23R4017 Attachment IX (F) - Basic Pricing Data.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- Far East Tanker Time Charter
- Solicitation number
- N32205-23-R-4017
About this file
This document contains pricing templates for a federal solicitation seeking a time charter for a Far East Tanker. The solicitation was issued by the Department of the Navy Military Sealift Command as opportunity N32205-23-R-4017. Offerors were required to provide daily pricing for crew, vessel operations, insurance, and fuel costs for the base period of one year plus four optional one-year extensions. Pricing templates were included for the base period and each option period requiring itemized costs and total evaluated prices. A separate fuel consumption template requested metric tons of fuel burned per day by fuel type for laden and ballast conditions underway and in-port loading and discharging. Standard Defense Logistics Agency fuel prices from October 2022 were provided. The solicitation sought a time charter for a Far East Tanker from the Department of the Navy Military Sealift Command.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOTAL EVALUATED PRICE
| TOTAL EVALUATED PRICE | * MANUALLY ENTER RATES/COSTS IN COLUMNS BELOW UP TO TWO DECIMAL POINTS TO AVOID ROUNDING ERRORS* | ||
| PER DIEM | |||
| DAILY CHARTER HIRE RATE | # OF DAYS | TOTAL PER DIEM/PERIOD | |
| BASE PERIOD | 366 | $ - 0 | |
| OPTION 1 | 365 | $ - 0 | |
| OPTION 2 | 365 | $ - 0 | |
| OPTION 3 | 365 | $ - 0 | |
| OPTION 4 | 336 | $ - 0 | |
| FAR 52.217-8 | 183 | $ - 0 | |
| 1980 | |||
| TOTAL EVALUATED FUEL | $ - 0 |
PORT CHARGES DIFFERENTIAL
DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR
REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR
TOTAL EVALUATED PRICE
Note: OFFERORS SHALL USE THE OPTION PERIOD 4 DAILY CHARTER RATE AS THE DAILY RATE IN THE "FAR 52.217-8" PERIOD.
Base Period
| Attachment IX(F) | Vessel: | ||
| Basic Pricing Data | RFP: N3220523R4017 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 366-day year | |||
| Base Period | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment G | ||
| 2 | Crew Training, not separately itemized in Attachment G | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 366 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 1
| Attachment IX(F) | Vessel: | ||
| Basic Pricing Data | RFP: N3220523R4017 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Option Period One | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment G | ||
| 2 | Crew Training, not separately itemized in Attachment G | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 2
| Attachment IX(F) | Vessel: | ||
| Basic Pricing Data | RFP: N3220523R4017 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Option Period Two | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment G | ||
| 2 | Crew Training, not separately itemized in Attachment G | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 3
| Attachment IX(F) | Vessel: | ||
| Basic Pricing Data | RFP: N3220523R4017 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Option Period Three | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment G | ||
| 2 | Crew Training, not separately itemized in Attachment G | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 4
| Attachment IX(F) | Vessel: | ||
| Basic Pricing Data | RFP: N3220523R4017 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 336-day year | |||
| Option Period Four | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment G | ||
| 2 | Crew Training, not separately itemized in Attachment G | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 336 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Fuel Consumption Data
| Attachment IX(F) | Vessel: FAR EAST TANKER |
| Fuel Consumption Data | RFP: N3220523R4017 |
Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Enter Fuel Type from list of fuel types found in Note 1 below. If more than one fuel type is burned either underway or in-port please use extra rows provided.
| Box # | Description | # Days | Metric Tons/day | Fuel Type | Price per Metric Ton | Total |
| 91 | Fuel Underway (laden) | 1546 | ||||
| Other Fuel Type (if necessary) | ||||||
| 92 | Fuel Underway (ballast) | 157 | ||||
| Other Fuel Type (if necessary) | ||||||
| 94a | In-Port Loading | 157 | ||||
| Other Fuel Type (if necessary) | ||||||
| 94b | In-Port Discharging | 120 | ||||
| Other Fuel Type (if necessary) | ||||||
| 1980 | TOTAL: | $ - 0 | ||||
| Notes: |
| 1 | Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and | ||
| appropriate fuel conversion factors. The rates to be used are as follows: | |||
| DLA Std Price Oct 1, 2022 | |||
| MGO/MDO: (Very Low Sulphur 0.5%) Fuel Oil | per metric ton | $ 1,333.72 | |
| IFO-180: | per metric ton | $ 855.16 | |
| IFO-380: | per metric ton | $ 847.55 |
| Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request, |
| prior to offers being received, that rates for that fuel be posted via an amendment. |
Fuel conversion factors are as follows:
| MGO/MDO: | 7.507 barrels per metric ton |
| IFO-180: | 6.526 barrels per metric ton |
| IFO-380: | 6.468 barrels per metric ton |
2 Fuel Consumption shall be assuming moderate weather
3 Fuel Consumption shall be based upon Box 91, 92, 94a and 94b consumption rates. Fuel consumed during in-port periods when on shore power will not be evaluated.
File details come from the government source that posted it. Updated .