N3319122R4004 Attach 1a - Addendum.pdf
PDF 485 KB Posted
- Solicitation number
- N3319122R4004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3319122R4004 Attach 3 - Price Schedule.doc | DOC document | |
| N3319122R4004 Amendment 0001.pdf | ||
| N3319122R4004 Attach 5 - Contract Data Sheet.docx | DOCX document | |
| N3319122R4004 Attach 3 - Price Schedule.doc | DOC document | |
| N3319122R4004 Attach 2 - PPI.docx | DOCX document | |
| N3319122R4004 Attach 7 - PPQ.docx | DOCX document | |
| N3319122R4004 Attach 4 - Clause 252.229-7001.docx | DOCX document | |
| N3319122R4004 Attach 1 - PTS.pdf | ||
| N3319122R4004 Asbestos Abatement RFP.pdf | ||
| N3319122R4004 Attach 6 - Safety Checklist.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Project Site Excavation: 160.5934m3
13 December 2021Excavation Validation Package Project Title: EC17-05 VMF Unit: CTG 68.2 - NMCB ONE Prepared By: CTU 68.2.1 - Detail Ukraine
Summary:
The following is a breakdown of the total excavation required on the VMF to ensure that the Detail does not come across additional asbestos containing material for the duration of the project.
The overall site excavation volumes seen below show what remains to be excavated in teal. The voids in the left and rear portions show what has already been excavated by the detail. The volumes have been separat-ed into 23 parts and their volume calculations can be seen in the following pages.
For the Utility trenches, the project plans were blown up to a 1:1 scale using digital design programs to allow for a more accurate depiction of the overall lengths of each trench.
Finally, with the spoils likely being removed from the site, the project will require additional select �ll materi-al for back�ll and compaction. The total volume of back�ll was calculated by taking the total excavation and subtracking the trenches’ bedding sand volume
Site Excavation Calculations:
Formula(s): (1/2 BH)L
Calculation(s):
1 - (.5 x 1.8560 x .0901) 2.1192 = .1772
Total = .1772m3
2 3
Formula(s): L x W x H
Calculation(s):
1 - 1.0596 x .6069 x .2367 = .1522 2 - 1.8 x .6096 x .2071 = .2272 3 - 3.0192 x .6096 x .1197 = .2203 4 - Section 1 + Section 2 = .3795
Total = .9792m3
Formula(s): L x W x H - (1/2 BH)L
Calculation(s):
1 - (.5 x 3.9808 x .1933) x .6096 = .2345 2 - 3.9808 x .6096 x .2367 = .5744 3 - Section 1 + Section 2 = .8089
Total = 1.6178m3
Formula(s): L x W x H
Calculation(s):
1 - 1.0596 x .6096 x .5767 = .3725 2 - 1.8 x .5596 x .5471 = .5512 3 - 1.0596 x .6096 x .4597 = .2969 4 - Section 1 + Section 2 + Section 3 = 1.2205
Total = 2.4411m3
Page Total = 5.2153m3
Formula(s): (1/2 BH)L
1 - (.5 x 14.9060 x .7239) 2.1192 = 11.4336
Total = 11.4336m3
Page Total = 24.8365m3
Formula(s): L x W x H - (1/2 BH)L
Calculation(s):
1 - (.5 x 3.0308 x .1472) x .6096 = .1359 2 - 3.0308 x .6096 x .5767 = 1.0655 3 - Section 1 + Section 2 = 1.2015
Total = 2.4029m3
Formula(s): L x W x H
Calculation(s):
1 - 3.6192 x .6096 x .87 = 1.9194 2 - 2.4 x .6096 x .87 = 1.2728 3 - 1.1096 x .6096 x .7535 = .5097 4 - 1.6096 x .6103 x .7293 = .7164 5 - 1.2014 x .6096 x .8360 = .6123 6 - .7 x .6096 x .8360 = .3567
Total = 5.3873m3
Formula(s): L x W x H
Calculation(s):
1 - 3.6308 x .7 x .87 = 2.2112 2 - 3.6308 x .6089 x .7822 = 1.7293 3 - 1.9096 x 1.2007 x .7293 = 1.6722
Total = 5.6127m3
2 3
Formula(s): L x W x H
1 - 3.5808 x .7 x .87 = 2.1807 2 - 3.5808 x .6089 x .8117 = 1.7698
Total = 3.9505m3
Formula(s): L x W x H
Calculation(s):
1 - 3.6192 x 1.3096 x .8360 = 3.9624 2 - 1.8096 x .6096 x .7239 = .7986 3 - 2.4 x .6103 x .7293 = 1.0682 4 - Section 2 = .7986
Total = 6.6278m3
Formula(s): L x W x H
Calculation(s):
1 - 3.6192 x 1.3096 x .87 = 4.1235 2 - 3.6192 x 1.8096 x .8117 = 5.3161
Total = 9.4396m3
Formula(s): L x W x H
Calculation(s):
1 - 3.5808 x .7 x .87 = 2.1807 2 - 3.5808 x .6089 x .8117 = 1.7698 3 - 2.24 x 1.2007 x .7822 = 2.1038
Total = 6.0543m3
Page Total = 26.0722m3
Formula(s): L x W x H - (1/2 BH)L
1 - 1.07 x .6089 x .9863 = .6426 2 - 2.4740 x .8474 x .9863 = 2.0677 3 - (.5 x 15.2268 x .7395) x 3.3892 = 19.0816 4 - 15.2268 x 3.3892 x .2172 = 11.2089
Total = 33.0008m3
Formula(s): L x W x H
Calculation(s):
1 - 3.6192 x 1.3096 x .87 = 4.1235 2 - 3.6192 x 1.8096 x .8117 = 5.3161
Total = 9.4396m3
Formula(s): L x W x H
Calculation(s):
1 - 3.5808 x .7 x .87 = 2.1807 2 - 3.5808 x .6089 x .8117 = 1.7698
Total = 3.9505m3
Formula(s): L x W x H
Calculation(s):
1 - 2.1692 x 1.4399 x .7822 = 2.4431
Total = 2.4431m3
Page Total = 48.8340m3
Formula(s): L x W x H - (1/2 BH)L
1 - (.5 x 15.8375 x .7691) x 3.3888 = 20.6388 2 - 15.8375 x 3.3888 x .2172 = 11.6572
Total = 32.2960m3
Formula(s): L x W x H
Calculation(s):
1 - 3.6192 x 1.2096 x .87 = 3.8087 2 - 3.0096 x .5006 x .8360 = 1.2595 3- 3.6192 x 1.8089 x .8117 = 5.3140
Total = 10.3822m3
Formula(s): L x W x H
Calculation(s):
1 - 2.9330 x 1.7192 x .7239 = 3.6502 2 - 3.0192 x 3.0178 x .5815 = 5.2982
Total = 8.9484m3
Formula(s): L x W x H - (1/2 BH)L
Calculation(s):
1 - (.5 x 3.9822 x .1934) x 1.7192 = .662 2 - 3.9822 x 1.7192 x .2416 = 1.654 3 - (.5 x 3.0178 x .1465) x 3.0192 = .6674 4 - 3.0178 x 3.0192 x .0950 = .8656 5 - (.5 x 1.9567 x .0950) 1.7192 = .1598
Total = 4.0088m3
Page Total = 55.6354m3
4 5
A
B
C
D
E
A
B
C
D
E
F
G
H
I
A B
C
D
E
F
G
H
IJ
Under Ground Communication:
A: 4.3581m B: 19.54m C: 96.8189m D: 12.2158m E: 10.4673m
Total Distance:
143.4001 Linear Meters
Underground Utility Trenches Calculations:
Under Ground Electrical:
A: 5.9907m B: 18.9324m C: 93.0446m D: 34.7577m E: 116.7380m F: 21.3135m G: 12.1125m H: 93.9229m I: 2.9985m
Total Distance:
399.8108 Linear Meters
Water:
A: 3.9429m B: 18.5326m C: 98.6256m D: 32.1096m E: 118.8452m F: 23.1045m G: 13.7836m H: 62.4533m I: 9.4739m J: 15.2560m
Total Distance:
396.1272 Linear Meters
Trench Width and Depth Calculations:
Note: Trench Excavation calculations are based on the maximum trench size for a 4” underground pipe. Trench dimensions will vary slightly based on size of pipe but will have a di�erence of less than 100mm in depth and width.
- 4” pipe = 101.6mm
Depth:
- 101.6mm (pipe diameter) + 150mm bedding thickness + 800mm minimum coverage for frost protection = 1051.6mm or 1.0516m
Width:
- 101.6mm (pipe diameter) + Max 300mm each side = 701.6mm or .7016m
Overall Utility Trench Calculations:
Under Ground Communications: 143.4001 x 1.0516 x .7016 = 105.8m3
Under Ground Electrical: 399.8108 x 1.0516 x .7016 = 294.9814m3
Water: 396.1272 x 1.0516 x .7016 = 292.2636m3
Total Utility Trench Excavation Volume = 693.045m3
Total Excavation Volume of Project EC17-005:
Total Project Site Excavation + Total Utility Trench Excavation Volume = Total Excavation Volume
160.5934m3 + 693.045m3 = 853.6384m3
Select Fill Requirement:
Total Excavation Volume - Bedding Sand Volume = Total Select Fill
Bedding Sand Volume = 939.3381(linear meters of trenches) x .15 (depth of bedding sand) x .7016 (Width) = 98.8559m3
853.6384m3 - 98.8559m3 = 754.7825m3 Select Fill