26R6098 QA 0001.pdf
PDF 108 KB Posted
- Attached to
- 365-day Dry Cargo Time Charter
- Solicitation number
- N3220526R6098
About this file
This document is a Questions and Answers (Q&A) file issued by Military Sealift Command (MSC) on 09 June 2026 under solicitation number N3220526R6098. The Q&A provides clarification on crane requirements for a vessel but does not constitute an amendment to the underlying solicitation.
The document addresses four key questions regarding crane specifications. The crane must be a permanent fixture on the vessel, not a portable or temporary installation. It is not required to be a subsea crane. The crane will be subjected to dynamic loads during cargo loading and discharging operations between pier and vessel, rather than static loads. Finally, the crane does not need to be man-rated. These clarifications establish the functional and installation parameters for the crane system being procured under this contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26R6098_Re-open_A0001.pdf | ||
| 26R6098 A1 Fuel Consumption.xlsx | XLSX spreadsheet | |
| Notification Email_SAM.pdf | ||
| 26R6098_RFP.pdf | ||
| DRYTIME 2026 (02-26).pdf | ||
| DRYTIME 2026 (02-26) Boxes.pdf | ||
| 2019 0288 Rev 26.pdf | ||
| Shipyard Data Template.xlsx | XLSX spreadsheet | |
| 26R6098 Fuel Consumption.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N3220526R6098
QUESTIONS AND ANSWERS
09 June 2026
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
1. Is the crane required to be a permeant fixture on the vessel, or will MSC consider a portable or temporary crane attached on the deck?
ANSWER – The crane is required to be a permanent fixture on the vessel.
2. Is the crane required to be a subsea crane?
ANSWER – No. There is no requirement for a subsea crane.
3. Will it be static or dynamic loads being placed on the crane?
ANSWER – It will be dynamic loads being placed on the crane. Consider loading and discharging cargo from a pier to the vessel and back.
4. Please clarify whether the crane needs to be man rated.
ANSWER – The crane does not need to be man rated.