26R6131 QA_0002.pdf

PDF 132 KB Posted

Attached to
Dry Cargo TUGCON
Solicitation number
N3220526R6131
Issued by

About this file

This is a Questions and Answers document (No. 2) issued by Military Sealift Command (MSC) on 31 August 2026 for solicitation N3220525R6131. The document provides clarifications to three questions submitted by potential offerors regarding a towing contract.

The document addresses three key operational matters: (1) delivery berth location and unrigging responsibility—the tow will be delivered to Victor Pier, Pearl Harbor, with the contractor bearing full responsibility and cost for unrigging tow equipment including crane services if needed; (2) towing arrangement details—USNS CATAWBA has padeyes on the bow with drawings and photos provided to show tow connection points; and (3) pre-tow conference format—the required conference, which must occur no later than 24 hours before the 26 September 2026 layday start date, will be conducted virtually via MS Teams or similar platform rather than requiring in-person attendance at the port of departure. The document explicitly states that these answers provide clarification only and do not constitute an amendment to the solicitation.

View the file

Other files

File Type Posted
QA PIC1.jpg JPG image
Bow drawing.pdf PDF
QA PIC2.jpg JPG image
26R6131 A0001 Box7B.pdf PDF
TUGCON 2026 (02-26).pdf PDF
26R6131 QA_0001.pdf PDF
26R6131 RFP.pdf PDF
2015-0213 Rev. 42.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N3220525R6131

QUESTIONS AND ANSWERS #2

31 August 2026

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

1. Honolulu delivery berth and unrigging responsibility. What specific berth/pier in Honolulu will be designated for delivery of the tow (Box 5)? Will MSC/the Navy arrange a crane for unrigging the tow equipment (bridle, tow wire, etc.) upon arrival, or is this the Contractor's responsibility? If the Contractor is responsible, please confirm the delivery pier so that crane support can be arranged in advance.

ANSWER: Victor Pier, Pearl Harbor. The government does not require nor provide a crane for unrigging the tow equipment. Unrigging costs including crane (if needed at contractor discretion) are contractor’s responsibility and cost.

2. Towing arrangement. Is a General Arrangement plan/drawing of USNS CATAWBA available? In addition, are there photos of the tow connection points on CATAWBA (e.g., smit brackets, pad eyes)? We would like to see where and how the tow connection is made.

ANSWER: CATAWBA has a padeyes on bow. Drawing and photos attached.

3. Pre-tow conference format (Box 7(G)). The RFP requires a pre-tow conference not later than 24 hours before the start of laydays (26 September 2026), with time and location "mutually agreed upon by MSC and contractor." Can this conference be conducted virtually (video/teleconference), or is an in-person conference at the port of departure required? An in-person requirement would affect our travel planning and cost.

ANSWER: Yes. Pre-tow conference will be virtual (MS Teams or similar)