Attachment_1_-_YRBM-32_509-16_Package.pdf

PDF 439 KB Posted

Attached to
Barge Repair and Preservation Work Federal contract opportunity
Solicitation number
N32253-16-T-0016
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Specification Number SSPH-509-16

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

HRMC (NMD)

YRBM 32 (YRBM 13204)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SSPH-509-16

INCLUDES ALL CHANGES THROUGH 5/24/2016

INDEX

SHIP: YRBM 32 (YRBM 13204) SSPH-509-16

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-17 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 07/18/2014

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014

009-03 Toxic and Hazardous Substances; control 07/18/2014

009-04 Quality Management System; provide 07/18/2014

009-05 Temporary Accesses; provide 07/18/2014

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

07/18/2014

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/18/2014

009-08 Fire Protection at Contractor's Facility; accomplish 07/18/2014

009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014

009-18 Magnetic Material; control 07/18/2014

009-19 Provisioning Technical Documentation (PTD); provide 07/18/2014

009-20 Government Property; control 07/18/2014

009-21 Logistics and Technical Data; provide 07/18/2014

009-23 Interferences; remove and install 07/18/2014

009-24 Shipboard Authorization, Control, Isolation, Blanking, and Tagging Requirements;

accomplish

07/10/2015

009-28 Fire Prevention Requirements; accomplish 06/10/2014

009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

07/18/2014

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide

07/19/2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

07/18/2014

009-59 Organotin Antifouling Material; control 07/29/2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

09/01/2015

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014

009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011

009-67 Integrated Total Ship Testing; manage 07/18/2014

009-69 Heavy Weather/Mooring Plan; provide 07/18/2014

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

07/18/2014

009-72 Physical Security at Private Contractor's Facility; accomplish 07/18/2014

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 07/18/2014

009-74 Occupational, Safety and Health Requirements; accomplish 07/10/2015

009-77 Cofferdam Requirements; accomplish 07/18/2014

009-79 Government Owned Material (GOM); status reporting 07/18/2014

ITEM_NO. TITLE DATE

009-80 Ship's Facilities; provide 07/18/2014

009-81 Compartment Closeout; accomplish 07/18/2014

009-82 Data Requirements When Installing an Equal Component Vice Specified Component;

provide

07/29/2011

009-83 Wire Rope Fitting Verfication; provide 01/17/2013

009-84 Accountability of Temporary Fasteners; provide 07/18/2014

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

08/01/2008

009-87 Chemical disinfection Procedures; accomplish 07/18/2014

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

07/18/2014

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

07/29/2011

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

07/18/2014

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

009-99 Ship Departure Report; provide 07/18/2014

009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/18/2014

009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 07/18/2014

009-102 Alteration Verification; provide 07/29/2011

009-103 Weight and Moment Change Data; provide 07/18/2014

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

07/18/2014

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

07/18/2014

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/18/2014

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

07/18/2014

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/18/2014

009-118 CG Deck Loading; accomplish 07/18/2014

009-120 Fact Finding and Critique of Unplanned Events; manage 07/18/2014

009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014

ITEM NO. TITLE

Hazardous Waste Produced on Naval Vessels; control077-11-001

Furnishings; repair613-11-001

Cosmetic Polymeric (PRC) Deck Coverings; complete replacement634-12-001

Panels; remove637-11-001

Mold Inspection; accomplish637-11-002

SHIP:

YRBM 32 (YRBM 13204) ITEM NO: 077-11-001

COAR: 28 PCN: PE16-A002

CMP: NONE

PLANNER: DEFRIES, JACOB

SSP: SSPH-509-16 1 of 5 ITEM NO: 077-11-001

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as

YRBM 32 (YRBM 13204)

SSP: SSPH-509-16 2 of 5 ITEM NO: 077-11-001 hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

SSP: SSPH-509-16 3 of 5 ITEM NO: 077-11-001

Cleaning Solvents _____ ____________ __________

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________ __________

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Rust Preventative)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic) _____ ____________ __________

Paints (Enamel, Latex, _____ ____________ __________

Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ __________ cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ __________ lead, chromium)

Sludges (Contaminated with _____ ____________ __ a known hazardous waste)

Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)

Lube/Fuel Oil Soaked Rags _____ ____________ __________

Paint/Flakes (Pressure Washing _____ ____________ __________

Ext Hull Surfaces)

Fuel Oil(Residual) _____ ____________ __________

SSP: SSPH-509-16 4 of 5 ITEM NO: 077-11-001

Bilge Water _____ ____________ __________

Oil/Water _____ ____________ __________

AFFF/Water _____ ____________ __________

MEK Contaminated Rags _____ ____________ __________

3.5.1 Provide zero dollars for managing and disposing of all

hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.

3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed

SSP: SSPH-509-16 5 of 5 ITEM NO: 077-11-001 the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

YRBM 32 (YRBM 13204) ITEM NO: 613-11-001

COAR: 28 PCN: PE16-L006

PE16-A005

CMP: NONE

PLANNER: UPCHURCH, IKAIKA

SSP: SSPH-509-16 1 of 2 ITEM NO: 613-11-001

1. SCOPE:

1.1 Title: Furnishings; repair

1.2 Location of Work:

1.2.1 Officers Ward Room (02-9-1-L)

1.2.2 XO SR & Office (02-8-1-Q)

1.2.3 CO SR & Office (02-1-1-L)

1.2.4 Office Complex No.12 (02-8-1-Q)

1.2.5 CPO Lounge (02-4-2-L))

1.2.6 CMC Office (1-15-1-Q))

1.3 Identification:

1.3.1 Quantity (One EA), Conference Table

1.3.2 Quantity (3 EA), 2-Drawer Wood File Cabinet

1.3.3 Quantity (2 EA), Standing Wood Wardrobe

1.3.4 Quantity (2 EA), Wood Desk with Student Light and Hutch

1.3.5 Quantity (One EA), Butcher Block Love Seat

1.3.6 Quantity (One EA), Butcher Block Lounge Seat

1.3.7 Quantity (One EA), Butcher Block-Coffee Table

1.3.8 Quantity (One EA), Round Table

1.3.9 Quantity (One EA), Wood Hutch

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 YRBM-32 Wood Furniture Damage List, Spreadsheet

2.3 SSPC Painting Manual Volume 2, Systems and Specifications

2.4 631-5478303 Rev D, Paint Schedule

3. REQUIREMENTS:

3.1 Accomplish a visual inspection of each wooden and metal furnishing throughout the YRBM-32 for structural integrity, deterioration, cracks and areas of damage or distortion using 2.2 for guidance.

3.1.1 Submit one legible copy, in hard copy or electronic media, of a report listing the results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Accomplish the repair and removal of all deteriorated table tops, legs, foundation, and deteriorated bottom portion for all items listed in

1.3 from the spaces listed in 1.2, using 2.2 to identify specific locations for each wood furnishing.

3.2.1 All items listed in 1.3 shall have deteriorated areas removed

SHIP: YRBM 32 (YRBM 13204)

SSP: SSPH-509-16 2 of 2 ITEM NO: 613-11-001 and replaced with new ply wood.

3.2.1.1 Template work from existing for exact dimensions and

configuration.

3.2.2 Accomplish the requirements of 009-37 of 2.1 for wood work repairs to the items listed in 1.3.

3.2.2.1 Procure and install new hardware similar to existing for all wood repairs for final assembly.

3.3 Accomplish the requirements of SSPC-SP3 of 2.3 to the bottom 6 -inch of all metal furniture throughout the YRBM-32 and preserve using similar colors as the existing condition using 2.4 for guidance.

(V)(G) "VISUAL INSPECTION "

3.4 Accomplish a visual inspection to ensure all repairs and

installation is complete.

(V)(G) "OPERATIONAL TEST"

3.4.1 Accomplish an operational test of all drawers and doors repaired and or disturbed in 3.2. Cycle equipment a minimum of four times to prove correct locking operation.

3.4.1.1 Drawers shall slide and extend to its fullest extent

without rubbing or binding.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Rain water had previously entered the YRBM-32 through the 03 level deck causing interior flooding and water damage to its furniture.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

YRBM 32 (YRBM 13204) ITEM NO: 634-12-001

COAR: 28 PCN: PE16-A003

CMP: NONE

PLANNER: DEFRIES, JACOB

SSP: SSPH-509-16 1 of 2 ITEM NO: 634-12-001

1. SCOPE:

1.1 Title: Cosmetic Polymeric (PRC) Deck Coverings; complete replacement

1.2 Location of Work:

1.2.1 Main Deck

1.2.2 01 Level

1.2.3 02 Level

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY-17)

3. REQUIREMENTS:

3.1 Accomplish the removal of all perimeter false bulkhead panels throughout the spaces listed in 1.2.

3.1.1 Accomplish removal of existing channels on decking. Chip and grind surfaces flush and smooth in way of removals.

3.2 Accomplish the requirements of 009-26 of 2.1, including Attachment C, paragraphs A to E, for the complete installation of all interior decks, including PRC on existing bulkheads and newly exposed areas behind false bulkheads throughout spaces listed in 1.2.

3.2.1 New PRC decking base coat and color chips shall be of similar color sequence as existing.

3.2.2 Do not remove equipment and furnitures that are welded to the deck to accomplish PRC deck renewal.

3.2.3 Aggregate shall be used in all Sanitary Spaces, Galley, Scullery and within 6 feet of all Ladders and Watertight Doors.

3.3 Accomplish the requirements of 009-32 of 2.1 for all new and disturbed surfaces.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: SSPH-509-16 2 of 2 ITEM NO: 634-12-001

YRBM 32 (YRBM 13204) ITEM NO: 637-11-001

COAR: 28 PCN: PE16-A004

CSWT FILE NO: 637-004 CMP: NONE

REVISED: 16 Dec 2015 PLANNER: UPCHURCH, IKAIKA

SSP: SSPH-509-16 1 of 3 ITEM NO: 637-11-001

1. SCOPE:

1.1 Title: Panels; remove

1.2 Location of Work:

1.2.1 Main Deck, Entire Interior

1.2.2 01 Level, Entire Interior

1.2.3 02 Level, Entire Interior

1.2.4 Hold Level, Entire Interior

1.3 Identification:

1.3.1 Quantity: (One EA), Galley Power Panel, 450V, 3PH (See Item 10 of 2.15)

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 635-5478309 Rev E, Compartment Insulation

2.3 637-5478311 Rev H, Overhead Sheeting - Main Deck

2.4 637-5478312 Rev D, Overhead Sheeting - 01 Level

2.5 637-5478313 Rev C, Overhead Sheeting - 02 Level

2.6 640-5478317 Rev E, Joiner Arrangement - Main Deck

2.7 640-5478318 Rev F, Joiner Arrangement - 01 Level

2.8 640-5478319 Rev D, Joiner Arrangement - 02 Level

2.9 640-5478315 Rev D, Furniture List

2.10 801-5478327 Rev A, General Arrangement Hold, Main Deck & 01 Level

2.11 801-5478328 Rev A, General Arrangement 02 Level & Above

2.12 SSPC Painting Manual Volume 2, Systems and Specifications

2.13 302-7646649, HVAC Power Mods Incdt Hold Upgr

2.14 320-5478240 Rev F, Electrical-Single Line Diagram

2.15 320-5478241 Rev E, Power System Hold and Main Deck

2.16 320-5478242 Rev B, Power System - 01 Level and Above

2.17 330-5478247 Rev I, Lighting Hold

2.18 330-5478248 Rev E, Lighting - 01 Level

2.19 330-5478333 Rev E, Lighting - Main Deck

2.20 330-5478334 Rev D, Lighting - 02 Level

2.21 29 CFR Part 1915, Occupational Safety and Health Standards for

Shipyard Employment

3. REQUIREMENTS:

3.1 Remove and scrap all interior perimeter bulkhead panel assemblies, SSP: SSPH-509-16 2 of 3 ITEM NO: 637-11-001 overhead false ceiling panel tiles, and all un-faced fiberglass insulation exposed by this removal in areas listed in 1.2.

3.1.1 Retain existing horizontal gridwork in each space listed in 1.2.

3.1.1.1 Replace 400 linear feet of damaged overhead false

ceiling framing and mount all overhead and perimeter support frame work appendages to structural supports in its same locations using 2.3 through 2.8 as guidance.

3.1.2 Grind smooth all weld and remnants from the bulkhead panel assembly removal down to the existing structure.

3.1.2.1 Accomplish the requirements of 2.21 to conduct a total of 500 square feet of paint abatement in way of repairs located in 1.2.

3.2 Accomplish the requirements of 009-11 for the installation of new TYPE 12 Faced insulation assemblies in the overhead, structural frames, and bulkheads in accordance with 2.2. Insulation on the overhead shall be 2-inch thick and all structural frames and bulkheads shall be One-inch thick. All structural frame insulation shall extend from the interior side of deckhouse side plating and underside of 03 level deck for a distance of 12-inches.

3.2.1 Replace with new a total of 500 linear feet of fiberglass bounding angle piece 20 of 2.2 as directed by the SUPERVSIOR.

3.3 Accomplish the requirements of 009-32 to paint new surfaces in accordance with manufacturers’ instructions as follows:

3.3.1 From 7-feet 6-inches above the deck and entire overhead including the false ceiling overhead framework shall be painted flat black.

3.3.2 From 4-inch above the deck to 7-feet 6-inches above the deck shall be painted white polyurethane.

3.4 Install new 1/8” thick galvanized sheet metal (curtain plates) above all compartment bulkheads in areas listed in 1.2 that have an open space resulting from the removal of overhead tiles as directed by the

SUPERVISOR.

3.4.1 New sheet metal shall overlap and be riveted to the existing bulkheads using 3/16-inch rivets on 6-inch center. Other end of sheet metal shall be tacked staggered welded to existing structures with a 1/8-fillet weld on 8-inch center. All structural members shall have a collar surrounding it with made of 1/8” galvanized sheet metal. All joints shall be continuously caulked using a polyurethane caulk.

3.4.2 New sheet metal installation may allow for the use of

structural adhesive only on the topside of the new plate with the approval of the SUPERVISOR.

3.5 Accomplish the requirements of SSPC-SP3 of 2.10 to the bottom 6 -inch of all metal furniture and preserve using similar colors as the existing condition in areas listed in 1.2 using 2.9 through 2.11 for guidance.

3.6 Remove existing Galley Power Panel P-404, listed in 1.3.1 (located in Zone 34-B of 2.13) and install new, using 2.15 for guidance. See Note

SSP: SSPH-509-16 3 of 3 ITEM NO: 637-11-001

4.1.

3.6.1 Accomplish the requirements of 009-22 for each circuit.

Isolate and report grounded circuits by circuit designation. Minimum acceptable insulation resistance values from bus/circuit to hull shall be one megohm for power and control circuits, and 0.5 megohm for lighting circuits.

3.6.1.1 009-22 requirements shall be limited to circuit identification and insulation resistance measurements of all circuits.

3.6.1.2 Install new circuit breakers, new circuit breakers shall be equal to existing circuit breaker voltage and current rating.

3.6.1.3 Submit one legible copy, in approved transferrable

media, of a report listing the requirements of 3.12.1 to the SUPERVISOR , within 3 days of completion of tests.

3.7 Accomplish the requirements of 009-22 for each power and lighting distribution panel circuit, using 2.13 through 2.20 for guidance. Isolate and report grounded circuits by circuit designation. Minimum acceptable insulation resistance values from distribution panel bus/circuit to hull shall be one megohm for power and control circuits, and 0.5 megohm for lighting circuits. See Note 4.1.

3.7.1 Do not megger power distribution panel 2-3-1, located in compartment 2-3-O-L. See Note 4.2.

3.7.2 009-22 requirements shall be limited to circuit identification and insulation resistance measurements of all circuits.

3.7.3 Submit one legible copy, in approved transferrable media, of a report listing the requirements of 3.13 to the SUPERVISOR , within 3 days of completion of tests.

3.8 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 References 2.14 through 2.20 may not reflect the current power and lighting configuration. These references are to be used for guidance only.

4.2 Power Panel 2-3-1, located in compartment 2-3-O-L, is normally grounded via the secondary side of step down transformer 2-3-1 (See Zone 10-E of 2.13).

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

YRBM 32 (YRBM 13204) ITEM NO: 637-11-002

COAR: 28 PCN: PE16-L005

CMP: NONE

PLANNER: DEFRIES, JACOB

SSP: SSPH-509-16 1 of 2 ITEM NO: 637-11-002

1. SCOPE:

1.1 Title: Mold Inspection; accomplish

1.2 Location of Work:

1.2.1 Main Deck, Entire Interior

1.2.2 01 Level, Entire Interior

1.2.3 02 Level, Entire Interior

1.2.4 Hold Level, Entire Interior

1.3 Identification:

1.3.1 N/A

2. REFERENCES:

2.1 Standard Items, (FY-17)

2.2 Industrial Hygiene Field Operations Manual, Ch. 13 Indoor

Environmental Quality

2.3 635-5478309 Rev E, Compartment Insulation

2.4 801-5478327 Rev A, General Arrangement Hold, Main Deck & 01 Level

2.5 801-5478328 Rev A, General Arrangement 02 Level & Above

2.6 29 CFR Part 1915, Occupational Safety and Health Standards for Shipyard Employment

3. REQUIREMENTS:

3.1 Accomplish a mold inspection of the spaces listed in 1.2, in accordance with 2.2 and using 2.3 through 2.6 for guidance.

3.2 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.1 to the SUPERVISOR.

3.2.1 Report shall contain at a minimum:

* Each space or compartment that has been inspected.

* If mold was found, what specific area in accompanying space is mold located.

* Recommendation for mold remediation.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Work item should be accomplished in conjunction with 637-11-001.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

SSP: SSPH-509-16 2 of 2 ITEM NO: 637-11-002

5.2 PUSH MATERIAL:

1. None.

YRBM-32 509-16 Index
YRBM-32 509-16 Work Items