This is a Questions and Answers (Q&A) document for a Navy solicitation (N32253-2-Q-0007) issued by Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) for non-hazardous polyethylene and rubber removal services.
The Navy will provide material loading into contractor-supplied roll-off bins; contractors must provide two 40-yard roll-offs with squared-off bottoms to maximize packing space. Steel-reinforced hoses must be kept separate from other rubber materials in a dedicated bin. Material should be transported off-site for cutting or metal removal if required for disposal, rather than processed at the shipyard. The Prime contractor must hold a Hawaii Department of Health (DOH) Solid Waste Management Permit and all associated permits directly; this requirement cannot be delegated to subcontractors or disposal facilities. H-POWER can serve as a primary or backup disposal facility for accepted materials; if H-POWER and preferred vendors cannot accept hoses, the contractor may utilize third-party disposal facilities. The contractor should demonstrate a comprehensive understanding of disposal processes and requirements for the materials involved. The deadline for submitting questions was 11/10/2026 at 8:00 AM Hawaii Standard Time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHNSY & IMF: N32253
Solicitation – N32253-2-Q-0007
Non-hazardous Polyethlyne and Rubber
Removal
RESPONSES TO QUESTIONS (11/10/2026)
1. Question: Will the Navy load the contractor’s roll-off bins, or should we include labor to load the material? If the Navy loads the bins, will steel-reinforced hoses be kept separate or mixed with the other material?
Response: Yes, Navy will load the bins that the contractors will provide us. We would like to have 2 bins to keep the steel-reinforced hoses separate from the other rubber.
2. Question: If the hoses need cutting or metal removal before disposal, can that work be done at the shipyard before loading, or must we haul the material off-site for processing? If on-site work is allowed, will a work area be provided?
Response: We would like to turn in the bins with the hoses uncut and have the contractor take it off yard to cut if the hoses are required to be cut for disposal.
3. Question: Can a hauling contractor bid as the prime using third-party disposal facilities? Does the prime need to hold the Hawaiʻi DOH Solid Waste Management Permit directly, and can H-POWER qualify as a primary or backup facility for material it accepts?
Response: TPOC is unsure who the third-party disposal facilities are? The Prime contractor should have a good understanding of the disposal process and requirements for HPWR and PVT. H-Power can be used as a primary and backup facility for materials they will accept. If PVT and HPWR will not take the hoses…yes, we would like to have the contractor use a third-party disposal facility.
4. Question: PWS 6.1 requires the Contractor to hold a Hawaii DOH Solid Waste Management Permit.
Would the requirement be met if the permit is held by our transportation/disposal subcontractor and the disposal facility, rather than by the prime contractor?
Response: The Prime contractor shall hold Hawaii DOH Solid Waste Management and all associated
Permits.
5. Is there a preferred bin or dump trailer type and size, and how many bins should be kept on site at any one time?
Response: The customer would like 2ea. 40 yard rolloffs. The smaller sizes lose packing space due to a u shape in the trailer rather than a squared off bottom.
6. Is there a deadline for questions, and has any amendment been issued?
Response: Questions are due by 11/10/2026 8:00 AM HST.