This document is a U.S. Coast Guard Computerized Maintenance System (CMS) form (WPB-87, N33005.D, Revision 05/15/23) used to record scheduled and unscheduled maintenance performed on Coast Guard aircraft and surface assets.
The form documents the inspection of a contractor fire system (CMS Code N33005, CEINUM P1-B000-001) and requires completion by authorized Coast Guard personnel or contractor maintenance personnel. Key data fields include asset number, operating activity, maintenance accomplished date with asset hours, and maintenance due date with asset hours. The form captures whether maintenance was scheduled or unscheduled, identifies any discrepancies found, and documents man-hours expended by technician type (MK, DC, EM, ET, IT, GM, BM, FN, SN, ME, and other). Technician signature and ID are required, and Quality Assurance (QA) review is mandatory as indicated by asterisks. The maintenance procedure involves preliminary steps including equipment lockout/tagout per COMDTINST 9077.1, verification that an authorized marine fire extinguishing system inspector performs the work, installation of a new 360-degree fusible link (P/N: 302810), verification of contractor test completion, CO2 cylinder hydrostatic test date checks with Condition Finding Documentation (CFD) requirements, and compliance verification of CO2 discharge hoses. The form requires notification of the Engineer Petty Officer (EPO) if QA findings are unsatisfactory and completion of appropriate sign-off with pertinent remarks. References include DC MPC documents R-S-1570, R-S-1646, R-S-8844, MPC M00060.0, and COMDTINST 9077.1 (series).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PIKE_SOW_Revised.docx | DOCX document | |
| Smart Matrix Acquisition.GOV.pdf | ||
| PIKE_SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. COAST GUARD
COMPUTERIZED MAINTENANCE SYSTEM
WPB-87
N33005.D
REV'D 05/15/23
ASSET NUMBER OPERATING ACTIVITY MAINTENANCE ACCOMPLISHED MAINTENANCE DUE
DATE ASSET HOURS DATE ASSET HOURS
MO DAY YEAR MO DAY YEAR
ZULU DATE ZULU TIME
MO DAY YEAR
ITEM 1
DUE
CMS CODE ACTION DESCRIPTION CEINUM
N33005 INSPECT CONTRACTOR FIRE SYSTEM P1-B000-001
SCHEDULED UNSCHEDULED
DISCREPANCIES FOUND: NO_____ YES_____
MAN HOURS: MK___.___DC___.___EM___.___ET___.___IT___.___GM___.___BM___.___FN___.___SN___.___ME___.___OTHER___.___
IF DISCREPANCIES ARE FOUND REMARKS ARE REQUIRED
TECHNICIAN'S
SIGNATURE
TECHNICIAN'S
ID
* ASTERISK INDICATES QA REQUIRED *QA (2)
REFERENCES:
DC MPC R-S-1570
DC MPC R-S-1646
DC MPC R-S-8844
REVIEWED
BY
LOG YN DATA
ENTRY
COMPLETED
Distribution Statement D: Distribution authorized to the DHS/CG/DoD and their contractors Administrative/Operational use, 04/27/23. Other requests shall be referred to the appropriate asset product line.
WARNING: This document contains technical data whose export is restricted by the Arms Export-Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5200.22-M, National Industrial Security Program Operating Manual, Section 5-705 or DoD 5200.1-R, Information Security Program Regulation, Chapter VI, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
PRIVACY ACT STATEMENT
Authority: 44 U.S.C. 3101; 44 U.S.C. 3534; 5 U.S.C. §552a (e)(3); and Executive Order 9397.
Purpose: To account for scheduled and unscheduled maintenance performed on CG aircraft and surface assets.
Routine Uses: Authorized CG personnel will use this information to document scheduled and unscheduled maintenance, man-hours expended, and the technician respon-sible for tasks performed on CG aircraft and surface assets. Any external disclosures of data within this record will be made in accordance with DHS/ALL-004, General Information Technology Access Account Records, 77 Federal Register 70792, November 27, 2012.
Disclosure: Furnishing your Tech ID is voluntary; however, the inability to collect this information could result in untimely or incomplete Asset Computerized Maintenance System reports or the inability for the CG to make informed decisions regarding manpower analysis.
WPB-87
N33005.D
REV'D 05/15/23
ASSET NUMBER OPERATING ACTIVITY MAINTENANCE ACCOMPLISHED MAINTENANCE DUE
DATE ASSET HOURS DATE ASSET HOURS
MO DAY YEAR MO DAY YEAR
FIRST/LAST NAME: ______________________ TECH ID/TH: ________/________
FIRST/LAST NAME: ______________________ TECH ID/TH: ________/________
REVIEWED
BY
LOG YN DATA
ENTRY
COMPLETED
DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document. Page 2 of 4
WPB-87
N33005.D
REV'D 05/15/23
1 TRACTOR FIRE SYSTEM INSPECT
REFERENCES:
COMDTINST 9077.1 (series) Equipment Lockout/Tags-Plus Instruction
MPC M00060.0
TOOLS/TESTEQUIPMENT:
NONE
EXPENDABLES:
NONE
CONSUMABLES:
Link, Fusible, Fire, P/N: 302810, CAGE: 05646, NIIN: 004433526
A PRELIMINARY STEPS
WARNING
VARIOUS STEPS IN THIS PROCEDURE EMPLOY ITEMS ON
THE HAZARDOUS MATERIALS LIST. BEFORE EXECUTING
THIS MPC, REFER TO THE APPLICABLE MSDS/SDS FOR
FULL SAFETY AND HANDLING PROCEDURES.
NOTE: EPOs shall submit service request through their Sector EO to the SFLC Asset Manager inbox 60 days prior to required due date for annual inspection. Asset Managers will forward properly submitted service request to the cutter’s APM. APM will complete PR for ser-vice and unit will receive notification from SK when purchase order is complete and unit may schedule service.
NOTE: This MPC is completed by a Depot repair activity or requires Depot level assistance.
1. Contact the Product Line to schedule Depot level work.
2. Complete this procedure in conjunction with CO2 cylinder test delay and cables while contractor is on site.
WARNING
ENSURE EQUIPMENT IS PROPERLY TAGGED OUT. FAILURE
TO COMPLY MAY RESULT IN SERIOUS PERSONAL INJURY
OR DEATH.
3. Complete Equipment Lockout/Tags-Plus Process IAW COMDTINST 9077.1 (series).
DESTRUCTION NOTICE - Destroy by any method that the document. Page 3 of 4
WPB-87
N33005.D
REV'D 05/15/23
WARNING
AVOID EYE CONTACT, SKIN CONTACT, AND INHALATION
WITH GAS. USE IN A WELL VENTILATED AREA. ENSURE
CYLINDER IS SECURE. FAILURE TO COMPLY MAY RESULT
IN SERIOUS PERSONAL INJURY.
NOTE: Ensure that the company who performs maintenance on this system is an authorized marine fire extinguishing system inspector.
4. Check that a new 360 degree fusible link, P/N: 302810, is provided to or by the contractor and installed during this test procedure.
5. Verify that the contractor completes all required tests.
* QA REQUIRED (1)
6. Check the CO2 cylinders for hydrostatic test dates.
a. Write a CFD in the Electronic Asset Logbook (EAL) if the hydrostatic test date is within 12 months of being due.
* QA REQUIRED (2)
7. Check that the following hoses are in compliance:
a. CO2 cylinder inboard discharge hose MPC M00060.0 (CMS Code M00062).
b. CO2 cylinder outboard discharge hose MPC M00060.0 (CMS Code M00063).
(1) Notify the Engineer Petty Officer (EPO) if the above QAs are unsatisfactory.
8. Reconnect necessary Operating Components and Remove Lockout/Tags-plus Material and Hardware IAW COMDTINST 9077.1 (series).
9. Restore equipment to its normal condition of readiness.
10. Notify EO, EPO, or Supervisor of any discrepancies, repairs, or future actions.
11. Record maintenance action by completing appropriate sign-off and adding pertinent remarks.