PWS REV 2 as of 17 Dec 2025.pdf
PDF 511 KB Posted
- Attached to
- Dismantle Wall and Jib Cranes
- Solicitation number
- N3225326Q0019
About this file
This Performance Work Statement (PWS) details a contract requirement for the Pearl Harbor Naval Shipyard (PHNSY & IMF) to remove and dismantle four (4) Shepard Niles 5-ton wall cranes and three (3) jib cranes. The cranes, manufactured in 1941 and now 84 years old, are no longer in service, having been replaced by newer equipment. The removal effort exceeds the current resource capacity of the shipyard's production shops.
The contractor must provide a project manager to oversee the removal, dismantling, and palletizing of the specified cranes, with a total estimated weight of 25,000 lbs per wall crane (excluding trolley) and additional weight for the trolleys. The project requires a comprehensive removal plan detailing lifting configurations, center of gravity, laydown areas, and crane operations. Critical considerations include handling hazardous materials like lead paint and asbestos, adhering to safety protocols, obtaining necessary security clearances, and performing the work on-site at Pearl Harbor Naval Shipyard within the Controlled Industrial Area (CIA). The contractor must also submit environmental and safety plans, provide all necessary equipment and personnel, and ensure proper disposal of crane components.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
PEARL HARBOR NAVAL SHIPYARD (PHNSY & IMF)
REMOVAL AND DISMANTLE OF 4 WALL CRANES & 3 JIB CRANES
1.0 BACKGROUND
The primary mission of PHNSY & IMF is to deliver regional maintenance, at the depot and intermediate levels, to keep the surface ships and submarines of our nation's navy "Fit to
Fight." As Hawaii’s regional maintenance center, capabilities include excellence in overhauling, repairing, converting, alteration, refurbishing, and decommissioning of Navy vessels.
2.0 OBJECTIVE & SCOPE
2.1 PHNSY & IMF requires a contractor to remove and dismantle four (4) Shepard Niles 5 ton wall cranes (See Figures 1 and 2) and three (3) jib cranes. The wall cranes were manufactured in 1941 (84 years old) and are no longer in service as replacement cranes were previously procured and installed. This equipment removal effort is beyond the current resource capacity of PHNYS & IMF’s production shops.
3.0 PERFORMANCE REQUIREMENTS
3.1 REMOVAL OF CRANES: The contractor shall provide one individual as a Project
Manager who is responsible for the planning, scheduling and managing the execution of all aspects of the work required. The contractor shall remove, dismantle and palletize four (4) wall cranes (155-462, 155-463, 155-465, 155-466) and three (3) jib cranes (155-3, 155-7, and 155-8) based on the removal plan as stated in paragraph 3.2. Contractor cranes used on the base shall follow the requirements in Appendix IV. Horizontal lifelines may need to be slackened or removed to facilitate removal of the cranes. Whether it needs to be slackened or removed, Contractor shall notify Code 900F.33.
3.2 REMOVAL PLAN: The contractor shall submit a Removal Plan to rig and crane off the four (4) wall cranes and three (3) jib cranes as part of the Contractor’s proposal and bid submittal. The estimated weight of each wall crane (without trolley) is 25,000 lbs. The estimated weight of each trolley is 5,000 lbs. Contractor is responsible for palletizing the wall crane in preparation for transportation. The crane contains hazardous materials such as lead paint, asbestos wires and oil in the gear boxes. Proper control of hazardous materials is required per Appendix II of paragraph 13.0. Lifting and lowering of the crane shall be considered a critical lift and shall comply with the requirements of Appendix IV of paragraph 13.0. Rigging by choking or sweeping using synthetic products, is not allowed unless approved by the
Shipyard. Tilting of lifted or suspended load during removal when it is necessary shall only be performed using a chain-fall, ratchet hoists or similar equipment, and only done in a controlled manner following shipyard approval. The plan shall include as a minimum, lifting configurations, center of gravity of the lifted load, laydown area, overhead interference and mobile crane hook height requirements. The Removal Plan must be approved by the Government prior to removing the cranes.
4.0 PERFORMANCE REQUIREMENTS
4.1 The Contractor shall provide all labor, supervision, tools, design, transportation and machinery to remove, dismantle and palletize four (4) wall cranes and three (3) jib cranes.
4.2 The contractor shall provide one individual as a Project Manager who is responsible for the planning, scheduling and managing the execution of all aspects of the work required.
4.3 Prior to commencing work, the contractor shall meet in conference with the government
Technical Point of Contact (TPOC), Contracting Officer’s Representative (COR) and necessary support personnel to discuss and develop mutual understandings relative to safety, environmental, security, schedule and waste management.
4.4 The contractor shall present an Environmental Protection Plan (EPP) as part of the
Contractor’s proposal and bid submittal. APPENDIX I and II in paragraph 13.0, outline the various elements that shall be addressed, for the presence of hazardous material, including lead and asbestos, and environmental mitigation efforts, including nuisance dust control and other steps to be taken to minimize or prevent damage to adjoining structures, on-going PHNSY &
IMF operations and injury to personnel working in the vicinity. Once accepted by the
Government, the EPP shall become an integral part of the requirements of this PWS.
4.5 The contractor shall provide a Safety Plan as part of the Contractor’s proposal and bid submittal covering all aspects of safety for this project. All work performed shall be in accordance with applicable Federal, State of Hawaii and OSHA requirements.
4.6 The contractor shall provide all material handling and lifting equipment, rigging support services, and other support equipment (such as cranes, forklifts, Bobcats, man-lifts, etc.)
necessary for continuous support and shall provide qualified personnel to operate it. The contractor shall comply with PHNSY crane requirements per APPENDIX III.
4.7 The contractor shall be responsible for the removal and dismantle of the four (4) wall cranes and three (3) jib cranes as listed in paragraph 3.1. The disposal of scrap materials within PHNSY & IMF is strictly prohibited. Dismantled crane parts/pieces need to be placed on pallets or dunnage (no larger than 8’ x 40’) outside in an approved area determined by the
TPOC for transportation.
4.8 Rags, paper and other debris generated shall be removed and the work site shall be returned to a clean and orderly state.
5.0 SERVICE DELIVERY SUMMARY
Performance Requirement PWS
Paragraph
Performance Threshold
1. Provide Safety Plan Paragraph 4.5 100% delivery and compliance.
2. Provide Contractor Crane Entry
Package
Paragraph 4.6 100% delivery and compliance.
3. Completely remove and dismantle items listed in the PWS.
Paragraph 3.1 100% delivery and compliance.
4. Secure and stage disassembled equipment components and peripherals on dunnage or pallets.
Paragraph 4.7 100% delivery and compliance.
5. Perform clean up and prepare site as specified in the PWS.
Paragraph 4.8 100% delivery and compliance.
6.0 GOVERNMENT PROVIDED UTILITIES AND SERVICE
6.1 Utilities: If available, the use of electrical wall outlets is allowed. Any damage that results from exceeding the rated circuit capacity shall be borne by the Contractor.
7.0 QUALITY CONTROL PLAN
7.1 The contractor shall develop a Quality Control Plan (QCP) and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's QCP is the means by which the contractor assures that work complies with the requirement of the contract.
7.2 The contractor shall maintain records of reviews and actions taken per the QCP, and shall make such records available to the government upon request.
7.3 The contractor shall be available for informational meeting with the government TPOC to discuss the direction, progress, results and/or issues that occur during the period of performance of this contract.
8.0 CONTRACTOR QUALIFICATIONS
8.1 The Contractor shall provide qualified equipment operators to perform all aspects of this work.
8.2 The Contractor shall provide trained personnel fully capable of providing the deliverables requested and have the knowledge, skills, and expertise to meet the requirements specified in this PWS.
8.3 The Contractor shall comply with Safety and Health work practices specified in Appendix
I of paragraph 13.0.
8.4 The Contractor shall comply with environmental guidelines specified in Appendix II in paragraph 13.0.
8.5 The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management. The contractor must maintain continuity between TPOC and the
COR. The contractor shall provide a project manager who shall be responsible for the performance and quality of meeting the requirements of this PWS. The project manager or alternate shall have full authority to act on behalf of the contractor on all contract matters relating to operations of this contract.
9.0 SECURITY REQUIREMENTS
9.1 The Contractor personnel must comply with Security requirements to obtain unescorted entry, green badge, to PHNSY&IMF areas. Escorted access to Controlled Nuclear Information
Areas (CNIAs) and Nuclear Work Areas (NWAs) must be coordinated with the cognizant
Department Security Coordinator to ensure that the area is sanitized and the escort is properly briefed/knowledgeable of the area. The Contractor must follow the applicable requirements listed below in paragraph 13.0 ATTACHMENTS Appendix III and brief their personnel to ensure compliance. Non-compliance with applicable items in Attachments is a material violation of the contract. Should Contractor personnel receive or suspect they have learned unauthorized sensitive information, they must identify and immediately report suspicions to the COR.
9.2 The contractor shall pass a background check and register with the Defense Biometric
Identification System (DBIDS) to gain access to Pearl Harbor Naval Shipyard & Intermediate
Maintenance Facility (PHNSY&IMF). Only those individuals with favorable investigations shall be utilized on this contract.
9.3 The contractor must coordinate with PHNSY&IMF to obtain base entry at building 3455
Pass Office. It is not unusual for the pass process to take an hour or more. Contractor must be a U.S. Citizen and must pass a security background check. Only those individuals with favorable investigations must be utilized on this contract. After receiving award, to ensure all contractors assigned to the contract receives base access, the Contractor must complete
SECNAV 5512/1 (latest version) for each personnel with their full name; Social Security number; date of birth, place of birth, and citizenship.
9.4 The contractor must meet the requirements to obtain a valid Controlled Industrial Area
(CIA) vehicle pass. The PHNSY&IMF CIA vehicle passes are issued by the PHNSY&IMF Pass and ID Office. PHNSY&IMF CIA vehicle passes will not be issued unless proof of vehicle registration to the contractor’s company has been presented to the Shipyard & IMF Pass and ID
Office.
10.0 CONTRACTOR PERSONNEL
10.1 All contract personnel attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Each contractor employee will clearly identify themselves as contractor employees by means of company shirt, pin, or other visible company identification means in a manner that is visible at all times. Shipyard security badges will be worn at all times.
11.0 PLACE OF PERFORMANCE
11.1 The place of performance is on-site at Pearl Harbor Naval Shipyard, inside the CIA .
12.0 BUSINESS HOURS AND HOLIDAYS
12.1 PHNSY & IMF operates 24 hours per day. However, most PHNSY & IMF administrators work 0630 to 1500 hours Monday through Friday, and do not work on Federal holidays. Federal
Holidays are listed below:
New Year’s Day 1st of January
Dr. Martin Luther King’s Birthday 3rd Monday in January
Washington’s Birthday 3rd Monday in February
Memorial Day 4th or 5th Monday in May
Juneteenth 19th of June
Independence Day 4th of July
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veterans Day 11th of November
Thanksgiving Day 4th Thursday in November
Christmas Day 25th of December
12.2 If a holiday falls on a Saturday, the holiday is observed on the preceding Friday. If a holiday falls on a Sunday, the holiday is observed on the following Monday.
13.0 ATTACHMENTS
APPENDIX I – SAFETY AND HEALTH WORK PRACTICES FOR CONTRACTORS WORKING
WITH PEARL HARBOR NAVAL SHIPYARD AND INTERMEDIATE MAINTENANCE FACILITY
(PHNSY&IMF). REVISED JULY 2024
APPENDIX II – ENVIRONMENTAL PROTECTION GUIDELINES FOR CONTRACTORS ON
FACILITIES PROJECTS AT PEARL HARBOR NAVAL SHIPYARD & INTERMEDIATE
MAINTENANCE FACILITY. REVISED OCTOBER 16, 2019
APPENDIX III – CONTRACTOR SECURITY REQUIREMENTS FOR PHNSY&IMF’S
CONTROLLED INDUSTRIAL AREA, SECURITY ISLANDS, CONTROLLED NUCLEAR
INFORMATION AREAS, NUCLEAR WORK AREAS AND/OR OTHER SENSITIVE AREAS
(REV. MAY 2024)
APPENDIX IV – CONTRACTOR CRANES ON BASE (REV. NOVEMBER 4, 2024)
Figure 1: Wall Cranes 155-465 and 155-466
Figure 2: Shepard Niles Wall Crane Drawing
Note: For the idle wheels, looking at the side view (figure on right), the top wheels make contact with the building rail to its right and the bottom wheels make contact with the building rail to its left due to the weight of the boom section (horizontal section).