JA New Work Enclosure.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- USS EMORY S. LAND ROH/DD FY26 P00007
- Solicitation number
- N3220526C1223
About this file
This is an enclosure to a Justification and Approval (J&A) document for sole source procurement related to the USS Emory S. Land repair overhaul and modernization efforts in FY26. The document outlines 84 separate work items (WIs) numbered sequentially from WI 0031 through WI 084, detailing maintenance, repair, and preservation requirements for the naval vessel.
The work items encompass a comprehensive range of ship systems and structural repairs, including circulation pump and motor repairs, damage control locker work, chill water pump motor crating, mooring station repairs, boiler stack cleaning and inspection, motor and ventilation fan rewinding, replacement of firemain valves, fuel piping risers, steam piping systems, and fuel oil pipes. Additionally, the scope includes structural steel repairs to multiple deck areas, laundry facilities, J-bar and davit repairs, passageway deck repairs, stiffener repairs, fan room preservation, vent pipe and plumbing replacement, and handrail replacement. Most items are identified as American Bureau of Shipping (ABS) Condition of Class Corrections, indicating compliance requirements for the vessel's maritime classification. The boiler stack work notes it has not been inspected or cleaned within the last three Regular Overhauls (10+ years), underscoring deferred maintenance needs. The Department of the Navy Military Sealift Command is the responsible federal agency, with the contract awarded on February 13, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N10426C1223P00006_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P00006
| Enclosure to J&A No. N10426C1232P00002 | ||
| CCO | WI | Description/Justification |
| 001 | WI 0031 | WAF Procedure |
| 006 | WI 538 - NR3 SSTG Circulation Pump and Motor Repair | Additional Circ Pumps for repair |
| 012 | WI 0035 - Damage Control Locker | Damage Control Locker |
| 047 | Chill Water Pump Motor Crating | FRANK CABLE needs the Pump |
| 053 | Mooring Station No. 5 and No.6 Repair | ABS Condition of Class Correction |
| 054 | Mooring Station Number One Repair (CoC 788) | ABS Condition of Class Correction |
| 055 | Boiler Stacks and Combustion Intake Clean and Inspect | Has not been inspected and cleaned in last 3 ROHs (10+ years) |
| 056 | AS-CCSI-AC MOTOR AND VENT FAN REWIND | ABS Condition of Class Correction |
| 057 | Firemain Valves Replace | ABS Condition of Class Correction |
| 058 | Fuel Piping Riser Replace | ABS Condition of Class Correction |
| 059 | Shore Steam Dick Riser Piping | ABS Condition of Class Correction |
| 060 | Fuel Oil Pipe Replace | ABS Condition of Class Correction |
| 061 | Vent Plenum and BHD Repair | ABS Condition of Class Correction |
| 074 | WTD SILL AND STIFFENERS REPAIR | ABS Condition of Class Correction |
| 075 | SHIPS LAUNDRY STEEL REPAIR | ABS Condition of Class Correction |
| 076 | J-BAR AND DAVIT REPAIR | ABS Condition of Class Correction |
| 077 | PASSAGE WAY DECK REPAIR | ABS Condition of Class Correction |
| 078 | 02 LEVEL PORT DECK REPAIRS | ABS Condition of Class Correction |
| 079 | PASSAGE WAY DECK REPAIR | ABS Condition of Class Correction |
| 080 | UNDER DECK STIFFENER | ABS Condition of Class Correction |
| 081 | FAN ROOM PRESERVATION | ABS Condition of Class Correction |
| 082 | VENT PIPE AND PLUMBING REPLACE | ABS Condition of Class Correction |
| 083 | FIXED HANDRAIL REPLACE | ABS Condition of Class Correction |
| 084 | ECHO SOUNDER WATER HEATER PRESERVATION | ABS Condition of Class Correction |
File details come from the government source that posted it. Updated .