Amendment 005 Eidts to Filter Specs.pdf

PDF 162 KB Posted

Attached to
D-B Africa First IDIQ Multiple Award Construction Contract (MACC), Djibouti, Africa
Solicitation number
N3319122R4007
Issued by

View the file

Other files

File Type Posted
Amendment 004.pdf PDF
Amendment 003.pdf PDF
Amendment 002.pdf PDF
22R4007_AMD01FINAL.pdf PDF
N3319122R4007 Africa First RFP.pdf PDF
N3319122R4007 Africa First Attach PPQ.docx DOCX document
N3319122R4007 PPI.docx DOCX document
Africa First Project Data Sheet Attach D.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5902187

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Provide edited SOW for Part 3 STATE OF WORK/PROJECT PROGRAM - page 5 See Continuation page for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Dec-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3319122R4007

X 9B. DATED (SEE ITEM 11)

24-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Dec-2023

CODE

NAVFAC EUROPE AFRICA CENTRAL

PSC 817 BOX 51

FPO AE 09622-0051

N33191 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3319122R4007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 005

The purpose of Amendment 0005 is to replace Part 3 STATEMENT OF WORK/PROJECT PROGRAM – page 5 of the SOW in its entirety with the below information designated as Part 3 STATEMENT OF WORK/PROJECT PROGRAM – page 5.1 and 5.2 of the SOW or page 24.1 and 24.2 of the SOW in PDF pages counting from the beginning.

CNIC-321, Reverse Osmosis Train Header Replacement/ UV light reactor replacement, CLDJ WON 1727099 Camp Lemonnier, Djibouti, Africa

8. All gaskets are to be EPDM. All provided stainless steel materials including but not limited to pipes, fittings and fasteners are to be SS 316L

9. Unless otherwise specified, pipe schedule, wall thickness and diameter is to match existing pipes.

Stainless steel and plastic header pipes and fittings to all four RO trains must be provided.

10. Provide CPVC pipes, fittings and accessories with same specification as existing to install the provided cartridge filter housing. Filter housings must be installed in orientation instructed in the attached P-102 New Pipe Layout of RO Train drawing at part 6 of this RFP. Filter housing must be installed per manufacturer’s recommendation. Pipe provision for filter housing must be performed to all four RO trains.

11. Provide CPVC pipes and fittings with the same specification as existing to connect the supply and discharge line of the removed UV treatment device.

12. All SS and plastic pipe headers provision will start from line entering cartridge filters and terminate at line exiting RO membranes. See photos in the attachment at part 6 of this RFP to determine the location where the work will start and terminate.

13. All works must be performed to all four RO trains

14. Conduct cleaning and flushing, pressure leak test, disinfecting with the presence of Contracting Officer or Government Representative on the provided pipe lines in accordance with latest version of

IPC.

F10 SPECIAL CONSTRUCTION

Provide SWTR compliant filter insert and cartridge. The regulations require that cartridge filters be challenge-tested by an independent laboratory in order to receive Cryptosporidium removal credit. The challenge testing must demonstrate a minimum of 3.0-log removal, including a 1-log removal safety margin, for individual cartridge filters to obtain a 2.0-log removal credit. Replacement filter vessels must provide a capacity of approximately 300 gpm for each RO train (3 x 100 gpm cartridge filter units in parallel). The filter characteristics must meet Challenge Testing for Cryptosporidium. All components used in drinking water treatment process should be evaluated for contaminant leaching and certified under ANSI/NSF Standard 61. The filter housing and cartridge must be challenge tested per LT2 ESWTR Toolbox Guidance Manual with specific instructions regarding: full scale filter testing, challenge particulate, test solution concentration, challenge test duration, water quality of test solution, maximum design flow rate, challenge particulate seeding method and concentration, sampling procedures and calculation of log removal. Up to 2.0-log removal for individual cartridge filters showing a minimum of 3.0-log removal in challenge testing. Up to 2.5-log removal for cartridge filters in series showing a minimum of 3.0-log removal in challenge testing. Testing is product specific, not site specific, meaning it does not

N3319122R4007 have to be tested in every water system seeking removal credit. Instead, a manufacturer or independent third party would challenge test each of its products in order to obtain a 2.0- or 2.5-log Cryptosporidium removal rating. A minimum of two (2) bad or cartridge filter housings should be provided to endure continuous water treatment in the event of failure in the filter operation and to allow for filter maintenance and replacement.

Filter Specifications as follows:

Pleated microfiber media provides more surface area for longer filter life and increased particle removal.

Manufactured from materials which are listed for food contact application in Title 21 of U.S. code of Federal Regulations.

Filter Media: FDA borosilicate microglass with acrylic binder.

Support Media: spun-bonded polyester laminated on both upstream and downstream sides.

Center Tubes: rigid PVC with perforations.

End Caps: plastisol (pliable PVC)

Shrink Wrap: standard on HC/170-LT2 cartridge.

Dimensions: 7-3/4” O.D.; 4” I.D.; 30-3/4” L.

Flow Rate: 100 GPM (recommended) per HC/170-LT2 cartridge;>3.6 Log removal Temperature: 140°F (60°C) max Dimensions: 7-3/4” O.D.; 4” I.D.; 30-3/4” L. Center Tubes: rigid PVC with perforations Flow Rate: 100 GPM (recommended) per HC/170-LT2 cartridge; > 3.6 Log removal Change Out:

25-30 PSI (1.72-2.07 Bar) ∆P * Temperature limits vary and depend on pressure and time under load.

Surface Area: 120 sq. ft. (HC/170-LT2) pH: 3 to 11

Each skid unit provide 100 gpm and is required to install in parallel to provide approximately 300 gpm. Each unit must be equipped with a single, 120 sf surface area, and pleated microfiber cartridge. Filter housing must be made from 316L stainless steel, rated for pressure up to 150 psi, and equipped with 2” flanged connectors. The top closure would be O-ring sealed and locked with swing bolts. Each housing must be equipped with two NSF 61 listed, 316L stainless steel pressure gauges for head loss monitoring. Install per manufacturer’s recommendation. Provide pressure gauges on the upstream and downstream of each cartridge filter. Provide additional filter cartridge to use for one (1) year maintenance replacement purposes.

F20 SELECTIVE BUILDING DEMOLITION

(End of Amendment 005)