Amendment_0001.pdf
PDF 89 KB Posted
- Attached to
- RENOVATE BELL KINDERGARTEN, HASKOVO, BULGARIA
- Solicitation number
- N33191-14-R-0604
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Performance_Technical_Specification_Revised.pdf | ||
| Amendment_0002.pdf | ||
| Attachment_1_-_Performance_Technical_Specification.pdf | ||
| N33191-14-R-0604.pdf | ||
| Attachment_3_-_PPQ.doc | DOC document | |
| Attachment_2_-_Contract_Data_Sheet.doc | DOC document | |
| Attachment_4_-_Submittal_Checklist.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N33191-14-R-0604 RENOVATE BELL KINDERGARTEN, HASKOVO, BULGARIA
Amendment 0001 continues on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Apr-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N33191-14-R-0604
X 9B. DATED (SEE ITEM 11)
21-Mar-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Apr-2014
CODE
NAVFAC EUROPE AFRICA SOUTHWEST ASIA
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N33191-14-R-0604
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
PRE-PROPOSAL INQUIRIES
The following Pre-proposal Inquiries are answered:
1. The Technical specifications indicate in 3.1.9. WATER PIPING AND INSTALLATION that it is the purpose of this project to bring new water lines from the nearest water supply point within the public plot of land, but outside of the kindergarten building. Please specify the location of the connection within the public plot of land.
Answer: This is a design-build contract, and therefore the contractor shall select the nearest water connection point from within the plot of land. This project requires bringing new water lines to the renovated areas, immediately after the water meter of the kindergarten. The water meter shall not be removed and or altered as part of this contract. Replacement of the water meter, or providing a second water meter is not required.
The project includes providing new isolation water valves to separate the renovated areas from the areas not under the scope of work. The contract includes removing from the building the water lines to be replaced with new ones, and properly capping the existing lines to remain in use. The internal diameter of the water lines shall be the necessary so that there is no visual drop in pressure when opening one faucet, or all faucets while flushing the toilets. Once the project is completed, the water line installation for the renovated areas from the water meter shall be in strict compliance with all applicable Bulgarian regulations.
2. Point 3.1.7. INTERNAL DOORS, Picture#9: Internal walls to be renovated: Please confirm that the PVC doors are indicated in blue on the picture #9 and the wood doors are indicated in green color.
Answer: There is a mistake in the contract specifications:
- Only one solid hard wood (oak) is required per group. This corresponds to the entrance door to each group, or to the one in green in the upper section of the drawing in picture#09.
- All other doors, indicated in blue, and the one indicated in green to enter the kitchenette shall be PVC, provided by the same manufacturer as the internal PVC windows indicated in red in the drawing in picture#09.
3. Point 3.1.13.1. KITCHEN, Industrial Sinks: This is to be provided in 3 of the 4 kitchenettes. Please indicate the name of the Group where the industrial sinks will not be provided.
Answer: It corresponds to these sinks:
N33191-14-R-0604
SECTION 00010 - SOLICITATION CONTRACT FORM
Time is changed from:
Time = Central European Time (CET)
To:
Time = Central European Summer Time (CEST)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .