This document contains an attachment to a federal solicitation for construction services. The attachment outlines safety requirements for a project to construct a Tactical Operations Center and classroom facility in Kismayo, Somalia for the Department of the Navy Naval Facilities Engineering Command. Within 30 days of award, the contractor must designate a competent employee to oversee safety and provide a full-time on-site Safety and Health Officer meeting experience and training requirements. The contractor and any subcontractors must comply with the U.S. Army Corps of Engineers Safety and Health Requirements Manual and develop a safety plan and subcontractor monitoring plan. Personal protective equipment including steel-toed shoes, helmets, vests, gloves, and eye/ear protection must be provided. The contractor's price must include all safety costs, and they must acknowledge the requirements in writing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3319120R4036 Kismayo Amend 01.pdf | ||
| N3319120R4036 Kismayo Attach 2 - PPI.docx | DOCX document | |
| N3319120R4036 Kismayo Attach 4 - Data Sheet.docx | DOCX document | |
| TOC_Training Kismayo Attach 1- PTS.pdf | ||
| N3319120R4036 Kismayo Attach 3 - Price Schedule.doc | DOC document | |
| N3319120R4036 Kismayo Attach 6 - PPQ.docx | DOCX document | |
| N3319120R4036 Kismayo RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 Safety Checklist Form
The contractor shall comply with local safety regulations, unless the U.S. Safety Regulations included in the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) are more strict and not in conflict with the local regulations. In this case, U.S Safety Regulations shall apply. The EM 385-1-1 can be downloaded from the following website: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf
Safety Checklist Requirements
Within 30 days of award of the contract, the contractor will provide a safety plan to monitor personnel performance during construction, and identify one competent employee in accordance with EM 385-1-1 to ensure execution of the safety plan.
The contractor will provide a full-time, on-site Site Safety and Health Officer (SSHO) that meets the requirements of the EM 385 Section 01.A.17, specifically:
- Five (5) years of continuous general industry or construction safety experience in supervising/managing general industry or construction (managing safety programs or processes or conducting hazard analyses and developing controls). Documentation for validation is required within 30 days of contract award.
- Completion of 30-hour OSHA Construction Industry safety class (may be web-based training if the student is able to directly ask questions of the instructor by internet or phone). Documentation for validation and proof of completed training is required within 30 days of contract award.
The contractor will provide a plan to monitor all subcontractor performance during construction if subcontractors will be used. The contractor and subcontractors must also comply with EM 385-1-1.
The contractor shall provide all necessary and required Personal Protective Equipment (PPE), which shall be used as required by the specific risk.
Steel toed shoes
Helmets
Vests and gloves
Eye and ear protection
Shoring for excavation, as needed
The use of helmets or "hard hats" is absolutely required for all personnel entering the job site. In addition the contractor shall have a minimum of 5 new hard hats to be used by any authorized visitor to the job site.
The contractor's price shall include the cost for any and all safety requirements for this project.
As a certified agent of this Company, I acknowledge and agree to the safety factor requirements.