This document is an amendment to Solicitation N33191-24-R-0034 for the D-B Refurbishment of the NDLEA Law Enforcement Office in Lagos, Nigeria. The amendment includes responses to pre-proposal inquiries (PPIs) received from potential offerors.
The key details are:
- The period of performance is 205 days. If the project is completed ahead of schedule, the contractor will be eligible for early payment upon completion of the contract closeout documents.
- Companies based in the country where the construction will take place are eligible to bid as prime contractors if they meet the RFP requirements.
- Either standard 8.5 ft or high cube 9.5 ft containers are acceptable for the project.
- Alternative exterior and interior wall cladding materials such as fiber cement, metal, and composites are acceptable, subject to review and approval during the design phase.
- The specific location of the NDLEA office in Lagos is provided, including GPS coordinates.
- No additional PPIs will be accepted after July 25, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N33191-24-R-0034 Amendment 0002 Proposal submission via Email or PIEE.pdf | ||
| N3319124R0034 Attach 3 DFARS 252.229-7001 Tax Relief.docx | DOCX document | |
| N3319124R0034 Attach 2 PPI.docx | DOCX document | |
| N3319124R0034 DB Refurbishment Law Enforcement Office Nigeria.pdf | ||
| N3319124R0034 Attach 4 Corp Experience Contract Data Sheet.docx | DOCX document | |
| N3319124R0034 Attach 5 Safety Checklist.docx | DOCX document | |
| N3319124R0034 Attach 6 Past Performance Questionnaire.docx | DOCX document | |
| N3319124R0034 Attach 1 PTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Included Pre-Proposal Inquiries w ith Governement Responses as of 24th July 2024.
Pre-Proposal Inquiries w ill not be accepted after 25th July 2024.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N3319124R0034
X 9B. DATED (SEE ITEM 11)
01-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jul-2024
CODE
NAVFAC EUROPE AFRICA CENTRAL
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3319124R0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The Issued By organization has changed from
NAVFAC EUROPE AFRICA CENTRAL
VIALE PORTO CAPODICHINO
NAPOLI 80144
to
NAVFAC EUROPE AFRICA CENTRAL
PSC 817 BOX 51
FPO AE 09622-0051
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been added by full text:
PRE-PROPOSAL INQUIRIES (PPIS)
Solicitation N33191-24-R-0034, D-B Refurbishment NDLEA Law Enforcement Office, Lagos, Nigeria Amendment No. 1 Pre-Proposal Inquiry (PPI) Questions / Responses
Note: Additional Pre-Proposal Inquiries (PPIs) will not be responded to as of 25th July 2024.
Question 1: The project has a stipulated duration of 205 days. If the project is completed ahead of schedule, will the contractor be eligible for early payment upon completion, or will the payment be made based on the originally prescribed duration?
GOV RESPONSE 1: Yes, the Government will pay the final invoice upon receipt of the identified contract close-out documents listed in the RFP even if the Contractor completes the work prior to the end of the listed period of performance.
Question 2: If a company based in the country where the construction will take place meets the requirements in the RFP, will they be considered for the contract award as the prime contractor or Sub contractor?
GOV RESPONSE 2: Yes, follow the solicitation requirements for submission as noted in the RFP.
Question 3: Should the height of the container be a standard dry 8.5 feet (2.591 meters) or a high cube
9.5 feet (2.896 meters)?
GOV RESPONSE 3: Either Standard for High Cube containers are acceptable.
N3319124R0034
Question 4: Interior Wall Construction- KTR to provide all wood cladding for internal wall configurations.
At partition between the bathroom and shower space provide a HDPE moisture/mold resistant durable partition. Provide appropriate wall construction to support the installation of the exterior and interior doors. Provide appropriate wall construction to support the installation of the windows. Can we add cladding to the exterior and interior parts of the container office? What types of cladding are allowed for Exterior, if any?
GOV RESPONSE 4: Alternative exterior and interior wall cladding and configurations are acceptable to meet local environmental resistance and durability challenges inclusive of but not limited to the following; Fiber Cement Cladding, Metal Cladding aluminum or steel, and/or Composite Cladding.
Government will review all material selections during the design phase of the Design-Build contract as submitted by the Contractor's DOR for acceptance and continuation to the Notice-To-Proceed to Construction.
Question 5: Will you please clarify the location for the NDLEA office in Lagos?
GOV RESPONSE 5: The site listed in the PTS is accurate.
GPS pin is moved slightly south based on where the entry is to the facility;
GPS: 6.453103276984494, 3.4440375178864824
Please see below a photo of the building from street view to confirm location for potential venders.
(End of Summary of Changes)