Attachment 1 - Performance Technical Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N33191-15-R-1206-0001.pdf | ||
| Attachment_2_-_Contract_Data_Sheet.doc | DOC document | |
| N33191-15-R-1206.pdf | ||
| Attachment_4_-_Submittal_Checklist.pdf | ||
| Attachment_3_-_PPQ.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EUCOM Humanitarian Assistance Program
Veteran Eye Care Hospital Renovations
Odessa - Ukraine
Odessa, Ukraine
OHASIS ID-24319
November 2014
VERSION 001
Renovation of Odessa Eye Clinic for Veterans
OHASIS ID 24319
VERSION-001
Location of the facility
Location of Odessa
1. PROJECT DESCRIPTION
1.1. GENERAL
Provide all material, equipment and labor to renovate the Eye Clinic/Hospital for Veterans and Senior Citizens of Odessa (Ukraine), as identified herein.
1.2. GENERAL SCOPE OF WORK
The work is divided into a BASE-BID and 2 CONTRACT OPTIONS. The Government reserves the right to unilaterally award, or not to award, the contract options. The contractor will provide separate pricing for the Base-Bid and the 2 contract options as required in the solicitation documents.
Base Bid:
Roof replacement on section of building Façade restoration on section of building Modification of internal layout and complete renovation in section of building Commemorative plaque
Option-1: Renovation to surgical areas
Option-2: Restoration of all exterior façade of the building
It is absolutely necessary for the contractor to visit the site in order to verify existing conditions and quantify the amount of work, prior to the submission of their offers to the Contracting Officer. These Performance Technical Specifications (PTS) does not include measurement. The US Government is not responsible for any mistakes or omissions that the contractor may have made during preparation of their offers.
2. DETAILED SCOPE OF WORK (BASE BID)
This portion of the contract described in paragraph 2 and all its subparagraphs corresponds to the minimum portion of the contract that will be awarded to the successful offeror.
NOTE: HISTORICAL BUILDING
The building is officially classified as a “Historical Building”. Therefore, any works to be performed in the building need to be authorized by the competent Ukrainian authorities responsible for historical building renovation/restoration. The contractor needs to be familiar with the technical and administrative requirements to perform works in historical buildings in Odessa. Any official technical requirement of the Ukrainian agency responsible for historical buildings in Odessa which may be in addition to the technical requirements of this document shall be considered to be an integral part of this contract.
2.1 ROOF REPLACEMENT
The contract includes the complete roof replacement on a portion of the building as highlighted in the picture below:
Section of the building requiring replacement of the roof
2.1.1 Design and Construction Permits (or Authorization)
The contractor shall strictly comply with Ukrainian legal and administrative requirements. For this reason, and among other requirements, before the contractor is authorized to start any work, they shall obtain the necessary construction permits from the competent Ukrainian authorities,including the competent agency in Odessa responsible for historical buildings. This includes preparing designs, studies, calculations, reports or any other technical documentation that may be required, as well as coordinating with the competent Ukrainian authorities, and paying for any fees that may be required in order to obtain the necessary permits. The contractor shall send a scanned copy of the Construction Permit or Authorization to the Contracting Officer in order to obtain the Notice to Proceed for the roof replacement.
It is the contractor responsibility, and part of this contract, for the contractor to perform any required procedure, process and coordination, to attend meetings, to pay for any fee, and anything that may be necessary, in order to obtain the necessary Authorization or Permit for Construction. The US Government remains at the contractor’s disposal for any assistance that they may consider necessary or recommended in order to obtain such Permit/Authorization.
The contractor shall hire the services of an architect licensed in Ukraine to perform a design for the new roof. This design shall be properly certified as required by Ukrainian regulations. The design shall include the uplift forces, the specific temporary conditions during the installation of the new roof, the wind and snow loads, as well as other factors, necessary for the proper design of the new roof. The shape of the new roof shall be the same shape of the existing roof, but the contractor may propose minor alterations to be approved by the Contracting Officer. Any modification to the existing roof design shall be considered a contract requirement if this modification is required by the agency responsible for historical buildings.
2.1.2 Removal of Asbestos Preformed Roof Sheets
Removal of existing roof panels or cleaning the roof deck IS NOT INCLUDED IN THIS CONTRACT.
However, the contractor is required to coordinate removing all asbestos containing materials with the Hospital Administration. The contractor shall allow time loss due to the required coordination with local authorities for the removal of the roof tiles and for cleaning the roof floor. THIS CONTRACT DOES NOT INCLUDE ANY ASBESTOS REMOVAL. The contractor SHALL NOT handle, manage or dispose of any of the roof material containing any asbestos as part of this contract. This includes roof sheets as well as asbestos containing material laying on the floor of the roof floor surface.
However, the contract includes the installation of any scaffolding system that may be necessary for the Hospital Administration to remove the existing roof panels and all asbestos containing materials.
These scaffolding systems shall be in accordance with paragraph ??. The contractor shall provide all equipment and tools that may be necessary for the removal of asbestos material, but the actual manpower shall be provided by the local authorities, not by the contractor.
The removal and installation of roof sheets shall be phased on order to minimize the possibility of damages in the building as a result of rains and in coordination with the minimum 2 phases of work for internal renovations (detailed in Phasing paragraph ??). The contractor is responsible to protect the building at all times and is responsible to correct any damage that the rain may cause during the roof replacement included in this contract.
2.1.3 Other demolitions
The contractor shall remove all gutters and downspouts, any remaining debris or materials left on the ceiling under the roof (not containing asbestos), wood supporting structure, lighting protection, electrical lighting, and everything else that may affect the installation of the new roof.
Any removed materials by the contractor shall remain the property of the contractor and they shall be removed from the premises and disposed in compliance with Ukrainian regulations.
2.1.4 Structure and Supporting Concrete Beam
The contractor shall completely remove the existing wooden roof structure
The contractor shall provide a perimeter reinforced concrete beam (or ring) around the perimeter of the roof area under the contract, supported on the exterior load bearing walls. This concrete ring shall have the same width as the exterior walls and minimum 40 centimeters height and shall be used to support the new roof supporting structure.
The contractor may reutilize any of the existing wooden structure if, and only if, it is found to be acceptable by the architect hired by the contractor. However, for estimating purposes, the contractor shall estimate that 100% of the roof structure shall be replaced.
Any wood to be used for the roof supporting structure shall be treated against fire and termites as required by Ukrainian regulations.
2.1.5 Preformed metal sheets (material)
Provide new preformed metal roofing panels. Metal panels shall be galvanized steel with a minimum thickness of 0.53 mm, and coated with Polyester, High Build Polyester or Matt Polyester (HBP/PE/MPE). All panels to be formed at the manufacturing plant. 5-7 kilograms per m². Color and pattern to be selected by Hospital Administration in coordination with agency responsible for historical buildings in Odessa. Pattern to resemble ceramic tiles. The use of “sandwich” type panels is also acceptable to substitute the metal panels and the thermal insulation.
2.1.6 Roofing System
The architect hired by the contractor shall design a new roof system. The new roofing system shall include a perimeter eave of same dimensions as the existing (approximately 40 cm). The contractor architect will be able to choose between 2 technical alternatives, as described in paragraphs 2.1.6.1 and 2.1.6.2, with the thermal insulation under the roof metal sheets or over the floor of the roof surface respectively:
2.1.6.1 Technical Alternative-1: Roofing System with Insulation Under the Metal Sheets
The architect hired by the contractor can design a roofing system with thermal insulation properly supported and protected under the metal sheets and asphalt vapor barrier. The actual roofing system shall be designed and certified by the architect. The new roofing system shall include the elements listed in the sketch below:
- A. Preformed metal sheets.
- B. Asphalt sheet, to be used as vapor barrier, and to be installed as recommended by the manufacturer.
- C. Solid support for asphalt sheet. Material, sizes and thickness to be designed by the architect hired by the contractor.
- D. Thermal insulation. Minimum 15 centimeters thickness. Material to be selected by the architect hired by the contractor.
- E. New treated wood secondary structure. Size, location and quantity to be designed by the architect hired by the contractor.
- F. Solid Support for Thermal Insulation. Material and sizes to be designed by the architect hired by the contractor.
- G. New primary Structure treated against fire and termites.
Typical roofing system with insulation under the metal sheets
A. Preformed metal sheets
B. Asphalt sheet
D. Thermal insulation (15 cm)
E. New Treated Secondary Structure
C. Solid support for asphalt sheet
F. Solid support for thermal insulation
G. New Treated Primary Structure
A B C D E F G
Typical roofing system without thermal insulation under the metal sheets
Picture#03-c: Typical floor of the roof with new thermal insulation on the floor
2.1.6.2 Technical Alternative-2: Roofing System with Insulation on the Floor under the Roof
The contractor designer may choose as an alternative to the system described in the previous paragraph a different system with the thermal insulation on the floor. In order to do this, the contractor shall install the new thermal insulation on the floor, and provided with wooden paths to walk under the roof without stepping over the thermal insulation. Once the thermal insulation is installed it shall be covered with vapor barrier provided by the manufacturer of the thermal insulation. The existing wood structure and the new wood shall be treated against insect and fire before applying the thermal insulation (approximately 20 cm thickness).
In order to have a perfectly maintainable roof, the contractor shall design and install wooden walkways to the windows of the roof and other elements requiring regular maintenance (i.e new lighting system)
A. Preformed metal sheets
B. Asphalt sheet
G. Thermal insulation (20 cm) with vapor barrier
D. New Treated Secondary Structure
C. Solid support for asphalt sheet
F. New walkways
E. New treated Primary Structure
Typical required walkways and continuous vapor barrier over thermal insulations if option 2.1.6.2 is selected by the designer. Pictures from NAVFAC finished project in Romania.
New additional required dormers required for roof ventilation. Typical snow stops.
Typical required finish of the inside of the roof in alternative 2.1.6.1. Thermal insulation to be covered and supported by solid cover.
Definition of roof eave.
Typical roof thermal insulation support installation as required in alternative 2.1.6.1
Existing roof window to be replaced with new PVC thermally insulated window and provided with bird screen to avoid birds entering the area under the roof when the window is open
2.1.7 Windows/Ventilation/Dormers
Replace existing windows on the roof using thermally insulated PVC windows, provided with bird screens. Provide 4 new windows openings (dormer) for ventilation of the roof unless forbidden by the agency responsible for historical buildings. Provide all window openings with double glazing PVC windows provided with protection against birds entering into the space under the new roof when windows are open. The design of the ventilation system shall be coordinate with the design of the roofing system.
2.1.8 Lighting Protection
Install a new lighting protection for the roof in strict compliance with applicable Ukrainian Electric Code. If ground resistance is not sufficient (<5Ω), the contractor shall be responsible to provide a new improved grounding system from the roof to the ground rod. All electrical installation to be designed and installed in accordance with Ukrainian regulations.
2.1.9 Snow Protection
Design and install snow protection on the new roofing. Reinforce the wood structure as necessary for the additional load of snow due to the snow protection.
2.1.10 Electrical Installation
Provide electrical lighting inside of the roof area, with switches at all ends of the area under the roof.
Provide with the necessary electrical protection (short circuit and differential protection).
2.1.11 Gutters and Downspouts
Provide new gutters and downspouts. Gutters shall surround the perimeter of the new roofing, and downspouts shall go from the gutters to the floor level. Size and materials to be selected by the architect hired by the contractor in coordination with the agency responsible for historical buildings in Odessa.
2.1.12 Certificates
The licensed architect responsible for the design of the roof shall among other responsibilities:
- For any partial payment of the roof, the architect shall provide a certificate stating that all works for which payment is requested were performed as required by his/her design and in compliance with Ukrainian regualtions.
- Sign the invoices, including an statement indicating that the roof work was performed as required by his/her design.
- Provide a final certificate at the completion of roof works certifying that all works were executed and completed as required by his/her design and as required by Ukrainian Code.
2.1.13 Warranty
Provide a 10 year written warranty against any water infiltration or evidence of humidity in the ceilings of the top floor and for any damages or leaks in the gutters and downspouts. Warranty letter shall be provided from the contractor to the designated Ukrainian military authority with a copy to the Contracting Officer.
Roof to be replaced with new
Electrical installation in roof to be replaced with new
Wall at one end of the roof
Roof to be replaced with new
Roof to be replaced. Roof to remain at the end.
Inside of roof
Exterior of roof.
Asbestos containing materials on the floor to be removed by others.
Asbestos containing materials on the floor.
Roof exterior
2.2 RESTORATION OF FAÇADE (partial)
The contract includes the complete restoration of the façade on one section of the building as highlighted in the picture below:
The contractor shall hire the services of a licensed architect to prepare a façade restoration project in compliance with regulations for restoration of facades of historical buildings in Odessa and in compliance with all applicable Ukrainian regulations. It is the intent of the project to provide the restored section of the building with the original appearance of the building.
The actual company performing the façade restoration works shall have the necessary permits and licenses to perform such construction activity.
The works shall be performed as required by the approved designed to be prepared by the specialized architect, but as a minimum it shall include:
- Removing paint and loose plaster. This shall be done by high pressure water washing.
Minimum pressure of cleaning equipment to be 200 kg/cm². It is estimated that in some areas the plaster will be completely removed exposing the structural masonry bricks.
- Removing of all wood used to build the ornaments of the façade. Once the façade restoration is completed, there shall be no wood on the façade.
- Prior to providing all ornaments on the façade, fill in the voids and imperfections and cracks and missing rocks on the façade in order to provide a perfectly leveled façade surface.
Some cracks are structural origins. The contract includes not only repairing the effects, but also the causes of the cracks, and therefore it is estimated that in some particular locations the contractor shall have to provide new internal steel reinforcement to avoid further development of the cracks in the future. Crack repair to be certified by the architect hired by the contractor.
Exterior of the hospital building requiring façade restoration
Existing building in front of the hospital building to be renovated. It is the intent of this contract to provide the restored façade surfaces with the original design of the building, similar to the recently renovated
Required exterior LED technology floodlights. Provide minimum 2 units with individual switches and photocell.
Provide minimum of 50 Watt each
- After correction of the façade imperfections and damages, and prior to providing the ornamental elements, provide a waterproofing leveling layer on all exterior façade surfaces.
- Provide leveling and finishing lime based mortar with similar ornaments as the original design of the façade. This is required for all façade surfaces. The contractor shall use the original ornamental finishes of the front façade on the back side of the building, where these were not used, or were completely removed with time. Once completed, the finishes on all exterior facades of the restores areas shall have the same exterior appearance.
- Provide primer paint coat and 2 additional coats of latex paint in combination of 2 colors for all the façade areas except the exposed rocks at the bottom which shall be provided with different finishes as required by the architect’s design.
- Provide a 2 meters wide reinforced concrete sidewalk around the perimeter of the façade to be repaired where technically possible. New sidewalks to be built with minimum 2% slope.
This will require removing a section of the existing pavement. This is to guarantee proper drainage and finishes between the façade and existing pavement.
- All existing utilities or equipment supported by the existing façade that need to be reutilized after the contract shall be removed and reinstalled as part of this contract. For example:
electric cables, flag poles, lighting fixtures, signs, … The lighting fixtures shall be removed and two new LED technology floodlights with photocell shall be installed (minimum 2 units)
Due to the poor condition of the façade, and the modifications and alterations that it has suffered in the last decades, the following paragraphs provide additional details in relation with the works required under this paragraph.
Typical exterior PVC window installation
Typical PVC window installation. Seal all areas around new windows. Foam not exposed.
Typical PVC window installation with new PVC sill inside and aluminum outside.
PVC sill inside and aluminum outside.
Window leaf opening horizontally and vertically
2.2.1 Windows
All windows along the façade to be repaired shall be replaced with new windows with 5 chambered PVC profiles and double glazing of minimum thickness 6-16-4.
This project does not include measurements. It is the contractor’s responsibility to visit the site and measure the windows to be replaced as part of this project. This project includes the replacement of all the windows, including the basement windows and some with special shapes, such as with an arc on the top. New windows shall have the same shape as the existing ones to be replaced. Glass brick windows are also included in this contract.
New windows shall have minimum 50% operational panels, opening horizontally and vertically.
The contractor shall make the required adjustments and repairs to the window wall opening before installing the new windows.
The contractor is responsible to visit the site, to take note of the existing conditions of the window openings and to make all required measurements to quantify the amount of work required by this contract. In the ground floor, provide all windows with new window blinds.
Typical window profile
Typical window blind
Some windows are provided with security bars. These security bars shall be removed and replaced with new security bars as designed by the architect hired by the contractor and in coordination with the agency responsible for restoration of historical buildings.
The basement windows are in terrible condition. Once the project is completed all basement windows shall have the same exterior appearance. The size of the basement windows shall be reduced as necessary so that the bottom sill is higher than the exterior grade elevation. This is to avoid any possibility of exterior surface water to enter into the basement.
2.2.2 Doors
The area under the Base-Bid of the contract has three completely different types of doors:
2.2.2.1 Main Entrance Door
The existing main entrance door on the front façade of the building has not been used for decades.
The existing door is over 100 years old. It would be the first option and alternative of this contract to renovate this door, by taking it to a restoration specialist to provide the door with new restored surfaces and new heavy duty stainless steel hardware (hinges, door stop, locksets, etc).
If the door is beyond repair, the contractor shall provide a new solid wood door with similar design and materials as the existing one.
Entrance Door to building extension in the back door
Main entrance door
2.2.2.2 Entrance Door to Building extension in the back facade
The existing entrance to the building addition on the back façade shall be replaced with new thermally insulated door, as required by the design to be prepared by the architect hired by the contractor to repair by replacement this entire building extension or addition. Door design to be coordinated with the façade design.
2.2.2.3 Basement entrances
There a a minimum of 3 entrance doors to the basement along the section of façade to be restored under the Base-Bid of the contract. Some are wooded and some metal. The contractor shall provide new galvanized and thermally insulated metal doors to access all entries to the basement.
Basement entrances to be completely redone. All surfaces around the new entrances to be new.
2.2.3 Basement Canopies and Entrance (back side of the façade)
There are 2 entrances to the basement on the back façade to the restored under the base-bid of the contract. As in the rest of the façade, it is the intent and the requirement of this contract to provide these entrances with their original appearance or with the appearance of new construction. For that reason the contractor shall perform among other items of work:
- Coordinate with the Hospital Administration the removal of the asbestos containing canopy roof sheets. This contract does not include any asbestos removal.
- Removal of canopy structure, steps and all concrete surfaces around the existing steps.
- Replacement of the 3 entrance doors to the basement. Use thermally insulated galvanized metal doors provide with heavy duty hinges and locks.
- Provide new steps provided with exposed concrete finishes.
- Provide new metal railing to enter the basement supported on the new concrete walls on both sides on the steps.
- Provide new canopy structure and cover as required by the agency responsible for the renovations of historical buildings in Odessa.
Remove indicated structure
2.2.4 Removal of unknown structure
Remove and level floor with new concrete pavement the unknown structure indicated in the drawing below:
Typical heating pipes and valves
2.2.5 Repair by Replacement Secondary Entrance
The indicated secondary entrance shall be completely removed and replaced with a new one, with finishes designed to match the original external ornamental design of the building. This includes the room and the entrance steps. New facility to have the same internal dimensions as the one to be removed. Reutilize the existing foundations to the maximum extent technically possible.
This new construction shall be provided with walls with the same thickness as the original building, or to be provided with thermal insulation.
2.2.6 Heating Pipes
On the back side of the building, there are heating pipes with removed thermal insulation. These pipes shall be provided with adequate thermal insulation and the thermal insulation protected with new aluminum jackets.
2.2.7 Main Front Entrance
The main building entrance has been blocked for decades. It is the intent and the requirement of this contract to restore the main entrance to the patient ward of the hospital. For that reason, the contract includes preparing a new design to provide this main entrance with a ramp and steps. This will require removing the existing steps and a section of the front fence in order to perform the necessary new ramp and steps.
The steps shall be fully covered with ceramic tiles, non-slippery and rated for exterior use. The steps will be provided with special ceramic tiles and the ramp shall be provided with a new stainless steel ramp.
The design of this element, including the materials to be used, shall be approved by the agency responsible for historical buildings in Odessa as it will affect the appearance of the building.
2.2.8 Front Façade Drainage Sidewalk and Parapet
Along the front façade to be restored, there is a concrete sidewalk and parapet in very poor conditions. The contract includes the repair by replacement of these structures, using reinforced cast0in-place concrete structures, in order to provide the front façade with the exterior appearance of the original design.
Typical façade to be restored.
- Basement doors and entrance walls including the parapet, to be replaced
- Canopy to be replaced.
- Cracks to be structurally repaired before leveling the façade surface.
- Heating pipes to be insulated and provided with aluminum jackets (up to 2 meters away from the façade)
- Windows to be replaced.
- All orange surfaces shown in this picture included in the scope of work of the façade restoration
- Sidewalks 2 meters wide starting from the façade, or from the basement entrance parapets.
- All wood from the façade ornamental elements to be removed
2.2.9 Pictures to Explain the Scope of Work of the Façade Restoration
There are numerous items of work included in the façade restoration, which shall be identified by the specialized and licensed architect hired by the contractor and included in their façade restoration design project. However, to better understand the scope of work, the following pictures with explanation are included. All description of work in the pictures are considered to be part of the contract.
Details of exposed wood
Building extension to be repaired by replacement
Limit of Base-Bid façade restoration
Limit of Base-Bid façade restoration
Basement window to be replaced. Pavement to be new concrete up to 2 meters away from the facade
Back façade to be completely restored
Cracks to be repaired prior to façade restoration
Basement window to be completely restored
Basement entrance to be completely restored
Canopy to be replaced with new
Windows to be replaced and façade restored
Basement parapet walls to be restored
Typical basement window to be restored. It may be necessary to raise the bottom to avoid water infiltration.
Basement windows in front façade to be replaced
Main entrance bridge to be rebuilt
Basement parapet walls to be restored or replaced if necessary with new concrete parapet containment wall
Typical front facade
Limit of front façade restoration
In red: New required walls. In green: New openings in the walls for new hallway
2.3 NEW INTERNAL LAYOUT
The contract includes the complete alternation of the internal layout of the patient wards. In general, the hospital currently has 5 large patient wards and a wide hallway. Once the project is completed, the hospital shall have 10 smaller patient wards each provided with a bathroom, a narrower hallway (2.6 meters) and a nurse room.
Existing internal distribution and layout of the patient wards
New required internal distribution and layout
New required internal hospital rated doors marked with blue circles
Potential location of the bathrooms (in yellow)
General Basis of design for new layout:
- All areas in the patient ward shall be rated for people on wheelchairs. For example: all door free openings to be minimum 90 cm, all floors to be provided without any tripping hazards or bathrooms to be certified to be used by people with mobility disabilities.
- Hallways: Usable width (wall to wall) to be minimum 2.6 meters
- New partitions: The contractor can use either plastered masonry wall using ceramic hollow bricks of maximum width 15 cm, or gypsum board over galvanized steel structure. If gypsum board is selected, the contractor shall use double-double boards. This means that for every partition, the contractor shall use 2 gypsum boards, noise insulation of minimum 10 cm, and another 2 gypsum boards, or 4 gypsum boards for every partitions with internal noise insulation.
- Each large patient ward (#1, 3, 5, 7 and 9) and the smaller dining room to have 42 to 44 m² of usable area
- Each small patient ward (#2, 4, 6, 8 and 10) and the nurse room to have 22 to 27 m² of usable area
- Each patient ward to have its individual bathroom, rated for people on wheelchairs.
Bathroom to be minimum of 4 m² of usable area (2.2 x 1.82 m) and provided with the following plumbing fixtures: WC, sink and floor drain.
- Nurse Room provided with a wall mounted sink
- Design internal layout of rooms to maximize the use of available space. For example, if we are blocking a door in Patient Ward#10, and the wall is 80 cm thick. The contractor shall block the wall with think masonry wall of 20 cm and use the remaining 60 cm to build a new recessed closet. Maximization of available space is the responsibility of the contractor’s architect.
Existing hallway to be converted into 6 different rooms and a section of a new hallway
Structural modifications:
The new required layout includes providing new openings on existing load bearing walls. These openings shall be done as indicated and in the physical presence of the architect hired by the contractor to prepare the design for this new required layout. Making openings in load bearing walls is technically possible, but shall be done with extreme care, by specialized workers. Minimum of 2 structural lintels (pre-cast concrete beams or structural steel) shall be provided on all openings on load bearing walls.
Existing internal architectural ornaments:
This is a design-build contract, and therefore the contractor shall hire the services of a licensed and specialized architect to provide the proposed design for the internal renovations of the facility. It is the intent of the project to provide modern internal finishes, while maintaining to the maximum extent possible the original ornamental elements of the building. For example, the two columns in the Reception Area shall be restored and not removed or modified. The height of the new suspended ceiling shall be as low as possible to lower the energy consumption of the facility, but at the same time, shall be as high as possible to expose the original ornaments of the building or to match the height of the existing windows.
2.4 INTERNAL RENOVATIONS
As described in the previous paragraph, the existing section of the hospital currently used for the patient wards will be completely remodeled. The contractor shall hire the services of a licensed architect to provide a complete design package for the new required layout with the finished required herein.
Some element of work will be common for all renovated internal areas:
2.4.1 Demolitions
Demolish everything within the areas to be renovated. This includes electrical installations, plumbing installations, communications, flooring, wall plaster, drop ceiling (ornamental), ceiling plaster, heating systems, stoves, and everything necessary to perform the works included into this contract.
2.4.2 Electrical Installation
Provide a new electrical installation in strict compliance with Ukrainian standards and regulations, and with the particular additional technical requirements of the electrical utility company, for the areas under the scope of work of this contract.
In addition to the new electrical installations the contractor is required to move one main electrical panel located in a wall to be removed in order to provide the access door to the new patient ward hallway from the surgical area.
The contractor shall connect a new electrical circuit to the main electrical panel of the hospital building. This new circuit shall be provided with the necessary electrical protections. This new electrical circuit shall supply electrical power to a new electrical panel to be located recessed on a wall in the reception area. From this new electrical panel, the contractor shall provide electric power to all the renovated areas under this contract.
The contractor is responsible to study and analyze the existing electrical installation of the hospital to verify that all areas of the hospital, which are currently supplied with electrical power, and are not under the scope of work of the internal renovations of this contract, shall continue with electrical power after the renovations are completed. For example: if a room adjacent to the areas to be renovated is supplied from an electrical circuit from the renovated areas, the contractor shall provide a new power supply to this room, so that when the electrical installation in the renovated areas are removed, this room continues to have electric power.
All electrical installations shall be recessed on the wall and ceilings, so that no electrical cable or conduit is visible. This includes conduits, junction boxes, switches, lighting fixtures, electric panels, and all electrical installations within the renovated areas.
All electrical equipment to be used to be CE certified. All circuits to be provided with differential protection of 30 mA.
Typical minimum lighting levels required for different areas
Lighting: Provide rapid start fluorescent and LED technology lighting for different areas, as required and detailed in this document. Provide the minimum illumination levels required by Ukrainian regulations for the intended use of each room. For the final acceptance of the facility, the contractor shall provide a lighting meter (lux meter) to measure the actual illumination level of each room in comparison with the levels required by Ukrainian regulations. In case the Ukrainian regulation does not include these requirements, international standards shall be utilized.
All electrical circuits to be installed under conduit. Conduits to be recessed within the floors, walls and ceiling so that they are not exposed to the view. Direct installation of cables under the plaster without conduits IS NOT AUTHORIZED.
Typical required electrical panel to be recessed on the walls
All electrical mechanisms to be recessed in the new walls. Provide wide mechanisms as shown. Provide telephone plugs as the one shown on the middle left of the picture.
Typical conduit recessed on the wall
Electric panel to be moved. The contractor shall provide a 2.6 meter wide opening on this wall and provide a hospital rated door.
Typical conduit to be recessed on the walls
2.4.3 Floors
All floors in the renovated areas shall be perfectly leveled and provided with the same finished elevation, except in the bathrooms where they shall be sloped towards the new floor drains.
The contractor shall completely remove all existing flooring surfaces and provide new non-glazed porcelain ceramic tiles. The contractor shall install, diagonally with respect to the walls, new porcelain stoneware tiles of large size/format. Minimum standard acceptable sizes would be 90x90, 45x90, 30x90, 60x60, 40x40 or 48x48 cm. Anything less than 0.16 m² per tile is not authorized
The name “porcelain stoneware” indicates a non-glazed, dry-pressed, highly compact, ceramic product with high quality, technical specifications (these tiles are highly flex, graze, scratch, weather and chemical agent resistant) and have a very low porosity. Unglazed porcelain ceramic tiles are hard, dense ceramic tiles; of homogeneous composition throughout, deriving its color and texture from the materials of which the body is made and from the method of manufacture. Unglazed porcelain tiles are very tough and they are extremely vitreous and dense. They are a through-color product and recommended for very heavy traffic areas like hallways they may wear, but will retain their original color. Unglazed porcelain tiles are available in various finishes, from matte to high gloss, and some have textured finishes, made to imitate natural stone.
The minimum technical features of the porcelain stoneware are:
- Water absortion (ISO 10545-3) < 0.1%
- Deep abrasion for non glazed tiles (EN – ISO 10545-6): 102 mm³, K=3
- Surface Scratch according to Mohn: 4
- Slippery coefficient (DIN 51130): R9
- Tiles shall be classified as Class 5 or 4 according to the PEI (Porcelain Enamel Institute rating).
Class 4: Moderate to heavy traffic. High foot traffic areas where abrasive or outside dirt could be tracked (residential entry, kitchen, balcony, and countertop). Class 5: Heavy traffic. Ceramic tile suggested for residential, commercial and institutional floor subjected to heavy traffic
For the bathrooms, in order to provide the necessary slopes, it will be very challenging to use such large tiles. For that reason, it is authorized to use smaller tiles of the same model as the larger tiles required for the rest of the areas. Many manufacturers produce the same tiles in different models.
The contractor shall choose one model which is produced in large and smaller formats.
The contractor shall remove the existing flooring surfaces and underlying materials, as necessary to provide the new mortar glue recommended by the manufacturer and still provide all flooring perfectly leveled, except in the bathrooms where they shall be sloped towards the new floor drains.
The contractor shall provide matching wall base tiles from the same model as the floor tiles and provided by the same supplier along all the walls. The contractor shall remove existing materials as necessary to make the connection between horizontal and vertical surfaces perfectly squared.
Cutting floor tiles to make the wall base tiles is not authorized.
Contractor to provide a minimum of 5 models for the beneficiary to choose the color and pattern.
Typical floor installation in a NAVFAC project in
Bulgaria
Typical required large format porcelain gres tiles installed in a recently finished NAVFAC project in Montenegro.
Picture#141: Typical porcelain ceramic base boards. Use same model as for the floor tiles
Install suspended ceiling at this height or as recommended by the architect hired by the contractor. If this height is selected, in some areas there shall be suspended ceiling and in others the exposed plastered and painted beams.
Typical acoustic drop ceiling support and metal profiles
Typical ceiling with fluorescent lighting fixtures
2.4.4 Ceilings
Existing ceilings are made of ornamental plaster. This contract requires the installation of new acoustical suspended ceiling over galvanized steel supports, at the height to be selected by the architect hired by the contractor. It is estimated that the ceiling shall be installed at different heights depending on the room, but as a general rule the contractor could use the bottom of the horizontal ceiling beams:
The existing ornamental plastered ceiling is cracks in some areas. Prior to providing the new suspended ceiling (Armstrong type), the contractor shall remove this false ceiling surface and repair as necessary the existing ceiling deck. This is because once the new acoustical suspended ceiling is installed, the existing ceiling surface will not be possible to be inspected and therefore it is absolutely necessary to guarantee the stability of the existing ceiling surfaces.
Typical bimetal radiator required in all areas under the scope of work of internal renovations. To be provided with individual control valves.
2.4.5 Walls
All walls shall be perfectly leveled prior to provide the required finishes. If any gypsum board is used to level the existing walls, it is required to use double board systems, to double the thickness of the boards.
2.4.6 Heating
The work includes removing all existing radiator and heating pipes within the renovated areas.
The contractor shall install all new heating pipes recessed within the walls, floors and ceilings, so that no heating piping is visible. The point of connection between the existing and the new piping shall be visible in order to be able to inspect this weak point in the heating piping installation.
The contractor shall hire the services of a licensed engineer to size and locate the new heating radiators. Provide new aluminum bi-metal type radiators, with all required valves and accessories and connect with existing hot water heating system in the building. Design as required to obtain adequate temperature in all areas. All heating piping within the renovated areas shall be recessed with the walls/ceilings. Provide with individual controls in each heating radiator.
Provide heating radiator covers or protection in the patient wards. These covers shall be designed by the contractor’s engineer/architect and installed in coordination with the required finishes of the walls.
Blue: 90 cm door leaf, hospital rated and certified Pink: Double leaf door, minimum 1.80 opening with both leaves open.
Orange: Standard PVC doors for bathrooms
2.4.7 Internal Doors (connected with hallway and for bathrooms)
There are a total of 15 doors connected with the hallway. These doors shall have minimum of 90 cm wide leaf, to be used by people on wheelchair. Doors to be provided with European certificate to be used in hospital facilities.
Doors connected with the hallway shall be standard manufacturer product to be used in medical facilities and provided with the corresponding European and Ukrainian certificate. The use of any door not standard manufacturer catalog product for hospitals is not authorized.
All doors connected with the hallway shall have the same finishes, including wall frames and trims.
The ones indicated in “pink” color in the sketch above shall be similar to the ones for the patient wards, but they shall be double and at least one leaf provided with see through window in the upper half.
Among other requirements specific for medical use of the doors, each door shall be provided with heavy duty stainless steel hinges, stainless steel knob and lockset, door stops, stainless steel kick plate and protection against impacts by wheelchairs.
All doors connecting with the hallway shall be provided with a professional type door label, in Ukrainian and Braille, to be installed on the door or in the adjacent wall
The contractor may use standard PVC doors for the bathroom doors, provided with internal lock, door stop, manufacturer installed locks and hinges.
All doors to be installed without bottom threshold, so that the floor is continuous from one room to the adjacent one, and to allow for proper ventilation.
Hospital rated door used in a recently completed
NAVFAC project in Romania
Typical hospital rated door
Typical hospital rated door
2.4.8 Nurse Annunciator System
The contractor shall design and install one nurse annunciator or alarm system for the renovated areas. The system shall be design so that any patient can push a bottom in each patient ward bed or in the bathrooms to give a signal to the central panel located in the Nurse Room. Push buttons shall be provided with an extensible cord so that they can be used by patients with limited mobility.
The central console shall be capable of identifying the exact location of the alarm (room and bed), and it shall provide an audio alarm in the nurse room. Additionally there shall be a red light on top of each entrance door to the patient wards to indicate in which room were the system activated.
Typical door along the hallway with professional door sign
Typical professional door sign
Areas to be provided with heat pump air climatization
Typical multi zone split type air conditioning system with 4 ceiling mounted units
2.4.9 Multi-zone Inverter Technology Split-Type Air Conditioning
The project includes providing air conditioning to certain areas under the scope of work of the contract. The contract shall provide heat pump systems to the nurse room and 3 patient wards.
Main source of heating shall be provided with the new radiators connected to the central heating system, nevertheless the air conditioning shall use heat pump technology, to provide heating and cooling as necessary. Heating by the use of electric resistance is not authorized.
The contractor shall hire the services of a specialized company or engineer to design the new air conditioning system. For estimating purposes, the contractor can estimate a system with the following technical parameters:
- Heat pump system using inverter technology or variable refrigerant flow. Capable of providing hot and cold air.
- 40 KW of cooling power (and corresponding heating power for heat pumps)
- The contractor shall provide one exterior unit and 4 internal units.
- Exterior unit to be surface mounted over a new concrete pad (not wall mounted)
- Internal units cassette type installed above the new ceiling surface. Do not use wall mounted internal units.
- Individual temperature control in each room.
- Drainage from the condensate to be routed to the exterior of the building
- Designed to provide an internal temperature of 22 degrees Celsius in worst summer conditions in Odessa.
Exit sign with lights
Typical fire control panel
2.4.10 Fire Alarm and Fire Emergencies
The contractor shall remove the existing fire alarm system in the renovated areas and provide a separate fire alarm panel connected to new smoke detectors, fire detectors, pull stations, horns, strobe lights, and everything that may be required in compliance with Ukrainian Fire regulations.
The work includes the necessary adjustments to the existing fire control panel so that it remains to be operational in the areas not under the scope of work of this project.
Additionally, the contractor shall provide all necessary emergency lights, emergency escape signs (EXIT), emergency route sketches on the walls, anti-panic hardware on the doors leading to the exterior, and everything that is required by the Fire and Emergency Escape regulations in Ukraine.
It is estimated that it is necessary that the competent Fire Department reviews and approves the renovation technical project.
Anti-panic hardware
Typical fire alarm system diagram
2.4.11 Water and Sewer Lines
All sewer and water lines shall be new and connected with existing systems in the basement of the building. Sewer lines to be PVC rated for gravity sewer systems. Water lines to be HDPE rated for potable water systems.
2.4.12 Required finishes for each particular room
The previous paragraphs indicate general requirements for all rooms. In addition to these requirements the contractor shall provide the following finishes and accessories and equipment for each of the rooms included in the scope of work of the contract.
2.4.12.1 Patient Wards
According to the new required layout there shall be 10 new patient wards, divided into large and small units. 5 large and 5 small patient wards will be the result of this project. Each patient ward shall have a bathroom inside, to be described in the following paragraph.
- Floors: Large porcelain gres stoneware as previously described
- Walls: All walls shall be perfectly leveled.
o Floor to 0.1-0.12 m: Provide porcelain gres stoneware wall base, from the same model as the floor tiles.
o 0.1-0.12 m to 1.50 m: Homogeneous linoleum wall wainscot. Minimum 1.2 millimeter thickness. Color and pattern to be selected by the beneficiary among ample selection to be provided by the contractor. Product to be specifically indicated by the manufacturer in their standard catalog for hospital use.
o 1.5 m to suspended ceiling: Plastered and paint with paint certified for hospital use (antibacterial)
- Wall openings/cabinets: As the result of providing new partitions, there shall be holes or openings along the walls that could be used for storage. The contract includes providing these areas with wood doors and internal shelves for storage. For estimating purposes, the contractor shall estimate a total of 20 m² of doors. These doors shall be light construction, typical for cabinets and storage areas.
- Ceiling: Suspended acoustical ceiling supported by galvanized metal structure, held from the true ceiling of the rooms, after removal of the existing false ceiling and repair of the true ceiling structure.
- Lighting: Rapid start fluorescent technology. Lighting levels are required. Provide 2 switches as follows:
o One circuit for one single lighting fixture for minimum lighting level
Existing patient ward to be reduced in size
Wall plaster to be removed and ornamental details restored to the maximum extent technically possible o One circuit for all lighting fixtures in the room to provide the illumination level required by the applicable Code.
- Electrical receptacles/plugs: To be recessed on the walls, similarly to the rest of the electrical installation. Provide along the walls at the exact location to be indicated by the Hospital Administration. Provide the following number of outlets:
o 12 in the large patient wards o 8 in the small patient wards
- Nurse call-in system: Provide 3 call-in switches on each patient ward, located where indicated by the Hospital Administration.
- Windows with blinds, radiators,…