JA New Work Enclosure.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
USS EMORY S. LAND ROH/DD FY26 P00007
Solicitation number
N3220526C1223
Issued by

About this file

This is an enclosure to a Justification and Approval (J&A) document for sole source procurement related to the USS Emory S. Land repair overhaul and modernization efforts in FY26. The document outlines 84 separate work items (WIs) numbered sequentially from WI 0031 through WI 084, detailing maintenance, repair, and preservation requirements for the naval vessel.

The work items encompass a comprehensive range of ship systems and structural repairs, including circulation pump and motor repairs, damage control locker work, chill water pump motor crating, mooring station repairs, boiler stack cleaning and inspection, motor and ventilation fan rewinding, replacement of firemain valves, fuel piping risers, steam piping systems, and fuel oil pipes. Additionally, the scope includes structural steel repairs to multiple deck areas, laundry facilities, J-bar and davit repairs, passageway deck repairs, stiffener repairs, fan room preservation, vent pipe and plumbing replacement, and handrail replacement. Most items are identified as American Bureau of Shipping (ABS) Condition of Class Corrections, indicating compliance requirements for the vessel's maritime classification. The boiler stack work notes it has not been inspected or cleaned within the last three Regular Overhauls (10+ years), underscoring deferred maintenance needs. The Department of the Navy Military Sealift Command is the responsible federal agency, with the contract awarded on February 13, 2026.

View the file

Other files

File Type Posted
N10426C1223P00006_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P00006

Enclosure to J&A No. N10426C1232P00002
CCOWIDescription/Justification
001WI 0031WAF Procedure
006WI 538 - NR3 SSTG Circulation Pump and Motor RepairAdditional Circ Pumps for repair
012WI 0035 - Damage Control LockerDamage Control Locker
047Chill Water Pump Motor CratingFRANK CABLE needs the Pump
053Mooring Station No. 5 and No.6 RepairABS Condition of Class Correction
054Mooring Station Number One Repair (CoC 788)ABS Condition of Class Correction
055Boiler Stacks and Combustion Intake Clean and InspectHas not been inspected and cleaned in last 3 ROHs (10+ years)
056AS-CCSI-AC MOTOR AND VENT FAN REWINDABS Condition of Class Correction
057Firemain Valves ReplaceABS Condition of Class Correction
058Fuel Piping Riser ReplaceABS Condition of Class Correction
059Shore Steam Dick Riser PipingABS Condition of Class Correction
060Fuel Oil Pipe ReplaceABS Condition of Class Correction
061Vent Plenum and BHD RepairABS Condition of Class Correction
074WTD SILL AND STIFFENERS REPAIRABS Condition of Class Correction
075SHIPS LAUNDRY STEEL REPAIRABS Condition of Class Correction
076J-BAR AND DAVIT REPAIRABS Condition of Class Correction
077PASSAGE WAY DECK REPAIRABS Condition of Class Correction
07802 LEVEL PORT DECK REPAIRSABS Condition of Class Correction
079PASSAGE WAY DECK REPAIRABS Condition of Class Correction
080UNDER DECK STIFFENERABS Condition of Class Correction
081FAN ROOM PRESERVATIONABS Condition of Class Correction
082VENT PIPE AND PLUMBING REPLACEABS Condition of Class Correction
083FIXED HANDRAIL REPLACEABS Condition of Class Correction
084ECHO SOUNDER WATER HEATER PRESERVATIONABS Condition of Class Correction

File details come from the government source that posted it. Updated .