This solicitation is for a design-build contract to renovate two kindergartens in Targovishte, Bulgaria. The scope of work includes a thermally insulated facade system, window and door replacements, bathroom renovations, and repairing facade cracks. For one kindergarten, the scope also includes renovating children's bathrooms. For the other, it includes a new exterior canopy. The contract is awarded using U.S. contracting regulations and requires following both U.S. and Bulgarian safety standards. The Navy is the contracting agency. Submission and performance deadlines are not specified.
N3319120R4004 Attach 1 - PTS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 3 - Price Schedule Updated.doc | DOC document | |
| N3319120R4004 Solicitation Amend 6.pdf | ||
| Attach 1 - PTS for 2 Kindergartens Updated.pdf | ||
| N3319120R4004 Solicitation Amend 5.pdf | ||
| N3319120R4004 Solicitation Amend 4.pdf | ||
| N3319120R4004 Solicitation Amend 3.pdf | ||
| N3319120R4004 Solicitation Amend 2.pdf | ||
| N3319120R4004 Solicitation Amend 1.pdf | ||
| Attach_6_-_PPQ.docx | DOCX document | |
| Attach_5_-_Safety_Checklist.docx | DOCX document | |
| Attach_2_-_PPI.docx | DOCX document | |
| N3319120R4004_Solicitation.pdf | ||
| Attach_4_-_Contract_Data_Sheet.docx | DOCX document | |
| Attach_3_-_Price_Schedule.doc | DOC document | |
| N3319120R4004_D-B_Reno_2_Kindergartens.doc | DOC document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EUCOM Humanitarian Assistance Program
Renovation of 2 Kindergartens in
Targovishte Prolet & Chervenata Shapchitsa
DESIGN & BUILD RENOVATIONS
BULGARIA
BU-HA-2019-00036688
BU-HA-2018-00036692
Oct 2019 Ver-002
Renovation to 2 kindergartens in the city of Targovishte Prolet Kindergarten - Chervenata Shapchitsa Kindergarten BULGARIA
OHASIS ID 36688 - 36692 Page 2 of 106 Version: 002
Contents
1. TAXATION
2. GENERAL DESCRIPTION OF THE PROJECTS
2.1 LOCATION OF PROJECTS
2.2 LEGAL AND TECHNICAL REQUIREMENTS
2.3 GENERAL CONTRACT DESCRIPTION
2.4 GENERAL PROJECT DESCRIPTION AND SCOPE OF WORK
2.5 CONSTRUCTION PERMIT OR AUTHORIZATION – CONSTRUCTION PERMIT
2.6 MEASUREMENTS AND QUANTITIES
2.7 Design Phase - General
2.8 Construction Phase - General
2.9 APPLICABLE REQUIREMENTS / STANDARDS
3 CLIN001 - GENERAL SCOPE OF WORK OF BASE-BID IN PROLET KINDERGARTEN
3.1 Exterior window and door replacement – General Requirements
3.2 Exterior window and door replacement – Window Wall
3.3 Exterior window and door replacement – Storage in Patio
3.4 Thermally Insulated Façade System - General
3.5 Thermally Insulated Façade System – Specific Requirements
3.6 Scaffolding
3.7 Pictures to show existing condition and to describe elements of the scope of work 34
3.8 COMMEMORATIVE PLAQUE
4 CLIN002 - GENERAL SCOPE OF WORK OF BASE-BID IN CHERVENATA SHAPCHITSA
KINDERGARTEN
4.1 CRACK REPAIRS – THERMALLY INSULATED FACADE
4.2 ENTRANCE MOSAIC PLATFORM
4.3 EXTERIOR WINDOWS
4.4 EXTERIOR DOORS
4.5 PICTURES TO SHOW EXISTING CONDITION OF THE FAÇADE AND TO DESCRIBE
ELEMENTS OF THE SCOPE OF WORK
4.6 BATHROOM RENOVATIONS
4.7 REPLACEMENT OF SEWER LINES – BASEMENT, KITCHEN AND OUTSIDE THE
BUILDING
4.8 COMMEMORATIVE PLAQUE
4.9 PICTURES TO SHOW EXISTING CONDITION OF THE BATHROOMS AND TO
DESCRIBE ELEMENTS OF THE SCOPE OF WORK
5 CLIN003 - GENERAL SCOPE OF WORK OF CONTRACT OPTION-1 IN PROLET
KINDERGARTEN
6 CLIN004 - GENERAL SCOPE OF WORK OF CONTRACT OPTION-2 IN CHEVERNATA
SHAPCHITSA KINDERGARTEN
OHASIS ID 36688 - 36692 Page 3 of 106 Version: 002
7 PROCEDURE AND GENERAL CONTRACT REQUIREMENTS AND GUIDELINES
7.1 PRINCIPLES
7.2 PROHIBITED ITEMS
7.3 START OF CONSTRUCTION
7.4 RESPONSIBILITY FOR NEW MATERIALS
7.5 DESIGN
7.6 DESIGN-BUILD PROCEDURE
7.7 CONSTRUCTION/DESIGN SCHEDULE AND CONTRACTUAL MILESTONES
7.8 CONSTRUCTION SCHEDULE (BAR CHART IS AUTHORIZED)
7.9 SAFETY: ACCIDENT PREVENTION PLAN
7.10 COORDINATION AND PHASING
7.11 LANGUAGE
7.12 SPECIAL SITE CONDITIONS
7.13 SUBMITTALS – TECHNICAL INFORMATION
7.14 DELIVERABLE
7.15 PICTURES
7.16 RESPONSIBILITY AND OWNERSHIP OF REMOVED MATERIALS
7.17 CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC
7.18 QUALITY CONTROL PLAN
7.19 CONSTRUCTION SIGN
7.20 PAYMENT
7.21 SCHEDULE OF PRICES
7.22 DAMAGES/IMPACT TO EXISTING FACILITIES
7.23 CLEANING
7.24 SPACE PARTS
7.25 WARRANTY AND TRAINING
7.26 CLOSE-OUT PROCEDURE
-/-/-/-/-/-/-/- END OF TECHNICAL SPECIFICATION -/-/-/-/-/-/-/-/- ... 104
OHASIS ID 36688 - 36692 Page 4 of 106 Version: 002
1. TAXATION
In accordance with Agreement between the Government of USA and the Government of BU on Defense Cooperation this contract is authorized for VAT exemption by the Bulgarian Government.
The contractor shall be responsible to prepare and process all required documentation to obtain the VAT exception from the Government of Bulgaria. For this reason, the contractor shall work directly with the corresponding authorities from Bulgaria, US Forces and the US Embassy".
2. GENERAL DESCRIPTION OF THE PROJECTS
2.1 Location of projects
This contract includes the described renovation works for two separate kindergartens, both located in the city of Targovishte. Exact location and address are found in the following pictures
Location of the city of Targovishte within Bulgaria
OHASIS ID 36688 - 36692 Page 5 of 106 Version: 002
Chervenata Shapchitsa Kindergarten Prolet Kindergarten Street "Lyuben Karavelov" 29, 7702 Varosha, ul. "3-ti Mart" 40, 7703 Varosha, Targovishte, Bulgaria Targovishte, Bulgaria
OHASIS ID 36688 - 36692 Page 6 of 106 Version: 002
Prolet Kindergarten ul. "3-ti Mart" 40, 7703 Varosha, Targovishte, Bulgaria
Chervenata Shapchitsa Kindergarten; Street "Lyuben Karavelov" 29, 7702 Varosha; Targovishte, Bulgaria
OHASIS ID 36688 - 36692 Page 7 of 106 Version: 002
2.2 Legal and Technical Requirements
The project execution is based on the following principles:
- Strict compliance with American Contracting Regulations, including the contracting requirements of the Department of Defense, the US Navy and the US Naval Facilities Engineering Command (NAVFAC).
- Strict compliance with Bulgarian Technical, Legal and Administrative requirements, which are applicable for the scope of work described in this PTS.
- Compliance with Bulgarian safety regulations, unless the US Safety Regulations described in the EM385-1-1 are more stringent and not in conflict with the Bulgarian regulations, in which case, the U. S. safety regulations shall apply.
- Compliance with technical and administrative requirements described in this document.
This is one single contract to include 2 different and separated projects. The technical requirements are similar for all 2 projects unless explicitly stated otherwise. If for example, a type of natural stone is specified for Prolet kindergarten, and this document states that natural stone is also required for Chervenata Shapchitsa kindergarten, but this type of natural stone is not detailed or specified or described for the Chervenata Shapchitsa kindergarten, then the details specified for Prolet kindergarten are also contractually required for the Chervenata Shapchitsa kindergarten.
OHASIS ID 36688 - 36692 Page 8 of 106 Version: 002
2.3 General Contract Description
This document is a Performance Technical Specifications (PTS) for a full Design-Build project. This PTS includes a description of the required finished work.
This is a design-build contract. This means that the contractor is responsible to:
- Make necessary designs or shop drawings as required by this PTS for the different items of work
- Obtain NAVFAC’s acceptance of the designs and the approval of the corresponding beneficiary and Municipality or Targovishte.
- Obtain required formal approvals from competent and required Bulgarian authorities, including the necessary expert review by third party company as required by Bulgarian regulations, which shall be paid by the contractor.
- Execute the construction works
- Obtain the acceptance of NAVFAC and the partial and final approval by the competent and required Bulgarian authorities and third party experts for the executed construction works.
Note: The contract includes third party review of all items of work which are required by Bulgarian regulations. In case the Bulgarian regulations do not allow for the contractor to be the client for this independent review, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Contracting Officer Representative or other agency authorized by the Contracting Officer (i.e. the Municipality of Targovishte).
Note: The contractor needs to be familiar with the regulations of Bulgaria, in order to account for the different required permits, reviews and authorizations for renovation works and especially for thermally insulated facades and work in kindergarten facilities.
OHASIS ID 36688 - 36692 Page 9 of 106 Version: 002
2.4 General Project Description and Scope of Work
This document includes anticipated activities necessary to provide perfectly finished, certified and operational facilities, as described in this document.
In very general terms, the works include the following items of work:
- Base-Bid (CLIN0001 and CLIN0002):
o CLIN0001: Prolet Kindergarten: Provide thermally insulated façade, replacement or exterior windows and doors.
o CLIN0002: Chervenata Shapchitsa Kindergarten: Repair façade cracks. Provide thermally insulated façade, replacement of exterior wooden and metal windows and doors. Renovation of internal bathrooms for children and teachers.
- CLIN0003: Contract Option-1: Prolet Kindergarten: Renovation of bathrooms for children
- CLIN0004: Contract Option-2: Chervenata Shapchitsa: provide new exterior canopy
OHASIS ID 36688 - 36692 Page 10 of 106 Version: 002
2.5 Construction Permit or Authorization – Construction Permit
The contractor shall obtain formal written authorization from the competent Bulgarian authority to perform the works included in the scope of work of this project.
Some items of work, require a formal Construction Permit from the competent Bulgarian authority, and some others, do not require any formal permit. For those items of work that do not require a formal construction permit, the contractor shall obtain the written authority from the beneficiary to perform the works. This authority shall be signed at least one step above the corresponding Director of the Kindergarten.
For those items of work requiring a formal construction permit, it is absolutely necessary that the contractor is familiar with the Bulgarian bureaucratic procedures to obtain such permits in Bulgaria.
The contractor shall hire the services of an architectural firm or architect, specialized, experienced and licensed in Bulgaria to perform all the designs, shop drawings and to facilitate the procedures to obtain the construction permits that are required by the scope of work of this document.
The contractor is required, as part of this contract, to prepare all documentation, designs, reports, information, drawings, coordination and approvals by experts or monitoring entities, and everything that may be necessary as required by Bulgarian regulations, in order to obtain the necessary Construction Permit. The contractor is responsible to pay for any third party inspection or expertise that may be required by Bulgarian regulations for the scope of work of this project. The contractor shall be familiar with these requirements in order to prepare their bids, regarding the obligatory administrative and technical procedures in Bulgaria for new construction.
As previously stated, the contract includes third party review of all items of work which are required as per Bulgarian regulations. In case the Bulgarian regulations do not allow for the contractor to be the client for this independent expert company, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Contracting Officer Representative or other agency authorized by the Contracting Officer Representative, such as the Municipality of Targovishte.
No work shall be performed until the contractor shows verifiable evidence that they have obtained all the necessary permits or authorizations for each element of work included in this contract.
2.6 Measurements and Quantities
This contract complies with the US Contracting Regulations, and as such, measurements and quantities of materials and work are not provided, and if any are provided, the contractor shall be responsible to verify on site. The contractor needs to visit the job site in order to perform the necessary measurements and to observe the existing field conditions in order to prepare their cost proposal.
OHASIS ID 36688 - 36692 Page 11 of 106
2.7 Design Phase - General
The contractor shall familiarize with the requirements of the Bulgarian regulations for kindergartens.
The designs shall be prepared in compliance with applicable construction codes, applicable urban planning and construction practices in Bulgaria. The contractor shall hire the services of an architect (or architectural firm) licensed in Bulgaria to design all works, as detailed in this document. At the same time, after obligatory coordination with the corresponding Municipality, the contractor shall hire (and pay for) the services of a “Revision Entity - Expertise” authorized by the Government of Bulgaria to supervise and approve each phase of the design and the construction, including final commissioning and acceptance of the facility. This company shall report directly to the US Government representative and the beneficiary if required by the Bulgarian regulations, but all their services shall be paid by the contractor.
The design shall comply with all applicable regulations in Bulgaria for the scope of work of this contract.
The contractor’s final designs shall be signed, stamped and certified by a licensed architect in Bulgaria, it shall be approved by an authorized “Revision Entity - Expertise” and it shall be approved by the competent Bulgarian authorities for construction projects in public property before its construction is authorized to start. The level of detail of the design (extent of specifications, number and size of drawings, calculations, …) shall be sufficient to verify the compliance with the requirements of this contract and as required by the regulations of Bulgaria and of the competent Bulgarian authorities for this particular project.
2.8 Construction Phase - General
Once the contractor completes the design and they show evidence of formal authorization by the competent local authorities and Monitoring Entity, and the contractor shows that they have completed other administrative contract requirements (Accident Prevention Plan, Quality Control Plan, Schedule,…), the Contracting Officer will inform the contractor that they may start the construction phase of this design-build contract. This notification is called Notice to Proceed or NTP. NTP is required prior to beginning construction.The construction shall follow the design and technical projects or shop drawing prepared by the architect and for which the contractor shall obtain the Construction Permit or authorization.
The architect who prepares the design shall visit the site for every important and relevant phase of work, to partially accept the completed works. In addition to the requirements of the Bulgarian regulations for the visits of the designer, once the works start, the architect shall visit the site at a minimum once every week.
Two days in advance of the site visit, the contractor shall inform the representative of the Office of Defense Cooperation (ODC) in Bulgaria and the beneficiaries of the planned arrival time to the job site. In addition to these minimum weekly visits, the architect shall visit the site when NAVFAC’s PM visits the job sites, estimated to occur once every two months. In addition to these visits, the third party experts that may be required will visit the site as required by Bulgarian regulations, and also when NAVFAC’s PM visits the site.
Work will not be accepted until Final Act of Acceptance is provided.
Contractor shall perform all construction while maintaining operational capability of the educational facility.
OHASIS ID 36688 - 36692 Page 12 of 106
2.9 Applicable Requirements / Standards
The project is based on the principle of strict compliance with Bulgarian technical and administrative regulations, with US Contracting Regulations and with Bulgarian Safety regulations unless EM 385- 1-1 has more strict requirements. In case of conflict between Bulgarian and US safety regulations, the contractor shall apply Bulgarian regulations.
The work shall meet all requirements of this Request for Proposal (RFP) package. Drawings to be as required in these PTS and with the necessary details and previous approvals (experts or monitoring entities) to submit the designs to the US Government, Local Bulgarian Administration, final users, contractor’s staff and sub-contractors. Material selection, specifications and installation to be as described in these Performance Technical Specifications (PTS). The Performance Technical Specifications (PTS) are a guideline for the design package:
- If an item in the project design is included in the PTS, the requirements of the PTS, applicable local Bulgarian codes and regulations, and international codes shall govern.
- If an item in the project design is NOT included in the PTS, the requirements of applicable local Bulgarian codes and regulations, and international codes shall govern.
Provide the final work as a complete and usable facility including all required items not described in this RFP. Technical details, items of work, permits or fees that are not explicitly described in this RFP, but which are necessary to provide a fully operational and finished facility shall be considered part of this contract.
Any work not explicitly included in the scope of work of this project, but which is absolutely necessary to have a perfectly operational facility, as required by Bulgarian regulations, shall be considered and treated as part of the requirements of this contract.
Limitation on equipment under this contract
Tables, desks, chairs, computer, phones, washing machines, refrigerator, beds, televisions, and other movable equipment are not part of this contract, unless otherwise indicated in these technical specifications. Only those elements that are fixed, permanently attached to the building or considered as an integral part of the facility, and specifically described in these contract specifications or in the applicable Bulgarian regulations, are included in this contract, unless otherwise indicated in this document.
Requirement for Bulgaria Code and Regulation
The contractor shall request, process and pay for any permits that may be required in accordance with Bulgaria Law for the construction activities described in this document. The contractor shall hire and pay for the services of a “Revision Entity” (or expertise) authorized by the Government of Bulgaria as required by Bulgaria Regulations for this type of construction. If it is not allowed for the contractor to hire this third party inspection company, the contractor shall pay but assign the beneficiary or NAVFAC as the client. The contractor shall provide a copy of the pertinent construction permit to be issued by the competent local authorities and approval by the Monitoring Entity of the design, before they are authorized to start work.
OHASIS ID 36688 - 36692 Page 13 of 106
3 CLIN001 - GENERAL SCOPE OF WORK OF BASE-BID IN PROLET
KINDERGARTEN
The Base-Bid of the contract for the Prolet kindergarten consists of the repair of exterior walls, replacement of all wooden windows, providing a new thermally insulated façade system and other exterior works as described herein.
General evacuation plan of the ground floor. Schematic, not to scale.
OHASIS ID 36688 - 36692 Page 14 of 106
Drawing of ground floor.
Drawing of second floor
OHASIS ID 36688 - 36692 Page 15 of 106
Drawing of ground floor of Prolet kindergarten (to scale)
OHASIS ID 36688 - 36692 Page 16 of 106
3.1 Exterior window and door replacement – General Requirements
The contract includes the replacement of all exterior wooden windows and doors.
The windows shall comply with Bulgarian regulations for public educational facilities. As a minimum the windows shall be manufactured with PVC profile and double thermally insulated glazing.
Minimum requirement is PVC profiles with 5 chambers and double glazing. Each glazing shall have a minimum thickness of 6 mm.
The contractor shall completely remove all wooden windows, including the wooden anchors and the wooden sills and trims. All wood from existing wooden windows shall be removed as part of this contract. The contractor shall make the required adjustments and repairs to the window opening on the walls before installing the new windows. The contractor is responsible to visit the site, to take note of the existing conditions of the window openings and to make all required measurements to quantify the amount of work required by this contract. The contractor shall completely remove the exterior wood windows, including all framing, trims, anchors and supports. The contractor is responsible to repair all surfaces damaged by the replacement of the wooden windows. This will be significantly relevant when removing the existing window internal sills.
The new windows shall operate similar as the existing ones. In other words: if a window has 2 operational panels, the new windows shall have two operational panels of approximately similar dimensions, but the opening panels/leaves of the windows shall open vertically and horizontally. For estimating purposes, the contractor shall estimate that 50% of the window surfaces shall be operational (horizontally and vertically). For windows openings with less than 1m² of total surface.
100% of the window shall be operational horizontally and vertically.
The new PVC windows shall be perfectly finished inside and outside. The joints between the building and the windows shall be perfectly sealed as seen in pictures included in this paragraph for a typical installation (typical “yellow” foam cannot be visible). Contractor to provide PVC sill inside as seen in the pictures below and new outside sills made of aluminum or other approved material (i.e. natural marble or exterior rated special ceramic tiles or galvanize metal sheet).
All removed windows shall become property of the contractor and shall be disposed of in accordance with Bulgarian regulations. The contractor shall provide official documentation to certify that all removed materials were disposed in accordance with Bulgarian regulations. Prior to their removed from the job site, the contractor shall allow the beneficiary (Municipality of Targovishte) to take any materials that they may need. The contractor is responsible to take the windows and doors from the building to a properly fenced location within the kindergarten yard, and after a minimum period of one month, whatever materials were not taken by the Municipality, the contractor is responsible to properly dispose of them.
New windows and doors are to be made of highly valuable PVC five chamber profiles that must be of certain thickness (min. 3,5 mm) and with reinforced galvanized steel profiles. Profile should be fully in compliance with RALA quality standard. Coefficient of thermal conductivity of profile package with metal reinforcement (according to DIN EN 12412-2) less than 1.4 W/m2K). Filling should be double layered glass IZO /20 mm/ (double flat transparent glass with a vacuum between, d=6+12+6 mm).
Inner glass is low emission – LOW E – 1,1W/m2K while the outer is classic - FLOAT.
OHASIS ID 36688 - 36692 Page 17 of 106
Sealing is to be done with epoxy rubber (in line with EN410 and EN 673 , Ug=do 2.0 W/m2 K).
Joinery to be supplied with high quality replaceable seals, high quality shackles based on nickel and aluminum alloys, handles, doorknobs and keys.
All PVC joinery is to be done in line with schemes, in white color. The plan is to have natural flow of air when windows are closed, through especially constructed elements in the frame of the window, type Regel Air, or in some other way, in line with DIN and EU norms. Number and size of elements depends on the size of the window - minimum of two units. No elements should be put in fixed windows and over-lights. Windows should be tightened with wall screws depth 50 mm. Sealing between wall and window frame should be done with polyurethane foam. Quality certified shackle should enable opening in line with the provided scheme. On the outer side, set an outer bench made of prefabricated aluminium profiles. They are set in the whole width of the window and light box in the prescribed bleed around current facade walls, including the intervention on the facade -construction of thermally insulated facade - the bleed should be six cm more than prescribed bleed.
When installing exterior window sill, the sides must lean on the wall, and the part of the facade that is damaged must be fixed. The sill should be tightened with at least two screws in the field. They can be direct or indirect. On the interior side, place parapet benches PVC profile in white color, all in line with producer specifications and joinery schemes. Investor or supervision body (with agreement from investor or contracting authority) can chose to change the color of facade joinery.
Certificates to be submitted by the bidder for all joinery:
• Systematic testing of windows, 14351-1 and B 5300
• Certificate for air permeability EN 12207 - Class 4
• Certificate for water resistance EN 12208 - Class E 900 A
• Wind resistance EN 12210 - Class C5
• Mechanical requests EN 12400 - Class 2
• Certificate for sound protection up to protection class 5
• Certificate on the coefficient of warmth conductivity DIN EN 12412-2
• Glass certificate EN 673
• Shackles certificate V ENV 1627-1630, resistance class 3
Prior to production of joinery (windows) that is done in a larger series, it is necessary to make and install a complete typical window that will, upon removal of all possible objections, be recorded and certified and accepted by the Contracting Officer Representative.
Mosquito nets/screens: The contractor shall provide mosquito nets, removable, in 50% of the operational panels. These mosquito nets shall be interchangeable, meaning that one could be used in other windows, as long as the windows have the same size. 100% of the operational panels shall be prepared to receive the mosquito nets, but one 50% of the mosquito nets shall be provided under this contract.
Note: As an exception to the above, and in order to maximize sustainability and uniformity of the new doors and windows, it is acceptable to use similar materials as the recently installed PVC windows in the Chervenata Shapchitsa kindergarten.
OHASIS ID 36688 - 36692 Page 18 of 106
Window leaf opening horizontally and vertically
Typical window profile with double glazing
Typical internal sill required for all windows to be replaced. This includes the removal of the existing sills.
OHASIS ID 36688 - 36692 Page 19 of 106
Typical exterior PVC window installation
Typical PVC window installation. Seal all areas around the new windows. Foam not exposed.
Typical PVC window installation with new PVC sill inside and aluminum outside.
Typical PVC window installation. PVC sill inside and aluminum outside.
Installation
The contractor shall completely remove the existing wood and/or metal materials from the window openings on the walls. Some of the existing windows may be double windows, therefore in this case the contractor shall repair and prepare the openings in the walls to install one single window with double glazing.
The new required exterior window sills shall be properly sloped away from the building in order to drain the rain water away from the building. Minimum 5% slope. The lower window frames/profiles shall be properly provided with water drains.
OHASIS ID 36688 - 36692 Page 20 of 106
Typical windows in Chervenata Shapchitsa Kindergarten. It is acceptable to use similar materials for all windows and doors, complying with the other functional requirements described in this document.
OHASIS ID 36688 - 36692 Page 21 of 106
Location of window walls to be replaced with standard walls with windows as described herein.
3.2 Exterior window and door replacement – Window Wall
In three walls of the internal patios, there are window walls, separating an internal hallway from the internal patio. In these areas, the windows extend from the floor to the ceiling. Each of these 3 sections have a length of approximately 10 to 12 meters.
The contractor shall provide masonry walls in the lowest section and the upper half to be provided with continuous windows or a combination of masonry wall and standard windows, as described in the pictures in the following page. The works include everything necessary to provide perfectly finishes in the interior areas, including operational radiators.
OHASIS ID 36688 - 36692 Page 22 of 106
Two typical acceptable alternatives to minimize the total surface of the new windows. Location of the doors no to be modified.
OHASIS ID 36688 - 36692 Page 23 of 106
Location of storage to be demolished.
3.3 Exterior window and door replacement – Storage in Patio
In a past renovation of the kindergarten, the beneficiary built a storage area within one of the patios.
This contract includes the complete demolition of this patio and providing the exterior of the patio with the layout as in the original design.
The contractor shall demolish the above highlighted storage area and provide a new masonry wall to seal the area occupied by this storage from the rest of the interior areas of the kindergarten. This masonry wall shall be provided with the windows which were specified in the original design. The flooring to be provided with new finishes in coordination with other finishes in the interior patio.
Once the works is completed there shall be no evidence of the previous existence of such storage area.
OHASIS ID 36688 - 36692 Page 24 of 106
Typical required finish for the interior patio with the storage area and without the storage area, using similar tiles for the floors and providing 2 windows where it was the connection between the building and the storage area.
Interior of patio to be demolished
OHASIS ID 36688 - 36692 Page 25 of 106
3.4 Thermally Insulated Façade System - General
The contractor shall hire the services of specialized and licensed technicians in Bulgaria to design the new thermally insulated façade system for all exterior walls of the kindergarten complex. This contract does not only include providing thermally insulated panels on the façade, but it includes a complete and properly designed thermal façade system, including the design and the final certificate, and including every item of work which shall be necessary to provide a fully operational and certified façade system.
This contract includes all exterior masonry sections of the building, as described in the pictures included in this document.
This is a design-build contract and therefore the contractor shall be responsible for the design and for the execution of the works.
Façade Design: The contractor shall provide a façade design (Façade Passport), signed and certified by a licensed architect in Bulgaria, to be accepted by the Contracting Officer Representative (COR) and approved by the competent Bulgaria authorities after coordination of the design with the beneficiary. This design shall include as a minimum:
Typical section of thermal façade system
Special cover of the lowest section of thermal façade (natural stone for estimating purposes)
Color and finishes or “façade passport” with the new proposed finishes. Provide pattern and color as approved by competent local authorities and after coordination with beneficiary. The contractor’s architect shall provide several designs for the exterior appearance of the façade for the approval of the competent Bulgarian authorities. The design shall consist of a minimum combination of 3 colors, in addition to the different finishes required for the lowest section of the façade, which shall be provided with special exterior façade ceramic or natural stone tiles
Details of finishes of the thermal façade system in the top and bottom. In the top it is required to provide adequate finish with the roof. For estimating purposes the contractor shall estimate that they will need to provide a new layer of bituminous sheet to cover the upper section of the thermally insulated façade. In the bottom, it is required to provide adequate seal with the existing or with the new pavement.
Details for special finishes and reinforcements in the corners and around the windows and doors.
The new thermal façade system shall include, but shall not be limited to:
- Water blasting the façade. Repair all façade defects, after removal of loose pieces of plaster, ceramic tiles, paint, bricks. Repair of any cracks on the facade. Providing leveling mortar as needed for the new thermal façade system. Correct any exposed reinforcing steel by epoxy based product, specifically designed for that purpose. Note that the façade has important defects in several very localized areas (as noted in the pictures) and consequently the contractor shall estimate that by the use of water blasting, a significant portion of the plaster will be removed. The contractor shall estimate that 10% of the plaster and 100% of the paint will be removed by water blasting. On in other words, the contractor shall adjust the pressure of the water blasting equipment to remove 100% paint and 10% plaster.
OHASIS ID 36688 - 36692 Page 26 of 106
Lowest natural stone over the thermal insulation, from a NAVFAC project in
Western Ukraine.
- Provide thermal insulation panels, minimum of 8 cm thickness of wool rock (or any other thermal insulation product permitted by Bulgarian regulations with similar thermal insulation properties as 8 cm thick wool rock sheet), properly attached to the existing repaired and leveled façade, in accordance with manufacturer’s recommendations. Follow Bulgarian Fire Code. The use of Styrofoam may not be allowed in some (or in all) locations. The contractor shall consult the latest Bulgarian regulations prior to submission of their bids. Only materials and installations in accordance with Bulgarian regulations in effect at the time of submission of the offers shall be authorized.
- Doors: With the exception of two doors (which were recently installed and which shall be removed and reinstalled), all exterior doors shall be replaced with new, as previously described.
- Window adjustment and sills. All exterior windows shall be new and installed in coordination with the new façade.
- Sidewalks: There shall be adequate seal between the new thermal façade and the exterior pavement or flooring. For estimating purposes the contractor shall estimate that they will need to provide new reinforced concrete sidewalks around half of the length of the exterior walls.
- Roof: There shall be adequate seal between the new thermally insulated façade and the existing roof waterproofing. Provide new bituminous waterproofing between the roof and the upper part of the thermally insulated façade system.
- Protective plaster. There are several systems available in the market to cover the thermal insulation. The contractor shall apply over the rigid thermal insulation a protective plaster, designed to resist impact. Minimum of 1 cm thickness. This may require double netting prior to the application of the final coat of plaster. Apply in accordance with manufacturer’s recommendations. Testing shall be done by letting children play against one finished wall with a ball, tennis and basketball, for one week. After one week the wall shall not have any evidence of any damage.
- Natural stone: The lowest section of the façade shall be provided with a different cover over the thermal insulation. The height of this lowest section varies in different areas of the kindergarten building, but the contractor shall estimate an average height of 1.2 meters. This lowest section shall be provided with new leveled plaster covered with natural stone.
- Paint thermal façade system with 3 coats of paint rated for exterior use and recommended by the manufacturer of the thermal façade system.
Provide artistic design with combination of colors for a kindergarten building.
- Final certificate: Once the thermal façade is complete, the contractor shall provide a copy of a certificate from the architect certifying that the thermal façade has been properly installed in accordance with their recommendations and in compliance with Bulgarian regulations. Payment for thermal façade shall not be authorized until the contractor provides such certificate.
OHASIS ID 36688 - 36692 Page 27 of 106
Typical thermal facade
Typical installation of thermal facade
Typical installation of thermal facade
OHASIS ID 36688 - 36692 Page 28 of 106
Lowest section with natural stone cover for vandal protection.
Average 1.2 meters around all facility. Picture from NAVFAC project in central Ukraine.
Façade Installations, Extensions and Other Exterior Surfaces
The contractor shall be responsible to reroute, remove and reinstall any of the accessories or installations that are currently anchored or supported by the existing façade which are to remain, including electrical poles, electric cables or conduits, road signs, building sign, grounding cables, security cameras, water pipes, telephone cables, gas pipes, ventilation ductwork, downspouts, and any other installation that may exist on the façade to be provided with new thermal insulation and new finishes. All works to be done in compliance with Bulgarian regulations and with approval or permit of the owner, in case it is owned by a third party. For example: if the electrical cable is owned by the electrical utility company, the contractor shall obtain the approval, or the assistance of the electrical company to remove and reinstall this cable. Or shall pay for the utility company to remove and reinstall. The contractor is responsible for all coordination and for all costs associated with this necessary work. Those installations on the façade that are not be reutilized shall be removed and disposed of by the contractor. The downspouts shall be removed and reinstalled but extending them until the ground level.
All cables currently supported by the existing façade and which shall remain on the façade shall be installed over new PVC channels.
The contract includes repairing the small concrete canopies attached to the façade.
It is the intent of this contract, and it is the scope of work of this contract, to provide the building with the exterior appearance of a new kindergarten building. For that reason, the contract includes the repairs of other exterior surfaces, which require repairs, but which do not require thermal insulation.
These are defined in the pictures included in this document. All these surfaces shall be provided with finishes coordinated with the finishes of the new thermal façade system.
Railing and window metal bars:
Repair and paint all metal railing and bars permanently attached to the building exterior enclosure. This includes the railing for the balconies or the entrance steps.
OHASIS ID 36688 - 36692 Page 29 of 106
Typical façade cleaning with high pressure water.
Removing paint.
Typical façade high pressure cleaning. Removing plaster.
Typical required “colorful” color combination for the kindergarten. The contractor’s architect shall propose several façade designs for the selection of the beneficiary and the acceptance of the Contracting Officer Representative.
OHASIS ID 36688 - 36692 Page 30 of 106
Typical required finishes for the façade, from a recently completed NAVFAC project in Bulgaria (Klikach). The contractor shall use similar natural stone in the lowest section and adequate perimeter sidewalk where there is not a sidewalk.
OHASIS ID 36688 - 36692 Page 31 of 106
3.5 Thermally Insulated Façade System – Specific Requirements
The contractor shall hire the services of specialized and licensed technicians in Bulgaria to design the new thermally insulated façade system for all exterior walls of the kindergarten complex. This system and design and contract includes all necessary items to provide a new thermally insulated system to give the appearance of a new kindergarten building. In order to meet this requirement, the contract includes items such as the ones specified herein:
- Electric Boxes: All electric boxes or panels attached or supported or leaning against the building façade shall be replaced with new boxes or panels. The contractor shall coordinate with the electrical utility company, and during a power outage to be planned after normal working hours, the contractor shall remove the boxes or panels and replace them with new ones, to be supported on the new façade system.
- Sidewalks: On 50% of the perimeter of the exterior walls, the contractor shall provide reinforced concrete sidewalks, with minimum width of 1.2 meters and minimum thickness of 15 cm, to provide adequate connection between the thermally insulated façade system and the floor. See picture on page 35 for location.
- Gutters/Downspouts: These elements shall be provided as required by the design of the façade system and in compliance with Bulgarian regulations to protect the new façade system.
- Railing: All metal railing within 3 meters of the exterior façade of the building shall be repaired and painted in order to provide the facility with the appearance of the new building.
Colors to be selected and proposed by the designer of the façade system. See pictures.
- Balcony covers: The covers of the balconies of the second floor shall be completely removed and replaced with new in compliance with Bulgarian regulations. The contractor shall:
Reutilize those structural members which are found and certified by the designer to be in compliance with Bulgarian regulations.
Paint all metal to remain Provide new sheet metal roofing Provide adequate gutters and downspouts for these elements Provide adequate snow protection for the covers.
- Lighting fixtures: Provide a total of 6 LED lighting fixtures. Exact location of the new exterior lighting fixtures to be indicated by the Kindergarten Director. Each LED technology floodlights shall have minimum 25 Watts. Each floodlight shall be provided with its own individual switch to be located inside of the kindergarten building. Each one of the required 6 switches shall have 3 positions:
On: Always the lighting is on or functioning Off: Always the light is not working or off Automatic: The light turns on when motion is detected or when it is dark outside.
Each lighting fixture shall be provided with a motion sensor and/or a light sensor (so that it turns on automatically when it is dark outside). For estimating purposes the contractor shall estimate 6 motion detectors and 6 light sensors. All lighting fixtures to be rated for exterior use. All exterior electrical installation to be rated for exterior use.
OHASIS ID 36688 - 36692 Page 32 of 106
Required exterior LED technology floodlights. Provide minimum 25 Watt each unit. Rated by continuous exterior use.
With motion or light sensor.
Typical vandal-resistant rated exterior lighting fixture.
Typical exterior LED lighting fixture with motion detection.
OHASIS ID 36688 - 36692 Page 33 of 106
Acceptable man-lift
Required type of scaffold
Required type of scaffold
3.6 Scaffolding
In order to execute the works included in this project, the contractor will be required to use scaffolding and/or elevating working platforms.
Despite the scaffolds that may be authorized by Bulgarian regulations, the contractor is only authorized to utilize European Standard scaffolds similar to the ones shown in pictures below.
These scaffolds shall be installed and used in accordance with manufacturer’s recommendations. In case the contractor needs to access the façade at any particular point without the need to install scaffolds, the contractor shall use a CE certified (European Community) self-propelled man-lift, similar to the one shown in picture below. The use of other type of scaffolds, other non CE certified man-lifts, or any type of ladders for façade or roof work, IS NOT AUTHORIZED.
Some components of European scaffolding
OHASIS ID 36688 - 36692 Page 34 of 106
3.7 Pictures to show existing condition of the Façade and to describe elements of the scope of work
The following pictures do not include or describe all requirements of the contract, but all requirements described in the pictures are part of the contract
Electric panels to be replaced with new. Area of the building requiring new sidewalk.
Replace the 3 existing doors in this picture.
To the left of the main entrance. Typical area requiring new concrete sidewalk.
OHASIS ID 36688 - 36692 Page 35 of 106
To the right of the red line, it is required to provide new sidewalks. To the left of the red line, new sidewalks are not required. All doors and windows in this picture to be replaced with new, with the exception of the central entrance door which can be removed and reinstalled on the new façade system. All metal railing to be repaired as needed and painted.
General façade view. Three windows to be replaced.
Façade to be water blasted in order to remove defective plaster and all paint. Se3ction requiring new sidewalks
Typical area requiring new windows and new sidewalk.
OHASIS ID 36688 - 36692 Page 36 of 106
Typical large windows from the playing and sleeping areas for the children. All to be replaced with new units with operational panels as in the Chervenata Shapchitsa Kindergarten. Provide new windows sills in all windows.
Door to be reutilized. All other windows to be replaced with new.
Exterior façade with most areas covered with windows to be replaced with new.
OHASIS ID 36688 - 36692 Page 37 of 106
Defects in the plaster of the façade to be repaired before applying the thermally insulated façade system. In this particular area, for example, the façade shall include an adequate drainage for the rain water and snow. Provide new lighting fixture.
Window and door to be replaced with new.
Except main door, all glazing elements to be replaced with new units.
OHASIS ID 36688 - 36692 Page 38 of 106
Balconies: make the necessary structural repairs as required by the designer hired by the contractor in order to certify them as in compliance with Bulgarian regulations. Repair and paint all metal elements to remain. Provide new sheet metal roofing with the necessary structural members to provide a perfectly horizontal surface (contrary to the existing one which is bent due to inadequate structural support)
Typical façade defect and windows in one of the interior patios.
Typical windows and doors to be replaced with new
OHASIS ID 36688 - 36692 Page 39 of 106
Typical element of the building not requiring thermal insulation, but requiring similar new finishes as in the building.
See railing to be repaired and painted.
Typical façade defect to be repaired after water blasting
Typical windows in internal patio, in area with two floors.
OHASIS ID 36688 - 36692 Page 40 of 106
Relative required size for the plaque
Typical similar plaque provided in a NAVFAC completed project
3.8 COMMEMORATIVE PLAQUE
The contractor shall provide and install at the location indicated by the kindergarten Director an anodized aluminum commemorative plaque with the following information engraved on it:
Colored Flag of Bulgaria Colored Flag of the United States of
America This text: “The repairs to this kindergarten were made possible through a donation from the people of the United States of America to the People of Bulgaria with the support of the Office of Defense Cooperation and US Embassy in Skopje– Date”
Same text as above in Bulgarian.
- Minimum thickness 8 millimeters
- Minimum dimensions 60 centimeters wide by 45 centimeters high.
- Resistant to outdoor weather and UV radiation.
- Plaque to be manufactured by specialized company.
- Before purchasing the plaque, the contractor shall submit the design to the Contracting
Officer for approval.
OHASIS ID 36688 - 36692 Page 41 of 106
4 CLIN002 - GENERAL SCOPE OF WORK OF BASE-BID IN
CHERVENATA SHAPCHITSA KINDERGARTEN
The Base-Bid of the contract for the Chervenata Shapchitsa kindergarten includes the repairs of the cracks on the façade, the installation of a thermally insulated façade system over the repaired façade, and the replacement of the few remaining wooden and/or aluminum windows and exterior doors. Additionally, the Base-Bid also includes the complete renovation, alteration and improvements to the 4 bathrooms for children and one bathroom area for adults.
General exterior sizes of the kindergarten
OHASIS ID 36688 - 36692 Page 42 of 106
4.1 Crack Repairs – Thermally Insulated Facade
The kindergarten building was surveyed and evaluated by the Chief Architect of Targovishte in February 2018. The Chief Architect confirmed visible cracks on the façade walls 1 to 4 mm width.
She concluded that those cracks result from the soil compaction process occurring beneath the building foundations and that at the present moment those processes have completely subsided over the course of 50 years of the building exploitation period. In addition to the façade cracks, a much larger diagonal crack in the southwestern part of the building, located to the left of the main entrance, in the section between the two windows belonging to the boiler room and the storage room. This same crack was found extending to the aboveground floors: in the rooms on the ground and second floors. This problem occurred as a result of compromised drainage of water from the roof, which was repaired in 2006 with the replacement of the waterspouts and gutters in the entire building.
The contractor shall hire the services of specialized and licensed architect in Bulgaria to design, supervise and certify the crack repairs in compliance with Bulgarian regulations and following the general guidelines provided herein.
This contract includes in general terms:
- Remove all loose plaster with high pressure water blasting. Contractor shall estimate that this the required water blasting method, approximately 80% of the plaster will be removed.
- Notify the Chief Architect in Targovishte 2 working days before plaster removal for her to inspect the cracks and the contractor’s proposed repair method.
- Provide new reinforced leveling plaster after repair of cracks
- Notify the Chief Architect in Targovishte 2 working days before completion of the crack repair. The thermal façade installation shall not start on any section of the façade until the Chief Architect in Targovishte has had the opportunity to inspect the crack repairs with two days in advance notice.
- Apply thermal insulation façade system
- Provide new gutters and downspouts
- Provide continuous exposed natural stone on the lowest section of the façade, matching existing
Removal of plaster and paint and inadequate concrete
The contractor shall use high pressure water blasting at minimum 100 bars to remove all poorly attached plaster from the building. This high pressure water blasting will also remove all the paint and any defective masonry, plaster and concrete elements. It is estimated that minimum 100% of the paint and 80% of the plaster will be removed by means of this required high pressure water blasting.