23R4017 Attachment IX (F) - Basic Pricing Data Rev.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Far East Tanker Time Charter Federal contract opportunity
Solicitation number
N32205-23-R-4017
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains pricing templates for a federal solicitation seeking offers for a time charter of a Far East tanker. The solicitation number is N32205-23-R-4017 and is being issued by the Department of the Navy Military Sealift Command. Offerors are required to provide their daily charter rates for the vessel over a base period of 366 days and up to four option periods of 365 or 336 days, accounting for estimated days off-hire. Pricing templates separate the daily rates into costs for crew, vessel operations, insurance, other expenses, general and administrative fees, and profit. Offerors must also provide estimated fuel consumption rates and types for laden and ballast conditions underway as well as in-port loading and discharging. The total evaluated price will be determined by applying the daily rates to the number of days in each period.

View the file

Other files for this federal contract opportunity

Other files attached to Far East Tanker Time Charter, newest first.
File Type Posted
23R4017 A0003 completely uploaded.pdf PDF
23R4017 A0003.pdf PDF
23R4017 A0002.pdf PDF
23R4017 Attachment IX (I) - PWS Rev.pdf PDF
23R4017 A0001.pdf PDF
N3220523R4017 Question Responses 001.pdf PDF
23R4017 Attachment IX (H) - DD Form 254.pdf PDF
RFP N3220523R4017.pdf PDF
23R4017 Attachment IX (F) - Basic Pricing Data.xlsx XLSX spreadsheet
23R4017 Attachment IX (G) - Crew Complement.docx DOCX document
23R4017 Attachment IX (N) - Shipboard Security System.pdf PDF
23R4017 Attachment IX (P) - Disclosure of Lobbying Activities (SFLLL).pdf PDF
23R4017 Attachment IX (J) - Technical Offer Worksheet.XLSX XLSX spreadsheet
23R4017 Attachment IX (K) - ATFP CBRD Requirements.pdf PDF
23R4017 Attachment IX (L) - CBRN Requirements.pdf PDF
23R4017 Attachment IX (M) - CBRN-D Decon Station.pdf PDF
23R4017 Attachment IX (Q) - MECSP Worksheet.docx DOCX document
23R4017 Attachment IX (T) - Clarification and Question Form.docx DOCX document
23R4017 Attachment IX (H) - DD Form 254 2025.pdf PDF
23R4017 Attachment IX (O) - CONSOL Station Requirement.pdf PDF
23R4017 Attachment IX (S) - MSC Standard Operating Manual (SOM).pdf PDF
23R4017 Attachment IX (B) - CBA 2022-0235 REV 1.pdf PDF
23R4017 Attachment IX (E) - GFP.xlsx XLSX spreadsheet
23R4017 Attachment IX (I) - Performance Work Statement.pdf PDF
23R4017 Attachment IX (R) - CDRL.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE* MANUALLY ENTER RATES/COSTS IN COLUMNS BELOW UP TO TWO DECIMAL POINTS TO AVOID ROUNDING ERRORS*
PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSTOTAL PER DIEM/PERIOD
BASE PERIOD366$ - 0
OPTION 1365$ - 0
OPTION 2365$ - 0
OPTION 3365$ - 0
OPTION 4336$ - 0
FAR 52.217-8183$ - 0
1980
TOTAL EVALUATED FUEL$ - 0

PORT CHARGES DIFFERENTIAL

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR

TOTAL EVALUATED PRICE

Note: OFFERORS SHALL USE THE OPTION PERIOD 4 DAILY CHARTER RATE AS THE DAILY RATE IN THE "FAR 52.217-8" PERIOD.

Base Period

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220523R4017
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220523R4017
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220523R4017
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220523R4017
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220523R4017
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 336-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 336 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Fuel Consumption Data

Attachment IX(F)Vessel: FAR EAST TANKER
Fuel Consumption DataRFP: N3220523R4017

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Enter Fuel Type from list of fuel types found in Note 1 below. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
91Fuel Underway (laden)1546
Other Fuel Type (if necessary)
92Fuel Underway (ballast)157
Other Fuel Type (if necessary)
94aIn-Port Loading157
Other Fuel Type (if necessary)
94bIn-Port Discharging120
Other Fuel Type (if necessary)
1980TOTAL:$ - 0
Notes:
1Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors. The rates to be used are as follows:
DLA Std Price Oct 1, 2022
MGO/MDO: (Very Low Sulphur 0.5%) Fuel Oilper metric ton$ 1,333.72
IFO-180:per metric ton$ 855.16
IFO-380:per metric ton$ 847.55
Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request,
prior to offers being received, that rates for that fuel be posted via an amendment.

Fuel conversion factors are as follows:

MGO/MDO:7.507 barrels per metric ton
IFO-180:6.526 barrels per metric ton
IFO-380:6.468 barrels per metric ton

2 Fuel Consumption shall be assuming moderate weather

3 Fuel Consumption shall be based upon Box 91, 92, 94a and 94b consumption rates. Fuel consumed during in-port periods when on shore power will not be evaluated.