Attachment 1 - Technical Specifications

View the file

Other files

File Type Posted
N33191-14-R-0614-0001.pdf PDF
N33191-14-R-0614_SOL.pdf PDF
Attachment_4_-_Submittal_Checklist.pdf PDF
Attachment_3_-_PPQ.pdf PDF
Attachment_2_-_Contract_Data_Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EUCOM Humanitarian Assistance Program

DESIGN AND BUILD NEW

KINDERGARTEN IN DEVESELU

Olt County, Romania

ID-22042

December 2013

Sean.Duffy Text Box Attachment 1 - Performance Technical Specification and Statement of Work

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 2 of 125 Version 002

1. TAXATION

This construction/renovation contract is exempt from VAT. The contractor is required to coordinate with the US Embassy and with competent Romanian authorities in order to obtain the VAT TAX EXEMPTION that applies to this contract. Contractor is required to make all necessary coordination and to allow for time for approval of the VAT Tax Exception.

2. PROJECT DESCRIPTION

THIS PROJECT IS FOR THE DESGIN AND CONSTRUCTION OF A NEW BUILDING. THE

CONTRACTOR SHALL PROVIDE A COPY OF CONSTRUCTION PERMITS TO BE PROVIDED BY THE

COMPETENT LOCAL AUTHORITIES BEFORE WORK IS AUTHORIZED TO START.

CONTRACTOR WILL COORDINATE WITH LOCAL AUTHORITIES AND WILL PROVIDE ALL REQUIRED

DOCUMENTATION IN ORDER TO OBTAIN THE CONSTRUCTION PERMIT THAT MAY BE REQUIRED

FOR THE SCOPE OF WORK INCLUDED IN THIS PROJECT. CONTRACTOR SHALL COORDINATE THE

PROCEDURES TO SUBMIT THE DOCUMENTATION TO THE MUNICIPALITY WITH COMPETENT

LOCAL AUTHORITIES.

THE CONTRACTOR SHALL VERIFY AND FOLLOW THE NECESSARY PROCEDURES TO SUBMIT THE

DESIGN PACKAGE IN ORDER TO OBTAIN THE CONSTRUCTION PERMIT FOR A NEW

CONSTRUCTION, WITHIN TWO PUBLIC PLOTS OF LAND, FUNDED BY A FOREIGN DONOR, AND TO

BECOME PUBLIC BUILDING.

GENERAL SCOPE OF WORK

The Work included under this contract includes the necessary designs and construction to build of a new facility to be used as the new Kindergarten in Deveselu. It is necessary that the bidders visit the construction site before they submit their bids in order to verify existing conditions.

The contractor’s work include, the following items of work:

- Obtain the Construction Permit from the competent Romanian Authority

- Demolish the existing facilities interfering with the new construction, including foundations

- Design and Build a new kindergarten as detailed in this document

- Design and construction of new fences (contract option-1)

Note: To show existing conditions of the plot of land, several pictures are included in this PTS. These pictures were taken in November 2011, March, May and December 2013. The pictures do not guarantee the existing conditions of the plots of land or existing facilities and vegetation at the time to prepare the bid for the contract, and they are only a tool to describe the responsibilities of the contractor. The contractor is responsible to visit the sites in order to measure and quantify the required work, as well as to verify the existing conditions, prior to the submission of their proposal.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 3 of 125 Version 002

2.1. Legal and Technical Requirements

The project execution is based on the following principles:

- Strict compliance with American Contracting Regulations, including the requirements of the Department of Defense, the US Navy and Naval Facilities Engineering Command

(NAVFAC).

- Strict compliance with Romanian Technical, Legal and Administrative requirements, which are applicable for a renovation project, as described in this PTS.

- Compliance with the most stringent of US and Romanian safety regulations.

- Compliance with technical requirements described in this document

2.2. Construction Permit or Authorization

The construction of a new building to be used as a kindergarten requires a full technical design, as required by Romanian regulations. The contractor shall obtain formal Construction Permit to perform the works included in the scope of work of this project from the competent Romanian authority.

The contractor is required, as part of this contract, to prepare all documentation, designs, reports, information, drawings, and everything that may be necessary as required by Romanian regulations, in order to obtain this Construction Permit.

Note that the construction will be performed in two contiguous plots of land.

2.3. Location of project

The project is located in Deveselu, within Olt County. All works are to be performed in the school plot of land and in the plot of land between the school and the church. Both plots of land are public.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 4 of 125 Version 002

Picture#02: Location of project site

Picture#01: Location of Deveselu District

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 5 of 125 Version 002

Picture#04: Approximate location of new Kindergarten

Picture#03: Approximate location of new kindergarten

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 6 of 125 Version 002

THIS IS A DESIGN-BUILD PROJECT

Design and build:

- New kindergarten

- New commemorative plaque

(paragraphs 3)

Design and build:

Exterior improvements

(Paragraph 4)

BASE-BID OPTION-1

2.4. Structure of the Contract

The contract includes the design and construction of the new Deveselu Kindergarten as detailed herein. The work is divided into Base-Bid and Contract Option-1. The Base-Bid is the minimum part of the project that will be awarded to a construction firm. The Option-1 will be awarded (or not) depending upon availability of funds, as well as other factors. The contractor shall provide a separate price for the Base-Bid and for the contract option, as required by the solicitation documents.

3. Detailed Description of the Scope of Work (Base-Bid)

This is a design-build contract. This means that this document describes the scope of work and the requirements for the new facility to be designed and build as part of this contract. The contractor shall prepare all necessary design projects and documents as required per Romanian regulations and obtain the necessary acceptance by the Contracting Officer and formal approval by the competent Romanian authorities before they can start work. This includes obtaining the formal Construction Permit by the competent Romanian authorities.

All work shall be designed and built in accordance with this Request for Proposal (RFP) and in compliance with Romanian Codes, and it shall include every item of construction necessary to provide a fully usable Kindergarten Facility. Design and construction shall strictly comply with applicable Romanian construction codes. All areas of the new building should be accessible by people with limited mobility (wheelchairs) from the main street. Exterior finishes of the facilities shall be visually similar to residential construction in the vicinity.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 7 of 125 Version 002

THE CONTRACTOR SHALL PROVIDE A COPY OF CONSTRUCTION PERMITS TO BE PROVIDED BY

THE CORRESPONDING LOCAL AUTHORITIES BEFORE WORK CAN START. CONTRACTOR WILL

COORDINATE WITH LOCAL AUTHORITIES AND WILL PROVIDE AND PROCESS ALL REQUIRED

DOCUMENTATION IN ORDER TO OBTAIN THE CONSTRUCTION PERMIT THAT MAY BE REQUIRED

FOR THE SCOPE OF WORK INCLUDED IN THIS PROJECT. THE FORMAT IN WHICH TO SUBMIT THE DESIGN PACKAGE, COORDINATION WITH UTILITY COMPANIES, DEFINITION OF THE ASSIGNER OF THE PROJECT, DETAILS OF DRAWINGS, CERTIFICATES FOR THE DESIGNERS, SIGNATURES, AND

OTHER BUREAUCRATIC PROCESSES SHALL BE AS REQUIRED BY THE ROMANIAN AUTHORITIES

WITH JURISDICTION OVER NEW CONSTRUCTION PROJECTS IN DEVESELU. IT IS THE

CONTRACTOR’S RESPONSIBILITY TO BE FAMILIAR WITH THE PROCEDURES WHICH ARE

NECESSARY IN ORDER TO OBTAIN THE CONSTRUCTION PERMIT.

3.1. DESIGN PHASE - GENERAL

Immediately after award, the contractor shall initiate the design phase, as outlined in this document, and as required by Romanian regulations.

The design shall be prepared in compliance with applicable Romanian construction codes, with Romanian Food Agency requirements, with Romanian Ministry of Education requirements and with applicable Urban Planning in Deveselu and construction practices in Romania and in the geographical area where Deveselu is located. The contractor shall hire the services of an architect licensed in Romania to design one facility to be used as the new Kindergarten for Deveselu, as detailed in this document. According to Romanian regulations, several design packages will be necessary. The contractor shall be familiar with the Administrative procedures which are necessary in order for the Municipality to be able to receive and accept the different submissions to obtain the necessary and required Construction Permit. The contractor’s final designs shall be signed, stamped and certified by the corresponding licensed architects or engineers in Romania, as required by Romanian regulations. Contractor to show proof that they have all required licenses for design and construction of the new kindergarten. All design documents shall be approved by the competent Municipal Government before its construction is authorized to start. The level of detail of the design (extent of specifications, number and size of drawings, number of separate designs, calculations, …) shall be sufficient to verify the compliance with the requirements of this contract and as required by the regulations of Romania and the corresponding Municipality.

The contractor shall hire the services of the necessary licensed professionals (architects, engineers) to design one complete and fully operational facility to be used as the new Kindergarten for Deveselu. These contract Performance Technical Specifications include the minimum requirements of each element of the facility, but it shall be the licensed professionals to provide the best layout and distribution, meeting these minimum requirements. The design of the facility shall be adequate for persons with limited mobility, specifically for people on wheelchairs, but only one toilet shall be rated for children with special needs. The licensed professional shall design an energy efficient facility, as detailed throughout this document

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 8 of 125 Version 002

3.2. GENERAL BASIS OF DESIGN

The licensed professionals hired by the contractor shall prepare the conceptual and the final complete design. It shall be the same professionals the ones preparing the conceptual design and the final design package to be submitted to the Municipality for approval and to provide the Construction Permit. The US Government includes in picture#5 a conceptual design that can be used by the contractor as a general rule to outline the minimum requirements included in this contract.

- The building shall be designed with concrete foundations, concrete superstructure, thermally insulated masonry walls and thermally insulated roofing with Romanian traditional flat ceramic roof tiles.

- Follow the seismic criteria applicable for this region of Romania.

- The facility shall have one single floor or level. The floor level shall be minimum 30 cm higher that surrounding grade elevation.

- All areas of the facility shall be accessible for people on wheelchair from the main street, except the mechanical room.

- Urban Planning requirements of the Municipality take precedence over the specific technical requirements of this document.

- The building shall include the following internal distribution:

No. Name of room or area Total usable area [m²]

1 Classroom 1 42 2 Classroom 2 42 3 Classroom 3 42 4 Kitchen 22 5 Kitchen storage 1 2 6 Kitchen storage 2 2 7 Janitor storage 2.25 8 Hallway 50.5 9 Gymnasium 46.5 10 Office 14.5 11 Boys Bathroom 24 12 Girls Bathroom 24 13 Staff Bathroom 4 14 Mechanical Room 10.5 15 Exterior Covered Patio 38

Total usable area (including the patio) 366.25

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 9 of 125 Version 002

Picture#05: Proposed conceptual design

INTERNAL DISTRIBUTION

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 10 of 125 Version 002

The definition of usable area or usable space is the area that is measured from wall surface to wall surface in each room, therefore not including the area occupied by the walls. The total built area is the total usable area plus the area occupied by the walls.

The architect hired by the contractor can make minor adjustments or variations to the required areas for each room not to exceed 20% of the minimum areas detailed above for each room.

However, the total usable area, including the covered patio, shall not be less than 366 m².

It is the intent of the project to keep the total usable area of the building at 366 m². If a particular room in the table in page 8 is not big enough for the intended use, the contractor’s architect shall design it with the necessary bigger surface as needed for the intended use, but deducting the additional required surface from other rooms in the building not requiring the area detailed in this table. For example, if the mechanical room, in order to fit the boiler and other equipment needs to be 12 m² instead of 10.5 m², the architect shall design it with 12 m², but the architect shall also design other rooms with a total of 1.5 m² smaller.

ALL AREAS OF THE KINDERGARTEN, SHALL BE ACCESSIBLE FOR PEOPLE ON

WHEELCHAIRS FROM THE MAIN STREET.

The exact location and external dimensions of the new construction shall be determined during the design phase of the contract.

Picture#03 and picture#04 shows the approximate location of the new kindergarten within the school plot of land and the adjacent one. Picture#6 shows more detailed location of the new building. The contractor shall coordinate the exact location of the kindergarten within 2 meters of the indicated location with the Municipality considering the minimum requirements outlined in this document for the kindergarten, the accesses to the kindergarten from the main street, and the Urban Planning requirements applicable for this area of Deveselu.

The Urban Planning requirements of this plots of land in Deveselu take precedence over the provided conceptual design and proposed location. The contractor shall design the new facility in strict compliance with Urban Planning and adjust the layout of the building in order to comply with the minimum requirements of the table shown in page 8.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 11 of 125 Version 002

Distribution Concept

Picture#05 provides a conceptual design that the contractor may propose to modify or improve, as recommended by the contractor’s design team, and as required by Romanian applicable regulations, with the requirements of the Ministry of Education, and with the Urban Planning requirements. The general philosophy in this concept design is to provide a facility with the following functions:

- ENTRACE FROM MAIN STREET: The facility shall have a pedestrian sidewalk or paved access from the main street to the main entrance of the building. This shall be designed to be used by people on wheelchair.

- PATIO: The building shall have a covered patio at the main entrance, covered by the same roof structure as the rest of the building.

- ORIENTATION: To maximize sun light into the building. Classrooms shall have windows oriented towards the South.

- SIDEWALKS: The building shall have 1 meter wide sidewalks around its perimeter partially covered by the eave of the roof.

- FACILITY EXTERIOR DOORS: The new construction shall have a minimum of 2 exterior doors. Follow Fire Protection Regulations for emergency escapes.

- LOBBY/ENTRANCE: Immediately after the main entrance door there shall be a lobby or entrance reception.

- HALLWAYS: To be minimum of 2 meters wide

- BATHROOMS: All with exterior windows

- KITCHEN: As far as possible from the areas used by the children, with exterior window.

- MECHANICAL ROOM AND STORAGE: Where less visible. Mechanical room should only have access from the exterior of the facility.

- WINDOWS: As necessary, to maximize the use of natural light and ventilation of the facility.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 12 of 125 Version 002

Picture#06: Required location for new Kindergarten. Drawing approximately to scale

3.3. EXACT LOCATION

The exact location shall be determined during the design phase of the project, but it shall be within 2 meters of the location indicated in picture#06 below.

3.4. DEMOLITIONS

The project includes the complete demolition of the existing storage facility located within the footprint of the new kindergarten. This construction is identified as “C2” in picture#04. This facility has asbestos containing corrugated roof sheets. The asbestos containing material shall be removed by the Municipality. The contractor shall notify the Municipality with a minimum of 2 weeks advance notice for the removal of the asbestos containing materials. This contract does not include any asbestos removal, handling or abatement. If during the performance of the works the contractor finds any material suspicious of containing material, they shall immediately notify the Municipality, and they will remove it.

The building to be removed has large basement, at least 1.8 meters deep. The contractor is responsible to demolish the building and to properly fill the space, in coordination with the foundations of the new facility. For estimating purposes, the contractor shall estimate that they shall fill the volume left by the removed construction with select fill, to be compacted in layers of maximum 30 centimeters. The design of the foundations of the new construction shall be coordinated with the results of the required geotechnical report of existing soils, but also with the procedure by which the contractor shall fill the volume left by the removed construction.

Trees: The contractor shall place the new building in order to minimize the removal of trees. If any trees interfere with the final agreed location of the new kindergarten, these trees shall be removed by the Municipality. The contractor shall be responsible to remove the roots and remaining organic matter under the footprint of the new kindergarten.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 13 of 125 Version 002

3.5. SPECIFIC CONSTRUCTION REQUIREMENTS

The licensed professional hired by the contractor shall design the facility with the requirements outlined in this document:

A person/child with disabilities shall be capable of accessing every single space of the facility with the exception of the mechanical room. One children bathroom (in the girls bathroom) shall be rated to be used by a child on wheelchair. The kindergarten staff (teachers) bathroom shall be rated for an adult on wheelchair.

The design shall be based upon the minimum required spaces described in this document. Only some specific details and quality of materials are included in this document. This is a design-build contract and therefore the contractor’s design team shall select the required materials and equipment based on their professional judgment, the requirements of this technical specifications and the requirements of the regulations of Romania. If any material or equipment is not specified herein, the contractor shall use commercial grade materials and equipment in compliance with Romanian Code. Find in the next paragraphs some of the requirements for each area of the new facility:

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 14 of 125 Version 002

3.5.1 General building requirements: The building shall be designed in strict compliance with the technical, sanitation, education and administrative regulations of Romania and it shall be especially designed for people and children with limited mobility.

Title Description Remarks

Structure Reinforced concrete The building shall be designed with reinforced concrete foundations and superstructure, reinforced concrete ceiling beams and deck, and with masonry brick exterior enclosure.

Floor elevation Raise floor elevation

Provide all floors of the facility all at the same elevation. At a minimum the facility floor shall be 0.3 meters above the average ground elevation of the surrounding areas. This is to avoid possibility of flooding.

Exterior building Rigid thermal insulation protected against impacts

Finishes similar to other similar new construction in the vicinity. 8 cm thickness of thermal insulation with protective wall as specified in this document.

Roof Complete new traditional flat ceramic tiled roofing system.

Sloped hip new complete roofing with traditional flat ceramic tiles, a minimum 0.8 m eave and R-30 thermal insulation immediately under the roof (not on the floor). Provide finished roof with 30 degrees (57.73% slope). Provide PVC coated aluminum downspouts and gutters over access areas only.

Roof Area under the roof

The area under the roof shall be accessible by a ladder from the main hallway. This area shall be provided with exposed concrete floor and shall be accessible through a hatch in order to be used as general storage. Provide lighting with the switch located near the hatch entrance.

Ceiling

- Suspended ceiling

- Gypsum board

- Exposed concrete

All rooms to be provided with the required ceiling, as required by this document. HEIGHT of ceiling from the finished floor surface shall be

2.80 meters in all areas except the hallways and gymnasium where the height of the ceiling shall be 3.00 meters.

Perimeter of houses

Sidewalks Provide 1 meter wide concrete sidewalk around the new construction.

Provide proper joints and sealant to avoid humidity inside the facility.

Slope the sidewalks away from the facility with minimum 2% slope.

Building access Ramp and stairs

Provide main entrance to the facility from the street rated for children with disabilities, provided with ramp with proper slope (<8%) and stainless steel guardrails. Steps to be specifically designed to be used in stairways. The use of corner protection for the steps is not authorized.

Electrical Power Outlets Provide 2 outdoor 220 V outlets in the exterior wall of the building where indicated by the beneficiary. Provide at 1 meter high and with a heavy duty cover.

Electrical Exterior lighting Provide LED technology new lighting equipment with a minimum protection of IP 54 for all entrances. Lights to be controlled by a switch and motion detection sensor.

Electrical Roof lighting protection As required by Romanian Code

Fire protection Fire protection installation Provide Fire detection and extinguishing system as required by Romanian Code.

Heating Wood Fired boiler To be provided by a central boiler installed in the mechanical room.

Provide all required accessories (pump, expansion tank, valves, distribution manifold, …)

Kitchen fuel Storage of gas cylinders

Provide a cabinet or other suitable storage place to store and connect propane cylinders, as required by Romanian regulation for storage of inflammable gases. Install outside of the facility. This cabinet or storage area shall have capacity for a minimum of 2 Romanian standard propane gas cylinders.

Air Conditioning Provide air conditioning for certain areas

Provide A/C capable of maintaining 22 degrees Celsius in the summer for the classrooms, gymnasium and office. Provide inverter technology heat pump.

General utilities Water and electricity Follow utility company requirements. Provide underground utility installation to connect the new facility with the utility network (water, electricity, telephone, …)

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 15 of 125 Version 002

3.5.2 Classrooms: There shall be 3 classrooms. The finishes required for all 3 rooms shall be similar.

Wall Plastered and paint.

Washable paint the lowest 1.2 meters. Colors and patters to be selected by the beneficiary.

Floor Homogeneous linoleum Homogeneous linoleum. 2 mm thickness.

Combination of 2 colors.

Ceiling Finish Acoustical suspended, “Armstrong” type ceiling.

White color. At 2.80 meters from finished floor elevation.

Interior Doors Solid wood door.

Factory manufactured door of minimum thickness 4 cm with factory installed mortise lockset. Provide lock and handles of stainless steel. Provide a window in the top part of the door with glazing of minimum thickness 6 mm.

Electrical Power Outlets Provide 4 units, 220 V outlets per room.

Electrical Lighting

Fluorescent rapid start lighting with diffuser to reduce glare. Provide 1 lighting circuits to provide 300-500 lux. Provide energy efficient lighting equipment. Provide lighting fixtures recessed within the new drop ceiling.

Electrical Conduits All conduits to be recessed within the masonry work. No conduits to be exposed.

Specialty Air conditioning Provide split type inverter technology heat pump (ceiling mounted).

Heating Hot water aluminum radiators

To provide a minimum temperature of 22 degrees Celsius in design winter conditions. All radiators to be protected to avoid any possibility of burns to the users.

Specialty Blackboard Provide one white type blackboard (erasable type) with 10 erasable markers each. Each blackboard to be minimum of 2 m².

Windows 5 chambered PCV double glazing windows (4-16-4)

Provide windows to the outside. Use commercial grade windows. 50% of windows to be operational.

Provide window blinds.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 16 of 125 Version 002

3.5.3 Kitchen: Design in accordance with Romanian Sanitation and Food Administration regulations. The description below is an estimation. The architect shall design the required areas in order to have a perfectly operational kitchen facility.

Floor Finish Ceramic floor tile Provide ceramic gres flooring using tiles of minimum size 40x40 cm.

Slope towards the new floor drain.

Wall Ceramic wall tile

Colors and patterns to be selected by user. Provide ceramic tiles of minimum size 20x30 cm, from the floor to the ceiling with decorative friso on the middle and top (metal or ceramic). All vertical surfaces shall be covered with ceramic tiles.

Ceiling Finish Plaster and paint gypsum board White color. Gypsum to be “green” type, rated for humid atmospheres.

Place at 2.8 meters from finished floor elevation.

Access Access hallway The width of the access hallway shall be minimum 1.2 meters.

Interior Doors Solid Wood door.

Factory manufactured door of minimum thickness 4 cm with factory installed mortise lockset. Provide lock and handles of stainless steel.

Door Hardware Locksets and Hinges Installed by manufacturer of the doors.

Electrical Power Outlets Provide minimum of 10 power outlets in the kitchen. Receptacles in the kitchen area shall be located as designed by the contractor’s design team.

Electrical Lighting

Fluorescent rapid start lighting with washable diffuser to reduce glare recessed within the new gypsum board ceiling surface. Provide 2 separate lighting circuits to provide high or low lighting levels in the kitchen. Provide energy efficient lighting fixtures rated to be used in areas with humid atmospheres.

Electrical Conduits All conduits to be recessed within the masonry work. No conduits to be exposed.

Windows 5 chambered PCV double glazing windows (4-16-4)

Provide windows to the outside. Use commercial grade windows with panels opening vertically and horizontally. Provide integral insect screen.

Specialty Sinks

Provide 1 stainless steel sink recessed in the new artificial stone countertop. Provide with 2 basins and 1 drying area. See conceptual design for general requirements. Provide the sinks with one industrial faucet with hot and cold water.

Specialty Countertops

Provide 5 linear meters of countertop. The countertops shall be made of artificial stone with rounded edges made or quartz. Use of Formica is not authorized. Design the dimensions of the countertops as required by Romanian sanitary regulations and as recommended by the contractor’s design team.

Specialty Exhaust/hood/ventilation

Design a complete ventilation system for the kitchen to take the fumes to the exterior of the building in strict compliance with applicable Romanian sanitation regulations. The new system shall include 2 separate and independent systems: a hood over the hot kitchen stove, and an exhaust from the highest air volume of the room. Systems shall be designed so that they can be easily maintained and cleaned.

The systems shall include a forced industrial ventilation system.

Specialty Stove and Oven

The contractor shall provide an integral industrial type oven and stove, with 4 burners and 1 oven (see pictures). Equipment to be stainless steel and fueled by propane. Route propane gas lines to the exterior of the building, to a special storage cabinet for the compressed combustible gas cylinders to be provided under this contract.

Specialty Furniture Provide standard kitchen furniture under the new countertop (5 linear meters), plus 2 linear meters of wall mounted kitchen cabinetry.

Heating Hot water aluminum radiators To provide a minimum temperature of 22 degrees Celsius in design winter conditions.

Specialty Equipment (NOT UNDER THIS

CONTRACT)

This contract does not include providing microwaves, refrigerator, freezer, washing machine or other kitchen equipment. However, the contractor shall coordinate their design for the future installation of this equipment.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 17 of 125 Version 002

3.5.4 Kitchen Storage: There shall be 2 storage room connected with the kitchen. Each room shall be provided with:

Floor Finish Ceramic Similar to the kitchen flooring

Wall Plaster and paint Color to be selected by the user.

Ceiling Finish Gypsum board or “Armstrong” type suspended ceiling White color.

Interior Doors Solid Wood Doors.

Factory manufactured doors provided without bottom thresholds.

Door Hardware Locksets and Hinges Installed by manufacturer of the doors.

Electrical Power Outlets Provide 1 outlets in each room.

Electrical Lighting

Fluorescent recessed rapid start lighting with diffuser to reduce glare. Provide 1 lighting circuits to provide 100 lux in each room. Provide energy efficient lighting equipment.

Electrical Conduits All conduits to be recessed within the masonry work. No conduits to be exposed.

Specialty Shelves

Provide metal shelves from the floor to the ceiling on longest wall on each room. Shelves to be 0.4 meters deep, with separate shelves every 0,4 meters in height.

Heating Heating Not required in these rooms

Windows Windows Not necessary for these rooms

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 18 of 125 Version 002

3.5.5 Janitor Storage: This room shall have a door to the main hallway, and shall not be connected with the kitchen:

Floor Finish Ceramic Similar to the kitchen flooring. Provide floor drain.

Specialty Floor drain Provide new floor drain

Wall Plaster and paint Color to be selected by the user.

Ceiling Finish Gypsum board or “Armstrong” type suspended ceiling White color.

Interior Doors Solid Wood Doors.

Factory manufactured doors provided without bottom thresholds.

Door Hardware Locksets and Hinges Installed by manufacturer of the doors.

Electrical Power Outlets Not necessary for this room.

Electrical Lighting

Fluorescent recessed rapid start lighting with diffuser to reduce glare. Provide 1 lighting circuits to provide 100 lux in each room. Provide energy efficient lighting equipment.

Electrical Conduits All conduits to be recessed within the masonry work. No conduits to be exposed.

Specialty Shelves

Provide metal shelves from the floor to the ceiling on shortest wall on each room. Shelves to be 0.4 meters deep, with separate shelves every 0,4 meters in height.

Specialty Water faucet Provide one water faucet to fill in the water buckets to clean the kindergarten.

Heating Heating Not required in these rooms

Windows Windows Not necessary for these rooms

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 19 of 125 Version 002

3.5.6 Hallway and Common areas: (surface, location and shapes to be determined by the designer). The facility shall be designed with the required corridors, entrance lobby and other common areas. The area of these spaces shall be determined by the designer of the facility, but they shall meet the minimum requirements of Romanian regulations for this type of public buildings.

Wall Ceramic tiles on lowest 1.5 meters

Provide ceramic tiles on the lowest 1.5 meters and plastered and paint walls from 1.5 meters to the new ceiling surface. Provide combination of 2 different colors for the ceramic tiles. Color and patters to be selected by the beneficiary.

Corridors / Hallways

Width The minimum width of any hallway or corridor shall be 2 meters.

Floor Ceramic Similar to the kitchen flooring.

Ceiling Finish Acoustical suspended, “Armstrong” type ceiling.

White color. At 3.00 meters from finished floor elevation.

Interior Doors As specified for each particular room.

In general, slid wood the internal doors and PVC the bathroom and the exterior doors. Factory manufactured door provided without bottom thresholds. Provide with factory installed locks, hinges and accessories.

Exterior Doors PVC with thermal insulation and double glazing on the upper half of the doors.

Provide with anti-panic hardware as required by Romanian regulations. 8 mm minimum thickness for each pane of glazing. Provide with factory installed locks, hinges and accessories.

Exterior Doors Emergency Panic Hardware Use panic hardware where required by Romanian Code for this type of public building.

Main entrance door

Number of doors

The conceptual design provided under this contract only includes one main entrance door connected with the covered patio. It was noticed that most public buildings have double set of entrance door to maintain the internal temperature. If double set of doors are required by Romanian regulations, the contractor shall install double set of doors.

Electrical Power Outlets Provide one 220V outlet for every 12 linear meters of wall where indicated by beneficiary.

Electrical Lighting

Fluorescent rapid start lighting. Provide lighting circuits as required to provide 100-200 lux. In these common areas. Provide energy efficient lighting equipment. Lighting fixtures to be recessed on suspended ceiling surfaces.

Electrical Electric panels Install main electric panel in the entrance lobby, recessed on the wall.

Electrical Conduits All conduits to be recessed within the masonry work. No conduits to be exposed.

Heating Hot water aluminum radiators

To provide a minimum temperature of 22 degrees Celsius in design winter conditions. All radiators to be protected to avoid any possibility of burns to the users.

Windows 5 chambered PCV double glazing windows (4-16-4) Not required for these areas.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 20 of 125 Version 002

3.5.7 Gymnasium: There shall be one large diaphanous (without columns) gymnasium.

Wall Hard wood wainscot 1.5 meters high.

Plaster and paint the rest.

Color and patters to be selected by the user.

Wainscot of natural solid hard wood. Homogeneous linoleum on the walls is also authorized.

Floor Homogeneous linoleum Provide 2 mm thickness homogeneous linoleum with combination of 5 to 6 colors to provide finished floor drawing.

Ceiling Finish Plastered concrete White color at 3.00 meters height from floor elevation. The ceiling surface shall be designed to resist the impact of balls and other objects.

Interior Doors Solid wood door.

Factory manufactured door of minimum thickness 4 cm with factory installed mortise lockset. Provide lock and handles of stainless steel. Provide a window in the top part of the door with dimensions of 10x40 cm and with single glazing of minimum thickness 10 mm.

Electrical Power Outlets Provide 4 units, 220 V outlets, where indicated by the beneficiary.

Electrical Lighting

LED technology wall mounted flood lights. Provide total of 4 floodlights of 50 watts each. Provide 2 separate lighting circuits with 2 independent switches.

Electrical Conduits All conduits to be recessed within the masonry work. No conduits to be exposed.

Specialty TV signal

Provide the antenna, the amplifier, cables and receptacles in order to have TV signal in the gymnasium. TV equipment is not part of the contract, but the user shall be able to connect an existing TV to the new power and antenna receptacles.

Specialty Air conditioning Provide split type inverter technology heat pump with wall mounted interior unit.

Heating Hot water aluminum radiators

To provide a minimum temperature of 22 degrees Celsius in design winter conditions. All radiators to be protected to avoid any possibility of burns to the users.

Windows 5 chambered PCV double glazing windows (4-16-4)

Provide windows to the outside. Use commercial grade windows. Provide with physical protection against the impacts of the balls and other objects that children may use in this area. Protection to be provided by metal bars or nylon nets, sized for the size of a tennis ball.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 21 of 125 Version 002

3.5.8 Office: There shall be 1 office.

Wall Plastered and paint.

Washable paint the lowest 1.2 meters. Colors and patters to be selected by the beneficiary.

Floor Homogeneous linoleum Homogeneous linoleum. 2 mm thickness.

Combination of 2 colors.

Ceiling Finish Acoustical suspended, “Armstrong” type ceiling.

White color. At 2.80 meters from finished floor elevation.

Interior Doors Solid wood door.

Factory manufactured door of minimum thickness 4 cm with factory installed mortise lockset. Provide lock and handles of stainless steel.

Electrical Power Outlets Provide 4 units, 220 V outlets.

Electrical Lighting

Fluorescent rapid start lighting with diffuser to reduce glare. Provide 1 lighting circuits to provide 300-500 lux. Provide energy efficient lighting equipment. Provide lighting fixtures recessed within the new drop/suspended ceiling.

Electrical Conduits All conduits to be recessed within the masonry work. No conduits to be exposed.

Specialty Air conditioning Provide split type inverter technology heat pump (wall mounted).

Heating Hot water aluminum radiators

To provide a minimum temperature of 22 degrees Celsius in design winter conditions. All radiators to be protected to avoid any possibility of burns to the users.

Specialty Telephone

Provide telephone line pre-installation. The installation shall comply with the technical requirements of the local telephone company. The project includes conduits and cables up to the point of connection with the telephone company. Actual connection with the telephone company to be coordinated by the Municipality.

Windows 5 chambered PCV double glazing windows (4-16-4)

Provide windows to the outside. Use commercial grade windows. 50% of windows to be operational.

Provide window blinds.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 22 of 125 Version 002

3.5.9 Bathrooms: There shall be 3 bathrooms: Boys bathroom, girls’ bathroom and staff WC.

Design Privacy and supervision Design the bathrooms to provide the children with privacy, but at the same time to be able to be supervised by the kindergarten staff.

Wall Ceramic wall tile Colors and patterns to be selected by user. Provide ceramic tiles from the floor to the ceiling with decorative friso (metal or ceramic) on the middle and ceramic on the top. Protect ALL corners with metal edge protectors.

Floor Finish Ceramic floor tile Provide non-slippery commercial grade grès ceramic floor tiles. Provide special pieces to avoid sharp angles and for easy maintenance.

Ceiling Finish Plaster and paint gypsum board White color. Gypsum to be “green” type, rated for humid atmospheres.

Provide with the required access hatches.

Interior Doors PVC doors Factory manufactured door. No thresholds to allow easy movement of wheelchair and ventilation. Same color as solid wood doors provided for remaining rooms.

Door Hardware Locksets and Hinges As recommended by the manufacturer for bathroom use. High-frequency hinges shall be utilized, installed by manufacturer.

Electrical Power Outlets Do not provide power outlets in the bathrooms.

Electrical Lighting

Recessed fluorescent rapid start lighting with diffuser to reduce glare.

Provide 2 lighting circuits, one for 100-200 lux, and another one for 500- 700 lux in the mirror in the hand-washing area. Provide energy efficient lighting equipment. Provide lighting equipment rated for use in humid spaces. Provide switches at proper height for wheelchair access.

Electrical Conduits All cables to be installed under conduit. All conduits to be recessed within the masonry work. No conduits to be exposed.

Boys’ Bathroom Specific elements

(NOT HANDICAPPED RATED)

The boy’s bathroom shall be provided with:

- Two kindergarten rated toilet seat (European standard)

- One window to the exterior, provided with operational panel

(horizontal and vertical) , non transparent glazing 4-16-4, and insect screen.

- Two sinks over continuous artificial stone countertop.

- Mirror recessed on the wall over sinks.

- Premanufactured aluminum toilet partitions, designed for kindergartens.

Girls’ Bathroom

(HANDICAPPED RATED)

The girls’ bathroom shall be provided with:

- Designed to be used for people with limited mobility

(wheelchairs), including one European standard toilet.

- Stainless steel bars in one toilet, and other accessories as required for full use of the bathroom for people on wheelchair.

- Window, sinks, mirrors and partitions similar to the boys bathroom.

Staff bathroom

(HANDICAPPED RATED)

The hand-washing area shall be provided with:

- 1 wall mounted sink

- 1 European standard toilet with stainless steel bars for use by people on wheelchair

- One mirror, recessed within the wall tiles, covering all the area in front of the sinks and surrounded by friso.

- 1 stainless steel automatic hand driers, hardwired to the walls, so that the cables are not exposed to the view.

- Floor drain. Provide ceramic floors sloped towards a floor drain.

Hot Water Hot and cold water All bathrooms shall be provided with cold and hot water in the sinks.

Specialty Ventilation No need to provide forced ventilation, as all bathrooms shall have windows to the exterior.

Specialty Accessories Provide all required accessories made of stainless steel, to have a fully operational bathroom such as toilet paper holder, soap dispenser, towel holder, hook behind doors, mirror, boys and girls signs, etc.

Heating Hot water aluminum radiators To provide a minimum temperature of 22 degrees Celsius in worst winter conditions. All radiators to be protected to avoid any possibility of burns to the users.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 23 of 125 Version 002

3.5.10 Mechanical Room: There shall be 1 mechanical room to be used as mechanical room. This room shall be used for the heating boiler (wood fired), the domestic hot water heater, and all pumps, filters, pressure relief valves, expansion tanks, and remaining required accessories. Size and distribution of the mechanical room to be designed by the contractor’s design team, following recommendations of this contract specifications and as needed to fit the equipment to be installed in this room.

Wall Plaster and paint White

Floor Finish Concrete Painted and sloped towards a floor drain

Ceiling Finish Plaster and paint White color.

Door Metal door Factory manufactured door made of galvanized metal, with ample louvers for ventilation. Paint finish.

Door Hardware Locksets and Hinges Provide lockable door.

Electrical Power Outlets Provide 6 protected 220V outlets for use in outdoor locations.

Electrical Lighting Fluorescent lighting. Provide 1 lighting circuits to provide 200-300 lux. Provide energy efficient lighting equipment.

Electrical Conduits Exposed metal conduits.

Heating Heating Radiators not required in this room. Boiler to be installed in this room.

Windows Window If required by the designer, provide aluminum framed windows. Window not recommended.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 24 of 125 Version 002

3.5.11 Covered Exterior Patio:

Wall Plaster and paint These are exterior walls, and therefore they shall be similar to the rest of exterior walls of the building.

Floor Finish Ceramic tiles Provide non slippery ceramic tiles, of minimum size 40x40 cm and recommended by the manufacturer for exterior use

Steps Ceramic tiles

Provide special grès ceramic tiles for the steps, specifically designed for such use. The use of corner protection on regular floor ceramic tiles is not authorized in the steps.

Ceiling Finish Plaster and paint White color.

Electrical Lighting LED lighting. Minimum 50 watts. Rated for exterior use. Provided with switch and motion detection.

Electrical Conduits All electrical installation to be recessed within the walls and ceiling.

Railing Provide stainless steel railing Provide all areas around the covered patio with railing. Provide railing along the access ramp and entrance steps.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 25 of 125 Version 002

3.6. SPECIFIC TECHNICAL REQUIREMENTS

The design shall be based upon the requirements described in previous paragraphs. If any installation, equipment or material is not specified in this section, but it is required for the proper operation of the facility, the contractor shall consider this installation to be part of the contract, and they shall use commercial grade materials and equipment in compliance with Romanian Code and common construction practice. Find within this paragraph some of the specific requirements and clarifications for the new facility and areas to be developed.

3.4.1 ROOF

The contract includes the design and construction of a ceramic tiled roof using traditional Romanian flat ceramic roof tiles, and including the following elements:

- A. Ceramic tiles. Use traditional flat ceramic tiles.

- B. Asphalt sheet, to be used as vapor barrier, and to be installed as recommended by the manufacturer.

- C. Solid support for asphalt sheet. Material, sizes and thickness to be designed by the architect hired by the contractor.

- D. Thermal insulation. Minimum 15 centimeters thickness. Material to be selected by the architect hired by the contractor. Installation of the thermal insulation on the floor is not authorized.

- E. New treated wood secondary structure. Size, location and quantity to be designed by the architect hired by the contractor.

- F. Solid Support for Thermal Insulation. Material and sizes to be designed by the architect hired by the contractor.

- G. New primary Structure.

Picture#07: Typical roofing system

A. Ceramic tiles – Flat traditional

B. Asphalt sheet

D. Thermal insulation (min15cm)

E. New Treated Secondary Structure

C. Solid support for asphalt sheet

F. Solid support for thermal insulation

G. New Primary Structure to be treated

A B C D E F G

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 26 of 125 Version 002

Picture#8: Typical proposed ceramic tiles for the roof

For this reason, the contractor shall:

- Perform a design for the new roof. This design shall be properly certified as required by Romanian regulations.

- The slope of the new roof shall be the minimum of 30 degrees (57.73% slope).

- Design and provide a minimum of 6 windows or dormers on the new roof. Provide for ventilation of the roof and for esthetics of the building, but provide with metal screens to avoid birds from getting inside the roof when windows are opened.

- Provide an eave (or roof overhang) of minimum 0.8 meters wide.

- Provide new roof structure (wood or metal). Any wood to be used shall be treated against fire and termites.

- Provide new traditional flat ceramic roof tiles. Similar to the ones in pictures #8 or #12.

- Provide vapor barrier under the new roof system.

- Provide new thermal insulation (minimum R-30) under the roof, properly supported by solid cover, consisting of minimum 15 cm thick thermal insulation. Do not install the thermal insulation on the floor, as this area shall be designed for general storage of the kindergarten.

- Provide snow stops, provided by the manufacturer of the ceramic tiles.

- Install a lighting protection for the roof in strict compliance with applicable Romanian

Electric Code, if required, given the existence of higher buildings in the area. Provide a new grounding system (<5Ω).

- Provide new gutters and downspouts. Use non ferrous material, of cooper, PVC or PVC coated aluminum. Do not provide around the perimeter of the roof, but only along the kindergarten access areas.

- Provide area under the new roof to be used for general storage. Floor of the area under the roof shall be concrete.

- Provide electrical lighting under the roof. Due to the limited and restricted use of this area, incandescent lighting system is authorized. Switch to be located on the roof, within 20 centimeters of the roof hatch.

- Provide a 10 year written warranty against any water infiltration or evidence of humidity in the ceilings of the building. Warranty letter shall be provided from the contractor to the Municipality with a copy to the Contracting Officer.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 27 of 125 Version 002

Picture#11: Typical required finish of the inside of the roof (if wood support structure is selected). Thermal insulation to be covered and supported by solid cover.

Area under the roof to be similar to this one, with finished concrete floor to be used as storage and therefore resistant to loads.

Picture#10: Definition of roof eave.

Picture#09: Typical roof thermal insulation support installation

Picture#12: Typical Romanian traditional flat ceramic roof tiles, with ornamental dormers.

Design and Build New Kindergarten in Deveselu Olt County (Romania)

Page 28 of 125 Version 002

Picture#15: Typical installation of thermal facade

Picture#14: Typical installation of thermal facade

Picture#13: Typical finish of lowest part of protective wall.

3.4.2 THERMAL FACADE

Contractor shall provide a new thermal façade system protected against impacts in all exterior walls of the facility.

The new thermal façade system shall include:

- Rigid thermal insulation panels, minimum of 8 cm thickness, properly attached to the façade, in accordance with manufacturer’s recommendations. Follow Romanian Fire Code.