P0004.pdf
PDF 190 KB Posted
- Attached to
- Barge Repair and Preservation Work Federal contract opportunity
- Solicitation number
- N32253-16-T-0016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N32253-16-T-0016_0005.pdf | ||
| N32253-16-T-0016_0003.pdf | ||
| N32253-16-T-0016_0002.pdf | ||
| N32253-16-T-0016_0001.pdf | ||
| Attachment_3_-_OSHCTRMOA.doc | DOC document | |
| Attachment_5_-_099-01_thru_07_2010_with_FOUO_pages_removed.pdf | ||
| Attachment_7_-_Foreign_Interest_Determination_questionaire_5531-1_10-13_(rev_2).pdf | ||
| Attachment_6_-_INSTRUCTIONS_FOR_COMPLETION_OF_THE_FID_20160407.docx | DOCX document | |
| Attachment_8_-_JB2_FORM_0-180__-BLANK-1_August_2011_Daily_Pass_Valid_for_30_Days_Only.docx | DOCX document | |
| Attachment_2_-_Environmental_Guide_for_Ktr_on_Ship_Projects.pdf | ||
| Attachment_4-_099-010P.DOC | DOC document | |
| N32253-16-T-0016.pdf | ||
| Attachment_1_-_YRBM-32_509-16_Package.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions received.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N32253-16-T-0016
X 9B. DATED (SEE ITEM 11)
10-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jun-2016
CODE
PEARL HARBOR NAVAL SHIPYARD & IMF
667 SAFEGUARD ST., STE. 100 CODE 410.2
JBPHH HI 96860-5033
N32253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N32253-16-T-0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Answers to questions received for work item 637-11-001:
Question 8: Paragraph 3.1.1.1 of the work item specification requires the contractor to replace 400 linear feet of damaged overhead false ceiling framing, and the mounting of all overhead and perimeter support frame work appendages to structural supports in the same locations. Is this for the new 400 linear feet or for all? How is it to be attached? Is there any example to follow?
Answer 8: As identified in paragraph 3.1.1 of the work item specification, a total of 400 linear feet of horizontal grid work framing for the overhead panels shall be replaced as identified by the Government and attached in a similar fashion as those in the surrounding area. In addition, all support frame work appendages that were attached to any panel shall be mounted to structural supports by means of welding and or riveting. Contractors shall ensure that the appendages are in its original location and are able to uphold its structural integrity.
Question 9: Paragraph 3.1.2 requires the contractor to grind smooth weld remnants down to existing structure.
Will this put the grinder in contact with “hot” paint?
Answer 9: The contractor is required to test any paint prior to removal and is also required in paragraph 3.1.2.1 of the work item specification to conduct a total of 500 SF of paint abatement in the repair area as stated in 1.2 of the work item specification.
Question 10: Paragraph.3.1.2.1 of the work item specification requires a total of 500 SF of paint abatement in way of repairs. How should the contractor bid on this requirement? Is it 10 each 50 sf containments, 50 each 10 sf containments or 500 each 1 sf removals?
Answer 10: The contractor shall assume one (1) SF X 500 spots.
Question 11: Paragraph 3.2.1 requires the contractor to replace 500 linear feet of fiberglass bounding angle. Will this work item specification also require welding/paint removal?
Answer 11: This bounding angle is 1" x 2” and should be installed in accordance with the drawings which require the toe of the 1” leg to be tack welded to the bulkhead and the 2" leg to be welded to hold back the insulation.
However, the contractor may propose another means of installation via condition found report (CFR) to exclude any welding.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .