Nov 2014 - Oct 2015

Solicitation N33191-14-R-1047
J-200000-4
Firm Fixed Price Form / Formulario precio fijo firme
P1P2P3P4P5P6
Address:Base Naval de Rota – Base Naval Rota (Cádiz)[kW][kW][kW][kW][kW][kW]
CUPS:ES0031102555053001GD0F16,00016,00016,00016,00016,00016,000
Voltage:66,000V
Tarifa de Acceso:6.2P1P2P3P4P5P6TOTAL
[kWh][kWh][kWh][kWh][kWh][kWh][kWh]
8,436,92911,095,4955,324,5298,815,43612,132,60661,972,379107,777,373
7.8%10.3%4.9%8.2%11.3%57.5%100.0%
Energy price / Termino de energiaoffer price / precio de oferta
P1 [€/MWh]P2 [€/MWh]P3 [€/MWh]P4 [€/MWh]P5 [€/MWh]P6 [€/MWh]
P1 €P2 €P3 €P4 €P5 €P6 €TOTAL €
- 0- 0- 0- 0- 0- 0- 0
Access rate / Tarifa de acceso (only linked to power demand / solo asociado al termino de potencia)
P1 [€/kW]P2 [€/kW]P3 [€/kW]P4 [€/kW]P5 [€/kW]P6 [€/kW]
22.15834811.0887638.1151348.1151348.1151343.702649
P1 €P2 €P3 €P4 €P5 €P6 €TOTAL €
POWER DEMAND COST / COSTE DE POTENCIA354,533.57177,420.21129,842.14129,842.14129,842.1459,242.38980,722.59
Access rate / Tarifa de acceso (only linked to energy / solo asociado al termino de energia)
Orden IET/107/2014 of January, 31st 2014P1 [€/MWh]P2 [€/MWh]P3 [€/MWh]P4 [€/MWh]P5 [€/MWh]P6 [€/MWh]
15.587011.64106.20403.08701.99301.2470
P1 €P2 €P3 €P4 €P5 €P6 €TOTAL €
131,506.41129,162.6533,033.3827,213.2524,180.2877,279.56422,375.53
Losses coficients in % of the energy consumed each time band / Coeficientes de pérdidas en % de la energía consumida en cada período
Real Decreto 216/2014 of March, 28thP1P2P3P4P5P6
Pérdidas de energía que están siendo facturadas como consecuencia de la entrada en vigor del RD arriba referenciado, el cual establece que las pérdidas medidas se asignarán en su totalidad a los comercializadores y consumidores directos en mercado.6.30%5.30%5.60%5.20%5.10%4.80%
Energy losses invoiced as a consequence of the new Law above specified, in which is stated that measured losses will be allocated entirely to marketers and market direct consumers
Other regulated rates / Otros costes regulados
Orden ITC/3353/2010 of December 28th 2010P1 [€/MWh]P2 [€/MWh]P3 [€/MWh]P4 [€/MWh]P5 [€/MWh]P6 [€/MWh]
Pagos por capacidad €/kWh13.63006.29104.19303.14503.1450- 0
Total Pagos por capacidad + pérdidas14.48876.62444.42783.30853.3054- 0
Pérdidas sobre los precios de la energía0.0000000.0000000.0000000.0000000.0000000.000000
Total Other regulated rates / Otros costes regulados14.48876.62444.42783.30853.3054- 0
Orden IET/107/2014 of January, 31st 2014P1 [€/MWh]P2 [€/MWh]P3 [€/MWh]P4 [€/MWh]P5 [€/MWh]P6 [€/MWh]
Operador del Sistema (OS)0.108650.108650.108650.108650.108650.10865
Operador del Sistema + Pérdidas (€/MWh)0.115490.114410.114730.114300.114190.11387
Total Costes permanentes0.115490.114410.114730.114300.114190.11387
Orden IET/107/2014 of January, 31st 2014P1 [€/MWh]P2 [€/MWh]P3 [€/MWh]P4 [€/MWh]P5 [€/MWh]P6 [€/MWh]
OMIE0.0248100.0248100.0248100.0248100.0248100.024810
OMIE + Pérdidas0.0263730.0261250.0261990.0261000.0260750.026001
P1 [€/MWh]P2 [€/MWh]P3 [€/MWh]P4 [€/MWh]P5 [€/MWh]P6 [€/MWh]
Total price invoiced / Precio total de facturacion
P1 [€/KWh]P2 [€/KWh]P3 [€/KWh]P4 [€/KWh]P5 [€/KWh]P6 [€/KWh]
P1 €P2 €P3 €P4 €P5 €P6 €TOTAL €
ESTIMATED ENERGY COST / COSTE ESTIMADO DE ENERGIA- 0
Total / TotalP1 [€/MWh]P2 [€/MWh]P3 [€/MWh]P4 [€/MWh]P5 [€/MWh]P6 [€/MWh]
P1 €P2 €P3 €P4 €P5 €P6 €TOTAL €
COSTE TOTAL ESTIMADO (POTENCIA + ENERGIA)- 0
€/MWh
- 0