N3319119R0400_AMENDMENT_0002.pdf
PDF 110 KB Posted
- Attached to
- D-B Renovate Novoyavorivsk Hospital, Ukraine
- Solicitation number
- N3319119R0400
About this file
N3319119R0400_AMENDMENT_0002.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19R0400_Novoyavorisk_Amend_0003.pdf | ||
| N3319119R0400_AMEND_0001.pdf | ||
| N3319119R0400_19R0400_Novoyavorivsk_-_Pre_sol.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3319119R0400 AMENDMENT 0002
1. The purpose of this modification is to respond to Pre-Proposal Inquiries.
PRE-PROPOSAL INQUIRY 001
If offeror (legal entity registered in SAM) is formed only for submitting for the projects only with no construction operations on the balance, is it eligible to bid for this project in case the subcontractor is fully in compliance with the requirements under this solicitation? Or only JV formation is the solution under mentioned circumstances to bid for this solicitation?
PRE-PROPOSAL INQUIRY RESPONSE 001
Section 00100 - Bidding Schedule/Instructions to Bidders Paragraph 5. REQUIRED
PROPOSAL DOCUMENTS (B) NON-PRICE FACTORS: (1) Factor 1, Corporate Experience includes the following guidance:
If the Offeror is a Joint Venture (JV), relevant project experience shall be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects should be submitted for one of the Joint Venture partners. Offerors are still limited to a total of two (2) projects combined.
The offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The
Offeror must provide a letter of commitment and an explanation of the subcontractor’s role in the performance of this contract.
Additional requirements are included under the other two Non-Price factors and in Section III.
REQUIREMENTS FOR OFFERORS.
Therefore, an offeror can utilize experience of the subcontractor as long as the required documentation is provided. However, it is still the responsibility of the offeror to ensure compliance with environmental laws, regulations and requirements and coordinating with the local, regional, national authorities.
2. All other terms and conditions remain unchanged.