N3319123R4002 Construct Fire Rescue Station_Attach 6 - Safety Checklist.pdf
PDF 98 KB Posted
- Solicitation number
- N3319123R4002
About this file
This document contains an attachment to a federal solicitation for the design-build construction of a fire and rescue station in Moldova. The attachment outlines safety checklist requirements for the project. Contractors must provide a site safety and health officer who has five years of continuous safety experience and a 30-hour OSHA construction safety class certification within 30 days of award. A safety plan is required to monitor personnel and subcontractor performance. Contractors and subcontractors must comply with U.S. Army Corps of Engineers safety manual EM 385-1-1 regarding personal protective equipment, including steel-toed shoes, helmets, vests, gloves, and eye and ear protection. Shoring is required for any excavation work. At least five hard hats must be provided for authorized visitors. The contractor's price must include all costs for safety requirements on the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6
Safety Checklist Form
The contractor shall comply with local safety regulations, unless the U.S. Safety Regulations included in the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) are more strict and not in conflict with the local regulations. In this case, U.S Safety Regulations shall apply. The EM 385-1-1 can be downloaded from the following website:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1_English_2003.pdf
Safety Checklist Requirements Within 30 days of award of the contract, the contractor will provide a safety plan to monitor personnel performance during construction, and identify one competent employee in accordance with EM 385-1-1 to ensure execution of the safety plan.
The contractor will provide a full-time, on-site Site Safety and Health Officer (SSHO) that meets the requirements of the EM 385 Section 01.A.17, specifically:
- Five (5) years of continuous general industry or construction safety experience in supervising/managing general industry or construction (managing safety programs or processes or conducting hazard analyses and developing controls).
Documentation for validation is required within 30 days of contract award.
- Completion of 30-hour OSHA Construction Industry safety class (may be web-based training if the student is able to directly ask questions of the instructor by internet or phone). Documentation for validation and proof of completed training is required within 30 days of contract award.
The contractor will provide a plan to monitor all subcontractor performance during construction if subcontractors will be used. The contractor and subcontractors must also comply with EM 385-1-1.
The contractor shall provide all necessary and required Personal Protective Equipment (PPE), which shall be used as required by the specific risk.
Steel toed shoes
Helmets
Vests and gloves
Eye and ear protection
Shoring for excavation, as needed
The use of helmets or "hard hats" is absolutely required for all personnel entering the job site. In addition the contractor shall have a minimum of 5 new hard hats to be used by any authorized visitor to the job site.
The contractor's price shall include the cost for any and all safety requirements for this project.
As a certified agent of this Company, I acknowledge and agree to the safety factor requirements.
Company Name:
Contractor's Printed Name:
Contractor's Signature:
Date:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf
File details come from the government source that posted it. Updated .