Electricity Supply at US Military Installations Throughout Italy
Solicitation number
N33191-22-R-4014
Issued by

View the file

Other files

File Type Posted
N33191-22-R-4014 Amendment 0001.pdf PDF
N33191-22-R-4014 Elec Service Italy.pdf PDF
N33191-22-R-4014 Elec Service Italy.pdf PDF
N33191-22-R-4014_J-200000-03 Final.xlsx XLSX spreadsheet
N33191-22-R-4014_J-200000-01 Final.docx DOCX document
N33191-22-R-4014_J-200000-02 Final.xlsx XLSX spreadsheet
N33191-22-R-4014_J-200000-06_NV1.xlsx XLSX spreadsheet
N33191-22-R-4014_J-200000-05 Final.docx DOCX document
N33191-22-R-4014_J-200000-04 Final.xlsx XLSX spreadsheet
N33191-22-R-4014_J-200000-06_AF1.xlsx XLSX spreadsheet
N33191-22-R-4014_J-200000-06_NV2.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0002 is to answ er Pre-Proposal Inquiries, update Article 12; as w ell as, extend the proposal due date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N3319122R4014

X 9B. DATED (SEE ITEM 11)

19-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2022

CODE

NAVFAC EUROPE AFRICA CENTRAL

PSC 817 BOX 51

FPO AE 09622-0051

N33191 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3319122R4014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

PRE-PROPOSAL INQUIRY RESPONSES

PPI 1 Question (ENG): The date of award (end date of validity of the tender) and the method of communication of the outcome of the tender are requested.

PPI 1 Answer (ENG): Award will be made no later than July 22. The successful awardee will be notified via email the same day.

PPI 1 Question (ITA): Si chiede la data di aggiudicazione (data fine validità offerta) e la modalità di comunicazione dell’esito della gara.

PPI 1 Answer (ITA): Il contratto verra’ aggiudicato non oltre il 22 luglio. L’aggiudicatario verra’ notificato lo stesso giorno via email.

PPI 2 Question (ENG): The signature of the offer as it should be, scanned handwritten, digital signature.

PPI 2 Answer (ENG): Signature on offer can be either digital or scanned handwritten.

PPI 2 Question (ITA): La firma dell’offerta come deve essere, autografa scannerizzata, firma digitale.

PPI 2 Answer (ITA): La firma dell’offerta puo’ essere sia autografa scannerizzata sia firma digitale.

PPI 3 Question (ENG): ARTICLE 9 Addition and Termination of Services. You are asked to specify that any sites added can only be with destination "other uses" (so they can not be for home use) PPI 3 Answers (ENG): Only <<other than dwellings uses>> service points shall be added under this contract.

PPI 3 Question (ITA): ARTICLE 9 Addition and Termination of Services. Si chiede di specificare che i siti eventualmente aggiunti possono essere solo con destinazione “altri usi” (quindi non possono essere per uso domestico) PPI 3 Answer (ITA): I siti eventualmente aggiunti sotto questo contratto avranno esclusivamente destinazione <<altri usi>>.

PPI 4 Question (ENG): With reference to access to the measurement data, and for the values relating to the supply period prior to the current month, is it possible to consider the 15th of the month as the date from which the data are to be considered available as non-binding? In addition, is it possible to use the web portal independently for their extraction?

PPI 4 Answer (ENG): As provided in Art. 2, interval data availability is “subject to the metering data submission from the Distributor”. Therefore, the monthly day 15 deadline shall not be binding to the Vendor who will promptly make the data available once submitted by the Distributor. Prompt data publication on the vendor’s web portal fulfills this requirement.

PPI 4 Question (ITA): In riferimento all’accesso ai dati di misura, e per i valori relativi al periodo di fornitura precedente al mese in corso, è possibile considerare non vincolante il 15 del mese come data a partire dalla quale i dati dovranno essere considerati disponibili? Inoltre, è possibile utilizzare in autonomia il portale web per la loro estrazione?

PPI 4 Answer (ITA): Come specificato all’Art. 2, la disponibilita’ dei dati di misura è “soggetta alla pubblicazione dei dati da parte del Distributore”. Pertanto la scadenza del 15 del mese non puo’ considerarsi vincolante per il Fornitore, il quale rendera’ i dati prontamente disponibili una volta pubblicati dal Distributore. La tempestiva pubblicazione di tali dati sul portale web del venditore soddisfa questo requisito.

PPI 5 Question (ENG): Is it possible to agree that any tariff change (system charges, transmission and metering distribution services, dispatching) is transposed directly within the first useful billing cycle following it?

PPI 5 Answer (ENG): Any change to the regulated pass-thru tariff (system charges, transmission and metering distribution services, dispatching) can be applied to the first available bill.

PPI 5 Question (ITA): E’ possibile condividere che qualsiasi modifica tariffaria (oneri di sistema, servizi di distribuzione trasmissione e misura, dispacciamento) sia recepita direttamente all’interno del primo ciclo utile di fatturazione successivo ad essa?

PPI 5 Answer (ITA): Qualsiasi modifica alle tariffe regolate e passanti (oneri di sistema, servizi di distribuzione trasmissione e misura, dispacciamento) puo’ essere recepita all’interno del primo ciclo utile di fatturazione.

PPI 6 Question (ENG): The full billing cycle could end at the end of the month, so can it be considered non-binding that the invoici Il ciclo completo di fatturazione potrebbe concludersi al termine del mese, è possibile pertanto considerare non vincolante che la fatturazione si concluda entro e non oltre il 20° giorno del mese successivo al periodo di fornitura?

PPI 6 Answer (ENG): Article 12 “Invoice and Payment” states that “The Supplier shall issue invoices on a monthly basis, normally no later than the 20th day of the month”. “Normally” means that under unusual and justified circumstances bills may be issued later than the 20th of the month.

PPI 6 Question (ITA): Il ciclo completo di fatturazione potrebbe concludersi al termine del mese, è possibile pertanto considerare non vincolante che la fatturazione si concluda entro e non oltre il 20° giorno del mese successivo al periodo di fornitura?

PPI 6 Answer (ITA): All’ Articolo 12 “Invoice and Payment” si afferma che “Il Fornitore emettera’ le fatture a cadenza mensile, normalmente non oltre il 20mo giorno del mese”. Con “normalmente” si intende che in circostanze insolite e giustificate le fatture possono essere emesse oltre il 20 del mese.

PPI 7 Question (ENG): Is it possible not to agree on the manual sending by the supplier of the summary list of all the area turnovers, considering the possibility of independent extraction of data from the web portal?

PPI 7 Answer (ENG): The “Summary Invoice Sheet” issued by the vendor is required by Article 12 “Invoice and Payment”. Article states that “The Summary Invoice will constitute an official paying document equivalent to a payable invoice”. Following the award of the contract, the possibility of accessing the supplier's portal, the extraction of each “Summary Invoice Sheet” and its completeness will be assessed for compliance with Article 12 provisions.

PPI 7 Question (ITA): E’ possibile non concordare l’invio manuale da parte del fornitore dell’elenco riepilogativo di tutti i fatturati di zona, considerando la possibilità di estrazione in autonomia dei dati dal portale web?

PPI 7 Answer (ITA): Il “Summary Invoice Sheet” prodotto dal fornitore e’ richiesto come da Articolo 12 “Invoice and Payment”, ove si afferma che “L’elenco-fattura riepilogativo costituira’ un documento ufficiale ai fini del pagamento degli importi fatturati”. Successivamente all’aggiudicazione della gara sara’ valutata la possibilita’ dell’accesso al portale del fornitore, dell’estrazione dei dati e valutata la loro completezza secondo quanto richiesto all’articolo 12.

PPI 8 Question (ENG): Is it possible not to consider binding the sending of pdfs by email by the supplier, but to proceed with their extraction directly from the web portal?

PPI 8 Answer (ENG): Invoices shall be issued by the vendor in accordance with solicitation, specifically Articles 11 and 12.

PPI 8 Question (ITA): E’ possibile non considerare vincolante l’invio dei pdf via email da parte del fornitore, ma procedere alla loro estrazione direttamente dal portale web?

PPI 8 Answer (ITA): Le fatture vanno emesse dal venditore in conformità al bando, in particolare gli articoli 11 e 12.

PPI 9 Question (ENG): It is possible to consider exhaustive the presence of the contract number in the pdf PPI 9 Answer (ENG): To make the invoice payable by the US Government, the US Government contract number shall be reported on each invoice sent by email in pdf format and on each “Summary Invoice Sheet.”

PPI 9 Question (ITA): E’ possibile considerare esaustiva la presenza del numero contratto all’interno del pdf PPI 9 Answer (ITA): Per rendere le fatture pagabili dal Governo USA, il numero di contratto del Governo dovra’ essere riportato su ciascuna fattura da inviare tramite email e su ciascun “Summary Invoice Sheet.”

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Jun-2022 05:00 PM to 22-Jun-2022 05:00 PM.

SECTION G - CONTRACT ADMINISTRATION DATA

The following have been modified:

INVOICING INSTRUCTIONS

Article 12. Invoice and Payment

The Supplier shall issue invoices on a monthly basis, normally no later than the 20th day of the month following the supply period. At the same time it issues the invoices, the Supplier shall also provide a copy of the transport bill issued by the Distributor if available or, alternatively, a copy of the spreadsheet reporting the detailed transport costs for all the accounts.

All invoices shall be based on metered quantities at the service point for each account. The Supplier may only invoice for charges allowed under the terms and conditions of this contract. In no event shall the Supplier separately invoice amounts that are already included in the offered price, as provided for under Article 4 “Price of Electrical power Supply.”

All invoices shall comply with ARERA’s transparency regulations, including ARG/com 202/09 and subsequent modifications as applied to electrical power users in the Free Market.

If the Distributor has not provided the Supplier a monthly meter reading on an account, the Supplier shall issue invoices with estimates based on historical consumption. The Supplier shall adjust all estimated invoices on the first billing cycle after the Distributor bill provides the mater reading for the account.

In case NAVFAC EURAFCENT detects errors or inaccuracies in the invoices and gives written notice to the Supplier, such invoices will be put on hold until the issue is settled and the amount of the undue charge will be credited on the following bill. In the event of errors in billing, NAVFAC EURAFCENT will not be liable for a late payment or additional charges.

In case it is determined any charge invoiced by the Supplier is incorrectly billed to NAVFAC EURAFCENT, the Supplier shall credit the excess amount on the relevant account.

Credits due to NAVFAC EURAFCENT will be indicated in the next invoice(s). Credits, debts, and invoice whole cancellation (fatture di storno) may likewise be compensated in the next summary invoice report, as long as the net total amount is a debit and after exchange of checks and communications between the supplier and the relevant US Government office.

If there is a credit after contract expiration, the Supplier shall reimburse NAVFAC EURAFCENT via electronic fund transfer (EFT) or bank transfers to a United States Government (USG) Euro bank account. NAVFAC EURAFCENT will provide an appropriate EFT routing information when required. The bank transfer shall include all information needed to identify reference invoices and credits.

The Government cannot accept stand-alone credit invoices. The Government can only accept credit invoices if in a debit amount. The Supplier shall notify NAVFAC EURAFCENT in advance if it intends to issue a credit invoice.

All invoicing shall be based on metered quantities at the service point for each account.

The Government will normally pay invoices within 45 calendar days receipt through e-mail of a complete and proper invoice to the office designated whose email addresses are provided below.

Within 15 working days after contract award, the Supplier shall provide NAVFAC EURAFCENT with the information required to pay invoices via bank transfer. The Supplier shall email this information directly to the emails below and the Contracting Officer.

The Contracting Officer may determine that another method of payment besides bank transfer is appropriate for one or more areas of supply. The Contracting Officer will notify the Supplier as appropriate.

The Supplier shall promptly notify the Contracting Officer of any change affecting the payment of invoices.

If the Government payment is delayed beyond 45 days after receipt of the invoice, the invoiced amount will be increased by applying the current Legal Interest rate (Tasso di Interesse Legale and/or Tasso di Interesse Moratorio) established by law. The interest rate will be as published in the Gazzetta Ufficiale.

NAVFAC EURAFCENT will perform payments only upon receipt of specific invoices, including but not limited to one-time amounts due to the distributor for connection charges. Cost estimates/proposals are not considered substitute to invoices. Official acceptance of a cost proposal and following contract modification, constitute an obligation to pay the accepted amount(s).

Submission of Invoices.

The accounts listed in attachment J-20000-02 shall be addressed to different competent offices as indicated below:

“The Supplier may submit paper invoices, only if required by Italian or Supplier’s internal regulation, to the following addresses:

For accounts in Aviano area (AF1-Oth):

o 31CES/CEO - Area C USAF o Via Aeroporto, 33081 Aviano (PN) o Attn: Mr. Mauro Bomben

For NSA Naples area (NV1):

o U.S. Naval Support Activity Naples o Public Works Department - Utility Branch BLDG 407 1st floor. Viale Porto, Box 22, Aeroporto di

Capodichino 80144 Napoli o Attn: Luca Guadagnuolo - Nicola Tortorella

For NAS Sigonella area (NV2):

o U.S. Naval Air Station 2 Sigonella Public Works Officer - Budget Dept.

o S.P. 69/11- Sigonella, 95121 Catania o Attn: Mr. Antonino Piluso

The Supplier shall email a pdf of all invoices to the following email addresses:

For accounts in Aviano area (AF1-Oth):

NAVFAC_AF_UT_BILLING@eu.navy.mil For NSA Naples area (NV1):

NAVFAC_NAP_UT_BILLING@eu.navy.mil For NAS Sigonella area (NV2):

NAVFAC_SIG_UT_BILLING@eu.navy.mil

Invoices shall be grouped per area and sent in a single email. In the case that email and attached file exceeds the size of 5MB, the email shall be divided into multiple emails (clearly labeled “1 of n”, “2 of n”, etc) each one of approximately 5MB or less. No file .zip will be acceptable.

The official receipt date will be the date the invoices are emailed to the respective points of contact.

The Supplier shall provide a Summary Invoice Sheet, per area, on letterhead. The summary shall be dated and numbered and shall show an accurate list of invoices issued on the same date, including the relevant amounts, account POD codes, account ID codes, single invoice numbers, billed quantities (metered or estimated) and the total amount at the bottom. In addition, the summary invoice shall include the contract number, the unit price set by the contract, the name, title, phone number, email and mailing address of the Supplier point-of-contact in the event of a defective invoice or any other clarifications regarding the invoices. The Summary Invoice will constitute an official paying document equivalent to a payable invoice. All information shall be as accurate as the ones included in each single invoice. Each summary invoice shall be identified with a unique number, to be defined by the Supplier before the start of the period of performance.

For each Area (AF1, NV1 and NV2), at any billing cycle, the Supplier shall provide a summary list of all invoiced area accounts. Each summary list shall be designated with an own serial number, and for each account, it shall list at a minimum: account POD code, Fiscal Code, Location, consumption period, consumption, if consumption is actual metered (Y/N), amount billed, and a total amount of all invoiced bills included in the summary list. The Government will provide a template of the summary list upon contract award. Such a total amount will be payable as a lump sum making reference to the summary serial number.

If the invoice file cannot be sent electronically via email in PDF format because of server size limitations or any other serious technical problem, the invoice file may be sent on a CD or DVD via courier, express mail or a similar mail service. If this alternative method of delivery is used, the Supplier will provide email notice to NAVFAC EURAFCENT regarding this alternative method. The alternative method of delivery must ensure mailing is made within the following workday of the invoice date. The date the package is received by the U.S. NAVFAC EURAFCENT will be considered the official receipt date. It is the Suppliers responsibility to send an email and receive confirmation that the invoice was received by NAVFAC EURAFCENT.

(End of Summary of Changes)