JA New Work Enclosure P00015.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- USS EMORY S. LAND ROH/DD FY26 P00007
- Solicitation number
- N3220526C1223
About this file
This file is a New Work Enclosure spreadsheet that appears to support contract planning documentation for USS EMORY S. LAND maintenance and modernization efforts. The spreadsheet contains work breakdown structure (WBS) information and associated planning data organized in tabular format to detail scope, requirements, and resource allocation for the vessel's Restricted Overhaul and Modernization (ROH) efforts planned for Fiscal Year 2026.
The document serves as an enclosure to support the Limited/Sole Source Justification solicitation N3220526C1223 issued by the Department of the Navy Military Sealift Command. This planning tool provides the structured work packages and supporting information that likely justifies the limited source justification approach for contract award, which occurred on February 13, 2026. The spreadsheet format allows for detailed tracking of work elements, quantities, and associated planning metrics necessary for executing the ship's overhaul and modernization requirements under this naval contract action.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N10426C1223P00006_Redacted.pdf | ||
| JA New Work Enclosure.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P00006
| Enclosure to J&A No. N10426C1232P00015 | ||
| CCO | WI | Description/Justification |
| 001 | WI 0031 | WAF Procedure |
| 006 | WI 538 - NR3 SSTG Circulation Pump and Motor Repair | Additional Circ Pumps for repair |
| 012 | WI 0035 - Damage Control Locker | Damage Control Locker |
| 037 | Additional Relief Valves | New Relief Valves |
| 047 | Chill Water Pump Motor Crating | FRANK CABLE needs the Pump |
| 053 | Mooring Station No. 5 and No.6 Repair | ABS Condition of Class Correction |
| 054 | Mooring Station Number One Repair (CoC 788) | ABS Condition of Class Correction |
| 055 | Boiler Stacks and Combustion Intake Clean and Inspect | Has not been inspected and cleaned in last 3 ROHs (10+ years) |
| 056 | AS-CCSI-AC MOTOR AND VENT FAN REWIND | ABS Condition of Class Correction |
| 057 | Firemain Valves Replace | ABS Condition of Class Correction |
| 058 | Fuel Piping Riser Replace | ABS Condition of Class Correction |
| 059 | Shore Steam Dick Riser Piping | ABS Condition of Class Correction |
| 060 | Fuel Oil Pipe Replace | ABS Condition of Class Correction |
| 061 | Vent Plenum and BHD Repair | ABS Condition of Class Correction |
| 074 | WTD SILL AND STIFFENERS REPAIR | ABS Condition of Class Correction |
| 075 | SHIPS LAUNDRY STEEL REPAIR | ABS Condition of Class Correction |
| 076 | J-BAR AND DAVIT REPAIR | ABS Condition of Class Correction |
| 077 | PASSAGE WAY DECK REPAIR | ABS Condition of Class Correction |
| 078 | 02 LEVEL PORT DECK REPAIRS | ABS Condition of Class Correction |
| 079 | PASSAGE WAY DECK REPAIR | ABS Condition of Class Correction |
| 080 | UNDER DECK STIFFENER | ABS Condition of Class Correction |
| 081 | FAN ROOM PRESERVATION | ABS Condition of Class Correction |
| 082 | VENT PIPE AND PLUMBING REPLACE | ABS Condition of Class Correction |
| 083 | FIXED HANDRAIL REPLACE | ABS Condition of Class Correction |
| 084 | ECHO SOUNDER WATER HEATER PRESERVATION | ABS Condition of Class Correction |
| 088 | ADDITIONAL VALVE REPAIR | machninery needed overhaul |
| 236 | TAIL SHAFT INSPECTION | machninery needed overhaul |
| 295 | UW HULL REPAIRS | steel needed overhaul |
| 323 | INSPECT 3 FEDERAL BREAKERS | machninery needed overhaul |
| 335 | BLASTRAC GROOM | machninery needed overhaul |
| 352 | STAGE 2ND 5 TON CRANE | Parts showed up without justification to store |
| 377 | 30 TON MACHINERY ROOM REPAIRS | Roof is gone beyond usage |
File details come from the government source that posted it. Updated .