR) must be submitted in order to gain access to the Naval Logistics Library.
Contact the helpdesk above for information on the SAAR process and forms.
SECTION 11
CONTRACTOR AND OTHER NON-NAVY OWNED WEIGHT HANDLING EQUIPMENT
11.1 Contractor Operated Cranes (and Multi-Purpose Machines, MHE, and Construction Equipment When Used as Cranes to Lift Suspended Loads) and Rigging Equipment.
Non-Navy-owned cranes, multi-purpose machines, MHE, and construction equipment are frequently used on Navy property to lift suspended loads. Rigging equipment may be used with these machines or by itself in contractor weight handling operations. These cranes and equipment can be from a variety of sources and are generally incidental to construction contracts, ship repair contracts, demolition contracts, maintenance and other service contracts, and deliveries of supplies and equipment. Numerous organizations, including tenant activities, ships, supply departments, and FEAD/ROICCs have contracting authority and often the need for cranes is not anticipated when contract documents are written.
The following requirements apply to any contracted work utilizing cranes (and multi-purpose machines, MHE, and construction equipment used to lift loads suspended by rigging gear) and to all rigging equipment used in weight handling operations at a naval activity. These requirements do not apply to shipboard cranes or rigging equipment.
These requirements also do not apply to: commercial truck mounted and articulating boom cranes used solely to deliver material and supplies where the lift consists of moving materials and supplies (not prefabricated components, structural steel, or components of a systems-engineered metal building) from a truck or trailer to the ground; to cranes installed on mechanic’s trucks that are utilized solely in the repair of shore-based equipment; to cranes that enter the activity but are not used for lifting; nor other machines not used to lift loads suspended by rigging equipment. However, WHE accidents shall be reported in accordance with paragraphs 11.1.h and 11.1.i.
Navy activity (i.e., host activity) commanding officers shall promulgate the following minimum requirements to tenants and contracting officers for inclusion in contracts, statements of work, purchase orders, etc.
a. Require the contractor to comply with specific activity regulations pertaining to crane safety and operation (including allowable access routes and ground loading limitations), and to notify the contracting officer, in advance, of any cranes entering the activity or of any multi-purpose machines, MHE, or construction equipment that may be used in a crane-like application to lift suspended loads. Require the contractor to comply with applicable ANSI or ASME standards (e.g., ASME B30.5 for mobile cranes, ASME B30.22 for articulating boom cranes, ASME B30.3 for tower cranes, and ASME B30.8 for floating cranes, ASME B30.9 for slings, ASME B30.16 for overhead hoists, ASME B30.20 for below-the-hook lifting devices, ASME B30.21 for manually lever-operated hoists, ASME B30.26 for rigging hardware, ASME B30.
ANSI/ITSDF B56.6 for rough terrain forklifts, ANSI A10.31 for digger derricks, ANSI A92.2 for aerial lifts/platforms with hoists or “sign trucks”, ASSE A10.22 for personnel hoists). For cranes, machines, and rigging equipment at naval activities in foreign countries, the cranes, machines, and rigging equipment shall comply with the appropriate host nation safety standards. For floating cranes and barge-mounted mobile cranes, require a third party certification from an OSHA accredited
11-1 organization (or a third party certification from a state accredited organization for those states with OSHA approved state plans), a load indicating device, a wind speed indicating device, and a marine type list and trim indicator readable in one-half degree increments. Third party certification is not required for floating cranes and barge-mounted mobile cranes at Navy activities in foreign countries.
b. Require a certificate of compliance from the contractor (appendix P, figure P-1) that the crane (or other machine if used to lift suspended loads) and the rigging equipment meet applicable OSHA and ANSI/ASME regulations (with the contractor citing which OSHA and ANSI/ASME regulations are applicable, e.g., cranes/multi-purpose machines used in cargo transfer shall comply with 29 CFR 1917;
cranes/multi-purpose machines used in construction, demolition, or maintenance shall comply with 29 CFR 1926; cranes/multi-purpose machines used in shipbuilding, ship repair, or shipbreaking shall comply with 29 CFR 1915; aerial lifts/platforms (sign trucks) with hoists shall comply with 29 CFR 1926.453 and ANSI A92.2; personnel hoists shall comply with 29 CFR 1926.552 and ASSE A10.22; slings shall comply with ASME B30.9; rigging hardware shall comply with ASME B30.26). For cranes (or other machines used to lift suspended loads) and rigging equipment at naval activities in foreign countries, the contractor shall certify that the crane (or other machine) and the rigging equipment conform to the appropriate host nation safety standards. The contractor shall also certify that all of its crane (or other machine) safety devices are enabled and functioning properly, that all personnel working on the naval activity job site have been trained to not stand under or in the fall zone of a suspended load unless specifically allowed by USACE EM 385-1-1, and that operators have been trained to not bypass safety devices (e.g., anti-two block devices, LMI’s) during lifting operations. Require that the certifications be available on the crane or in the contractor’s on-site office for rigging operations.
c. For mobile cranes, commercial truck mounted cranes, and articulating boom cranes with OEM rated capacities of greater than 2000 pounds, require that the crane operator be designated as qualified by a source that qualifies crane operators (i.e., a union, a government agency, or an organization that tests and qualifies crane operators). Proof of current qualification shall be provided. Operators of cranes used in construction at activities under US jurisdiction shall follow the qualification and certification requirements of 29 CFR 1926.1427. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR.
d. Require the contractor to certify (appendix P, figure P-1) that the operator is qualified and trained for the operation of the crane or machine to be used.
e. For multi-purpose machines, MHE, and construction equipment used to lift loads suspended by rigging equipment, require proof of authorization from the machine OEM that the machine is capable of making lifts of loads suspended by rigging equipment. Written approval from a qualified registered professional engineer, after a safety analysis is performed, is allowed in lieu of the OEM’s approval. Require the contractor to demonstrate that the equipment is properly configured to make such lifts and is equipped with a load chart.
11-2
Note: MHE attachments covered by and used in accordance with NAVSEA SW023-AH- WHM-010 have been pre-approved for use with all MHE. These attachments are exempt from the OEM authorization requirement above.
f. Require that all hooks used on cranes, hoists, other machines, and rigging gear shall have self-closing latches or the throat opening shall be "moused" (secured with wire, rope, heavy tape, etc.) or otherwise secured to prevent the attached item from coming free of the hook under a slack condition. The following exceptions apply and shall be approved by the contractor’s technical organization: items where the hook throat is fully obstructed and not available for manual securing; and lifts where securing the hook throat increases the danger to personnel, such as forge shop, dip tank, or underwater work.
g. Require a critical lift plan for each of the following lifts: lifts over 75 percent of the capacity of the crane, hoist, or other machine (lifts over 50 percent of the capacity of a barge-mounted mobile crane’s hoists) at any radius of lift; lifts involving more than one crane, hoist, or other machine; lifts of personnel (lifts of personnel suspended by rigging equipment from multi-purpose machines, MHE, or construction equipment shall not be permitted); lifts made in the vicinity of overhead power lines (see subparagraph (7); erection of cranes; lifts of submerged or partially submerged objects (see exceptions in paragraph 10.4.1.e); lifts involving binding conditions; lifts of hazardous materials (see exceptions in paragraph 10.4.1.a); and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks. The plan shall include the following as applicable:
(1) The size and weight of the load to be lifted, including crane (or other machine) equipment and rigging equipment that add to the weight. The OEM's maximum load capacities for the entire range of the lift shall also be provided.
(2) The lift geometry, including the crane (or other machine) position, boom length and angle, height of lift, and radius for the entire range of the lift. Applies to both single and multiple-crane/machine lifts.
(3) A rigging plan, showing the lift points, rigging equipment, and rigging procedures.
(4) The environmental conditions under which lift operations are to be stopped.
(5) For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29 CFR 1926.1431. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.
(6) For barge mounted mobile cranes, barge stability calculations identifying crane placement/footprint; barge list and trim based on anticipated loading; and load charts based on calculated list and trim specific to the barge the crane is mounted on. The amount of list and trim shall be within the crane OEM’s requirements.
11-3
(7) For lifts in the vicinity of overhead power lines (i.e., if any part of the crane or other machine, including the fully extended boom of a telescoping boom crane or machine, or the load could approach the distances noted in figure 10-3 during a proposed operation), the plan shall demonstrate compliance with 29 CFR 1926.1408-1411. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.
h. Require the contractor to notify the contracting officer as soon as practical, but not later than four hours, after any WHE accident. (See definition in section 12.)
Require the contractor to secure the accident site and protect evidence until released by the contracting officer. Require the contractor to conduct an investigation to establish the root cause(s) of any WHE accident, near miss, or unplanned occurrence. Crane operations shall not proceed until the cause is determined and corrective actions have been implemented to the satisfaction of the contracting officer. The contractor shall certify (appendix P, figure P-1) that the operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.
i. Require the contractor to provide the contracting officer a report for an accident or near miss within 30 days using the appropriate form provided in section 12 consisting of a summary of circumstances, an explanation of causes(s), photographs (if available), and corrective actions taken. These notifications and reporting requirements are in addition to those promulgated by OPNAVINST 5100.23 and related command instructions.
j. Require the contractor to certify (appendix P, figure P-1) that signal persons employed in construction work are qualified in accordance with 29 CFR 1926.1428.
For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.
k. Require the contractor to certify (appendix P, figure P-1) that the riggers are qualified to perform the work by either signing a statement of compliance, providing proof of successful completion of a rigging apprenticeship by a union or other organization providing apprenticeship training, or proof of successful completion of training courses from a recognized source such as a trade union, a government agency, or an organization that tests and qualifies riggers.
l. The following additional documentation is required for contracts involving tower cranes:
(1) Foundation design and requirements.
(2) Installation instructions.
(3) Assembly and disassembly instructions including climbing/jumping instructions if applicable.
(4) Operating manual, limitations, and precautions.
11-4
(5) Periodic inspection and maintenance requirements.
For tower cranes at Navy activities in foreign countries, the tower cranes shall comply with the appropriate host nation safety standards and industry consensus safety standards (e.g., EN or ISO standards).
m. The following additional requirements apply to contracts involving work on telecommunication towers or with personnel hoists on telecommunication towers:
(1) Base mounted drum hoists used in communication tower work shall comply with TIA-1019, TIA-222G, ASME B30.7, and 29 CFR 1926.552 and 29 CFR 1926.553. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.
(2) When used for hoisting personnel, base mounted drum hoists shall comply with OSHA Instruction CPL 02-01-056; National Association of Tower Erectors standard “Base Mounted Hoist Mechanism Design Use Standard for Lifting Personnel While Working on Telecommunication Structures”; ANSI/ASSE A10.22; and AMSE B30.23 (or equivalent host nation safety standards for Navy activities in foreign countries).
(3) The use of a pickup truck or any other equipment besides a base mounted drum hoist for hoisting materials and/or personnel is prohibited.
(4) Rough-terrain forklifts, bulldozers, and similar equipment may be utilized for towing and anchorage purposes of guys. The use of such equipment for trolley/tag and load lines is prohibited, with the exception of using construction equipment for the sole purpose of anchorage that will not be moved during operations.
(5) Rigging gear utilized in communication tower work shall comply with the applicable ASME/OSHA standards. Operator, signal person, and rigger qualifications shall be in accordance with OSHA standards and this section.
For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR or ASME standards.
n. For construction contracts, follow the Unified Facilities Guide Specification UFGS-01 35 26 and U.S. Army Corps of Engineers EM-385-1-1 in lieu of paragraphs 11.1.a through 11.1.g, 11.1.j through 11.1.m, and appendix P, figures P-1 and P-2.
11.2 Contracting Officer Responsibilities
a. The contracting officer shall include the minimum requirements of paragraph
11.1 in contracts, ensure compliance with contract requirements, provide oversight of contractor crane and rigging operations, and provide oversight of contractor accident investigations and corrective actions. The degree of oversight shall be based upon the risk to personnel and property; however, oversight shall be performed at least once and the minimum periodicity shall be not more than every 30
11-5 days. When critical lifts are involved, oversight periodicity shall be not more than every 14 days. Appendix P, figure P-2, provides a checklist that shall be used during oversight of contractor crane and rigging operations. Copies of appendix P, figure P- 2, shall be kept on file for one year. Personnel performing oversight shall complete the Contractor Crane Awareness training course (see section 7) or the NAVFAC 40-hr Contract Hazard Awareness Training Course.
b. The contracting officer shall notify the host activity of any WHE accident upon notification by the contractor. Additionally, the contracting officer shall notify the Navy Crane Center, by e-mail ( nfsh_ncc_accident@navy.mil), of an accident involving a fatality, in-patient hospitalization, overturned crane, collapsed boom, or any other major damage to the crane or adjacent property as soon as possible, preferably within 8 hours of notification by the contractor. For all other accidents, notify the Navy Crane Center as soon as practical but no later than three working days after the accident.
c. The contracting officer shall provide the Navy Crane Center and host activity a copy of every accident and near miss report, regardless of severity, upon receipt from the contractor. These requirements are in addition to any notification and reporting requirements promulgated in OPNAVINST 5100.23 and command instructions.
When the contracting office is not in the local area, the contracting officer shall designate a local representative to ensure compliance with the above noted requirements. The contracting officer or designated weight handling representative shall sign all crane and rigging accident and near miss reports to indicate that they are satisfied that the contractor's investigation and corrective action are sufficient.
d. For construction contracts, the forms in U.S. Army Corps of Engineers EM-385- 1-1 are acceptable in lieu of paragraph appendix P, figure P-2.
11.3 Host Activity Responsibilities. The host activity shall ensure that contracts contain the above requirements, concur with the contracting officer’s oversight plan, ensure that the oversight plan is being carried out, and provide oversight of contractor accident and near miss investigations and corrective actions.
11.4 Other Non-Navy-Owned Cranes and Rigging Equipment at Naval Activities.
11.4.1 Rented or Leased Cranes or Other WHE Operated by Navy or BOS Contractors and Cranes and Rigging Equipment Owned and Operated by BOS Contractors and by Contractors Engaged in NAVSEA OP-5 Operations in the United States and its Territories.
Cranes shall be inspected, load tested, and certified to the requirements of section 4 prior to use (except for appendix E hook NDT requirements). Other WHE shall be inspected, tested, and marked in accordance with section 14 requirements. For third party certified mobile cranes that cannot be load tested to the specified overload tests of this publication due to OEM restrictions or designs that prevent periodic overload tests, the cranes shall be down rated to 90 percent of the OEM's rated capacity (80 percent for non-mobile cranes) and tested to the requirements of this publication. For long term-leases (over 4 months) and for BOS contractor owned cranes, the maintenance and inspection requirements of section 3 and appendix E hook NDT requirements shall also apply. Additionally, an
11-6 equipment history file in accordance with section 5, containing those documents required by sections 3 and 4 and their applicable appendices, shall be maintained on each crane.
These history files shall be retained for one year after the end of the lease (seven years if the crane is involved in a crane or rigging accident). These requirements shall be included in applicable contracts. See paragraph 4.8 for third party certification requirements.
Crane operators shall be licensed/qualified in accordance with the requirements of section 8 (this includes BOS contractor personnel). Crane operations and accident reporting shall be in accordance with sections 9, 10, and 12 (BOS contractor crane and rigging accidents shall be treated and reported as Navy crane and rigging accidents). Rigging equipment and usage practices shall be in accordance with section 14.
11-7
(INTENTIONALLY LEFT BLANK)
11-8
APPENDIX P – CONTRACTOR CRANE (OR ALTERNATE MACHINE USED TO LIFT
SUSPENDED LOADS) AND RIGGING GEAR REQUIREMENTS
CERTIFICATE OF COMPLIANCE
This certificate shall be signed by an official of the company that provides cranes (or multi-purpose machines, MHE, or construction equipment used to lift loads suspended by rigging gear) or rigging gear for any application under this contract. Post a completed certificate on each crane or alternate machine (or in the contractor’s on-site office for rigging operations) brought onto Navy property.
CONTRACTING OFFICER’S POINT OF CONTACT
(Government Representative)
PHONE
PRIME CONTRACTOR/PHONE CONTRACT NUMBER
CRANE OR ALTERNATE MACHINE SUPPLIER/PHONE
(if different from prime contractor)
CRANE OR
ALTERNATE MACHINE
NUMBER (i.e., ID number)
CRANE OR ALTERNATE MACHINE MANUFACTURER/TYPE/CAPACITY
CRANE OR ALTERNATE MACHINE OPERATOR'S NAME(S)
I certify that
1. The above noted crane or alternate machine and all rigging gear conform to applicable OSHA regulations (host nation regulations for naval activities in foreign countries) and applicable ASME B30 or other standards. The following OSHA regulations and ASME or other standards apply:________________________________________________________
2. The operators noted above have been trained and are qualified for the operation of the above noted crane(s) or alternate machine(s).
3. All safety devices and operator aids are enabled and functioning properly and the operators noted above have been trained not to bypass safety devices and operator aids during lifting operations.
4. The operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.
5. Signal persons used in construction work are qualified in accordance with 29 CFR 1926.1428.
6. Riggers are qualified in accordance with NAVFAC P-307, paragraph 11.1.k.
7. All personnel working on the job site have been trained to not stand under a load or in the fall zone of a suspended load unless specifically allowed by USACE EM 385-1-1.
COMPANY OFFICIAL SIGNATURE DATE
COMPANY OFFICIAL NAME/TITLE
POST ON CRANE (OR ALTERNATE MACHINE)
(IN CAB OR VEHICLE)
(or in the contractor’s on-site office for rigging operations) Figure P-1
P-1
CONTRACTOR CRANE OR RIGGING OPERATION CHECKLIST
YES NO N/A
1 Is the Certificate of Compliance, P-1, in the operator’s cab (or in the contractor’s on-site office for rigging operations) with the current operator’s name listed?
2 Is the crane/machine transited to and from the job site correctly? Are the OEM instructions for travel being followed?
3 Does the operator know the weight of the load to be lifted?
4 Is the load to be lifted within the crane/machine manufacturer's rated capacity in its present configuration?
5 Are outriggers/stabilizers required and, if so, are they properly extended and down?
6 If outrigger/stabilizers are used, and the wheels are not off the ground is this the correct setup in accordance with the OEM?
7 Is the crane/machine level and on firm ground, or if the ground is not firm are adequate supporting materials provided?
8 If supporting materials are provided, is the entire surface of the outrigger/stabilizer pad supported and is the supporting material of sufficient strength to safely support the loaded outrigger/stabilizer pad?
9 If outriggers/stabilizers are not used, is the crane/machine rated for on-rubber lifts by the OEM’s load chart?
10 Is the swing radius of the crane counterweight clear of people and obstructions and are accessible areas within the swing area barricaded to prevent injury or damage?
11 Has the hook been centered over the load in such a manner to minimize swing?
12 Is the load well secured and balanced in the sling or lifting device after it is lifted a few inches for verification?
13 Is the lift and rotation path clear of obstructions?
14 If rotation of the load being lifted is hazardous, is a tagline or other restraint being used?
15 Are personnel prevented from standing or passing under a suspended load?
16 Is the operator paying full attention to the signal person?
17 Are proper signals being used? Is the operator responding properly to the signals? Are radios used for blind lifts?
18 Are empty hooks lashed or otherwise secured during travel to prevent swinging?
19 Does the operator remain at the controls while the load is suspended?
20 Does the operator ensure that side loading is prohibited?
21 Are personnel prevented from riding on a load?
22 Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?
23 Is the lift a critical lift?
24 If so, is a lift plan provided and understood and check-off sheets initialed and signed off?
25 If overhead power lines are in the vicinity, is a critical lift plan provided addressing the requirements of 29 CFR 1926.1407-1411?
26 If pick and carry operations are allowed and performed, are OEM directions followed (e.g. rotation lock engaged, boom centered over front or rear, etc.)?
27 When the crane/machine is left unattended, is it in a safe condition?
28 Is rigging gear undamaged and acceptable for the application?
Figure P-2 (1 of 2)
P-2
YES NO N/A
29 Does rigging gear meet applicable ASME or host nation standards (e.g., ASME B30.9 for slings, B30.10 for hooks, B30.26 for rigging hardware such as shackles, safety hoist rings, and eyebolts, B30.20 for below the hook lifting devices)?
30 Was the rigging gear inspected prior to use?
31 Is sling protection used to protect slings (especially synthetic slings) and equipment from damage due to abrasion and sharp corners and edges?
32 Is the rigging gear used in accordance with its working load limit?
Is the working load limit marked on the rigging gear?
33 Are positive latching devices (or “mousing”) used on crane and rigging hooks?
34 If a mobile crane is used on a barge, are all rules of 29 CFR 1926.1437(construction) being followed?
35 If a mobile crane is used on a barge are the outriggers/stabilizers blocked or are the crawlers traveling in a defined space as allowed by 29 CFR 1926.1437 (construction)?
36 For floating cranes, are rules of 29 CFR 1915 (ship repair) or 29 CFR 1926.1437 (construction) being followed?
37 If a multi-purpose machine, forklift, or construction equipment is being used, is there proof from the OEM (or qualified PE) that the machine is approved for suspended load lifting and is there a load chart?
38 If a personnel lift is being performed with a crane or base mounted hoist, are all requirements of NAVFAC P-307, paragraph 11.1.g(5) for a crane or 11.1.m for a base mounted hoist being followed?
Contractor: Subcontractor:
Location: Date:
Notes:
Signature of Government Representative:
Figure P-2 (2 of 2)
P-3
(INTENTIONALLY LEFT BLANK)