This document is an amendment to a solicitation for the construction of a Tactical Operations Center and classroom facility in Kismayo, Somalia. The amendment answers four pre-proposal inquiries, allowing the use of 26 gauge galvanized corrugated sheet metal for roofing instead of 16 gauge, acceptance of a pre-engineered building with metal framing as an alternative to 2x4 wood framing, use of concrete masonry units instead of lumber for construction materials, and confirmation that a temporary staff camp can be established onsite upon authorization. The amendment also extends the proposal due date to August 13, 2020 at 1400 Central European Summer Time. The solicitation is being conducted by the Naval Facilities Engineering Command on behalf of the Department of the Navy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TOC_Training Kismayo Attach 1- PTS.pdf | ||
| N3319120R4036 Kismayo Attach 2 - PPI.docx | DOCX document | |
| N3319120R4036 Kismayo RFP.pdf | ||
| N3319120R4036 Kismayo Attach 4 - Data Sheet.docx | DOCX document | |
| N3319120R4036 Kismayo Attach 6 - PPQ.docx | DOCX document | |
| N3319120R4036 Kismayo Attach 3 - Price Schedule.doc | DOC document | |
| N3319120R4036 Kismayo Attach 5 - Safety Checklist.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N3319120R4036 D-B Construct Tactical Operations Center (TOC) and Classroom Facility, Kismayo, Somalia
See Page 2 for description of amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3319120R4036
X 9B. DATED (SEE ITEM 11)
07-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2020
CODE
NAVFAC EUROPE AFRICA CENTRAL
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3319120R4036
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
The purpose of this amendment is to answer the Pre-Proposal Inquiries.
Inquiry No. 001
Drawing No. 10414040 Side Elevations calls out for a 16 gauge glavanized corrugated sheet metal.
Please donfirm that the sheet metal is to be 16 guage as we feel that is incorrectly labeled. 16 gauge sheet metal is close to 3 lbs a square foot and normally a special order size. Further more this material is not available on the local market in Somalia. 20‐26 gauge is more commercially standard gauge for roofing sheet metal.
Response to Inquiry No. 001
Roofing material shall not be thinner than 26 gauge galvanized corrugated sheet metal.
Inquiry No. 002
The conceptual design shows 2x4 wood framing, we would like to propose a Value Engineering option of providing the TOC and Classrooms as a pre‐engineered building with metal framing in lieu of 2x4 timber framing. We feel that this would offer a far superior/quality product and provide cost savings to the project.
Will NAVFAC accept a VE option for the proposl?
Response to Inquiry No. 002
Pre-engineered building with metal framing are acceptable as an alternate. The facilities must meet the minimum size and space requirements per the Request for Proposal.
N3319120R4036
Inquiry No. 003
Per the Statement of Work, the standards and specifications for the materials is for lumber and this PPI seeks some guidance on the possibility of changing the structure’s construction materials from lumber to CMU. Is is acceptable to use CMU versus lumber.
Response to Inquiry No. 003
Concrete Masonary Unit is acceptable. Facilities must meet the minimum space and room requirements.
Inquiry No. 004
Is it acceptable to establish a temporary staff camp onsite to perform the work?
Response to Inquiry No. 004
Yes, upon gaining authorizaton, the contractor can set up temporary berthing and a staff camp within the airport security zone.
This amendment extends the Proposal Due Date to 13 August 2020 no later than 1400 Central European Summer Time.
(End of Summary of Changes)