Africa First Project Data Sheet Attach D.pdf
PDF 85 KB Posted
- Solicitation number
- N3319122R4007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 005 Eidts to Filter Specs.pdf | ||
| Amendment 004.pdf | ||
| Amendment 003.pdf | ||
| Amendment 002.pdf | ||
| 22R4007_AMD01FINAL.pdf | ||
| N3319122R4007 Africa First RFP.pdf | ||
| N3319122R4007 Africa First Attach PPQ.docx | DOCX document | |
| N3319122R4007 PPI.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
DESIGN & CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : #1 #2 #3 #4 #5
1. Experience for: Offeror Joint-Venture Other (Explain)
Firm Name:
Address:
Phone Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price Cost/Time and Material Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):
If Design-Build, identify the Lead Design Firm:
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
Design-Build RFP Development Designer of Record Engineering Services Full Plans & Specs
Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project:
11. Other Information:
File details come from the government source that posted it. Updated .