Drawings Decon Station.pdf
PDF 401 KB Posted
- Attached to
- Medium Range Tanker Time Charter Federal contract opportunity
- Solicitation number
- N32205-22-R-5435
About this file
This document package includes drawings and specifications for a decontamination station as well as a solicitation for a medium range tanker time charter.
The drawings provide details for constructing a standard non-CPS chemical, biological, radiological contamination control area and decontamination station for ships. It specifies materials, equipment, signage and other requirements. A list of materials designates equipment and components and their requirements. Drawings show layouts, dimensions and notes for showers, doors, drainage and other features. The solicitation seeks a time charter for medium range tankers to support petroleum, oil and lubricant resupply operations worldwide. Offerors must own or charter U.S. flag vessels that meet eligibility and vessel criteria. The base period of performance is five years with options to extend. Pricing will be evaluated for fixed daily charter hire rates on a per vessel basis. The award is expected by September 2022.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
46 3 1
REV ZONE DESCRIPTION DATE
REVISIONS
APPVD
GENERAL NOTES
C
B
A
46 3 125
D
C
B
A
1. THIS DRAWING PROVIDES A FUNCTIONAL ARRANGEMENT FOR A STANDARD NON
CPS, CHEMICAL, BIOLOGICAL, RADIOLOGICAL (CBR) CONTAMINATION CONTROL
AREA/DECONTAMINATION STATION (CCA/DS). THE CONFIGURATION SHOWN IS
SUFFICIENT TO SUPPORT A TWO-CUTTER OPERATED CCA. VARIATIONS IN
COMPARTMENT LOCATION AND SIZE TO ACCOMODATE VARIOUS SHIP
CONFIGURATIONS ARE PERMITTED. HOWEVER, FUNCTIONAL RELATIONSHIP AND
SUITABLE ACCESS MUST NOT BE COMPROMISED. ALL OF THE EQUIPMENT,
FUNCTIONS, AND MATERIAL GRADE REQUIREMENTS DIRECTED IN THE
"GENERAL NOTES" AND THE MATERIAL AND GRADE REQUIREMENTS LISTED IN
THE "LIST OF MATERIALS" SHALL BE INCLUDED IN THE CONSTRUCTION OF
THE CCA.
2. FOR RETROFITS, CONVERSIONS, AND CHARTERED SHIPS, THE PROPOSED
INSTALLATION SHALL BE APPROVED AND SIGNED OFF BY MSC ENGINEERING
DIRECTORATE PRIOR TO COMMENCING FABRICATION. OPERATING AND
CHARTERING COMPANIES SHALL SUBMIT PROPOSED INSTALLATION IDENTIFYING
ALL MATERIALS AND FUNCTIONAL ARRANGEMENT THRU THE CONTRACTING
OFFICER TO N7 ENGINEERING DIRECTORATE.
3. SPACES WITH OTHER FUNCTIONS MAY BE CONFIGURED FOR USE AS A
DECONTAMINATION STATION IF APPROVED BY MSC ENGINEERING DIRECTORATE.
4. ALL INSTALLED ELECTRICAL/ELECTRONIC SYSTEMS INCLUDING LIGHT FIXTURES,
SWITCHES, AND FITTINGS SHALL BE OF WATERTIGHT CONSTRUCTION.
5. THE CCA SHALL HAVE ACCESS DIRECTLY FROM THE WEATHER DECK AND A
SEPARATE EXIT INTO THE SHIP. IF SUITABLE INTERIOR SPACE IS
UNAVAILABLE, A DECK AREA OUTSIDE OF THE SUPERSTRUCTURE WITH
OVERHEAD COVER MAY BE ACCEPTABLE IF APPROVED BY MSC ENGINEERING
DIRECTORATE.
6. NO CCA/DS WEATHER ENTRANCE SHALL OPEN TO THE BOW.
DRAWING REDONE TO INCORPORATE CHANGES
REQUIRED PER NAVAL SURFACE WARFARE CENTER LTR
3400 H33-MAP OF 3 DEC 90
DRAWING REDONE TO INCORPORATE CHANGES
REQUIRED PER MSC STANDARD FORMAT (2.1.1)
DRAWING NO. 803-7080803
CHANGES MADE TO INCORPORATE AND CLARIFY
REQUIREMENTS.
ALL 5/10/91
ALL
B
8/15/12
A
C
ALL 3/20/13
C
TITLE:
APPROVED BY:
TITLE:
APPROVED BY:
TITLE:
APPROVED BY:
APPROVED BY:
DRAWN BY:
20398-5540
MILITARY SEALIFT COMMAND
SHEET OF
DATE
:SCALE:
DATE
DATE
DATE
DATE
CAGE CODESIZE
WASHINGTON, D.C.
CHECKED BY:
DRAWING NO.
DEPARTMENT OF THE NAVY
REV.
TITLE:
APPROVED FOR COMSC
SWBS
4844759 C94421B
AS NOTED 1 6
STANDARD PLAN FOR
DECONTAMINATION
STATION
J. BERMAN
J. BERMAN
J. FERNAN
F. WOODY
J. GLADSON
K. BAETSEN
J. BERMAN
3/15/13
4/4/13
4/4/13
4/4/13
4/4/13
MSC DWG NOCAGE CODE REVSIZE
OFSHEETSCALE:
D
1012 9 7811
C
B
A
1012 9 7811
D
C
B
A
GENERAL NOTES (CONT'D)
7. ALL DRAINS FROM THE CCA/DS SHALL BE NEGATIVELY SLOPED AND SHALL
DRAIN DIRECTLY OVERBOARD WITH USE OF A TRAP. IF APPROVED BY MSC
ENGINEERING DIRECTORATE, AN EXISTING DRAIN PIPED TO THE SHIPS DRAIN
SYSTEM MAY BE USED. IN SUCH CASES, PIPING MODIFICATIONS SHALL BE
MADE TO ALLOW THE SHIP TO ISOLATE THE SHIPS DRAIN SYSTEM FROM THE
CCA/DS DRAIN IN LOCAL VICINITY OF THE CONNECTION AND DIVERT THE
CCA/DS DRAINS DIRECTLY OVERBOARD.
8. FRESH WATER SUPPLY TO SHOWERS AND FAUCET IS RECOMMENDED TO
SIMPLIFY INSTALLATION. A SALT WATER SUPPLY SYSTEM IS ACCEPTABLE IF
SUFFICIENT FRESH WATER PIPING TO SUPPORT DECON PROCEDURES IS NOT
AVAILABLE. HOWEVER, FRESH WATER IS REQUIRED TO FLUSH SALT WATER
INSTALLATIONS. REFER TO BOM FOR TUBING/PIPING MATERIAL SPEC.
SEA WATER OR FRESH WATER SUPPLY PRESSURES:
MINIMUM PRESSURE = 25 PSI
MAXIMUM PRESSURE = 80 PSI
AUTOMATIC REDUCING VALVES SHALL BE INSTALLED ON EACH SUPPLY TO
LIMIT THE SHOWER PRESSURE TO A MAXIMUM OF 80 PSI.
9. INTERCOM STATIONS AT WEATHER ENTRANCE, OGRA, IGRA AND SHOWER AREA
SHALL BE "HANDS FREE" IN DESIGN AND OPERATION. INTERCOM STATION IN
SHOWER TO BE MOUNTED IN OVERHEAD AND PROVIDED WITH SPLASH
SHIELD. INTERCOM OUTSIDE OF DECON STATION ON INTERIOR OF SHIP AT
DECON STATION CONTROL AREA SHALL HAVE MASTER CONTROL. A SHIPS
TELEPHONE WITH COMMUNICATION TO DC CENTRAL AND THE BRIDGE SHOULD
BE LOCATED AT THE DECON STATION CONTROL AREA IMMEDIATELY NEXT TO
THE SHOWER DOOR. WEATHER ENTRANCE INTERCOM SHALL HAVE WEATHER
TIGHT ENCLOSURE.
10. LIGHTING SYSTEM FOR ALL AREAS SHALL BE OF WATERTIGHT CONSTRUCTION,
WITH RED LIGHT CAPABILITIES. BACK UP POWER FOR DECON STATION
LIGHTING SHALL BE FROM AN EMERGENCY SOURCE.
11. CCA/DS WEATHER DOORS SHALL BE EQUIPPED WITH LIMIT SWITCHES THAT
SECURE LIGHTING WHEN REQUIRED TO MEET ANY DARKEN SHIP
REQUIREMENTS. LIGHTING CAN BE EITHER FLOURESCENT OR
INCANDESCENT.
12. ALL FABRICATION, WELDING, AND INSPECTION SHALL BE IN ACCORDANCE
WITH THE LATEST ABS AND USCG RULES AND REGULATIONS. ALL SEAMS
SHALL BE COMPLETELY SEALED UTILIZING 100% FILLET WELDS.
13. ALL INTERNAL BULKHEADS AND OVERHEADS SHALL BE SMOOTH. ALL WORK
SHALL BE FREE OF SHARP EDGES AND BURRS TO PREVENT PERSONNEL
INJURY AND POTENTIAL POCKETING OF CONTAMINANTS. ANY SEAM NOT
WELDED WITH 100% FILLET WELDS SHALL BE SEALED WITH SILICONE RTV.
14. SURFACE PREPARATION AND PRIMING OF THE DECON STATION INTERIOR
SHALL BE IAW THE APPLICABLE SHIP SPECIFICATIONS EXCEPT THAT THE
FINISH COAT SHALL BE WHITE, FORMULA 152 OF MIL-DTL-24441. THESE
REQUIREMENTS APPLY TO ALL INTERIOR SURFACES OF THE DECON STATION
EXCEPT THE DECKING WHICH RECEIVES ONLY THE STATION LOCATORS.
CRES DIAMON PLATE AND SHEATHING SHALL NOT BE PAINTED.
15. BULKHEADS AND OVERHEADS SHOULD BE SMOOTH (I.E. STIFFNERS, JOINER
WORK OR INSULATION SHOULD BE INSTALLED ON THE EXTERNAL SIDE OF
THE DECON STATION) IF SMOOTH, COAT INTERIOR IN ACCORDANCE WITH NO.
14 ABOVE. IF INTERNAL STIFFENERS, JOINER WORK, OR INSULATION ARE
NECESSARY ON THE INTERIOR BULKHEADS OR OVERHEADS, CRES
SHEATHING SHALL BE EMPLOYED TO PROVIDE A SMOOTH, SEALED CCA/DS
INTERIOR. SHEATHING SHALL BE CRES TYPE 316 AND THICKNESS SHALL
BE 18 USGA (0.0478"). ALL SHEATHING SHALL BE CONTINUOUSLY WELDED
TO PROVIDE A TIGHT SEAL.
16. DECKING IN THE OGRA, IGRA, AND SHOWER SHALL BE 1/8" OR 3/16".
CRES 316L DIAMOND PLATE IAW ASTM A 793-81. STATION LOCATOR
BLOCKS 1, 2, 3, AND 4 SHALL BE PERMANENTLY MARKED ON THE DECK
BY WELD BEAD AND PAINTED WITH TWO PART EPOXY BASE PAINT IN
ACCORDANCE WITH MIL-D-23003. THE BLOCKS SHALL BE 10" BY 18".
17. A FIRE HOSE SHALL BE AVAILABLE UNDER THE CONTROL OF CCA/DS
OPERATORS FOR CLEANING THE WAITING AREA ADJACENT TO THE CCA/DS
PRIOR TO AND BETWEEN PROCESSING.
18. PORTABLE STOOL SHALL BE STAINLESS STEEL IN CONSTRUCTION,
BULKHEAD MOUNTED, AND SHALL NOT BE PAINTED. SEAT SHOULD BE
APPROXIMATELY 12" IN DIAMETER OR 12"X12" AND OVERALL HEIGHT
APPROXIMATELY 20".
802-4844759 C94421B
AS NOTED 2 6
D
1618 15 131417
C
B
A
1618 15 131417
D
C
B
A
GENERAL NOTES (CONT'D)
19. SPRINKLER HEADS SHALL BE FULL JET, WIDE ANGLE, SQUARE SPRAY,
EQUIVALENT TO SPRAYING SYSTEM CO. NOZZLE NO. 1/4HH14-WSQ BRASS.
PRESSURE AT NOZZLE SOURCE TO BE 60 PSI PLUS OR MINUS 20 PSI.
THERE SHALL BE NINE (9) SPRAY NOZZLES PER SHOWER PIPE. THERE
SHALL BE TWO (2) SHOWER PIPES IN THE SHOWER INSTALLED OPPOSITE
FROM EACH OTHER TO PROVIDE FOR EFFECTIVE WASH DOWN. TYPICAL
BRACING SHOWN. ADEQUATE BRACING TO BE INSTALLED.
20. DARKEN SHIP COVERS SHALL BE PROVIDED IN ALL LIGHT TRAP AREAS.
21. BAR GRATING SHALL BE PROVIDED IN THE SHOWER AREA. BAR GRATING
SHALL BE CRES 316. BEARING BARS SHALL BE MINIMUM 1" X 1/4" CRES.
GRATING TO BE ADEQUATELY SUPPORTED IN THE 4 CORNERS AND
FASTENED. GRATING SHOULD BE FASTENED USING REMOVABLE CLIPS.
GRATING IS INTENDED TO FACILITATE THE DECONTAMINATION PROCESS WHILE
PREVENTING RE-CONTAMINATION OF THE PERSONNEL BY CONTAMINATED
RUN-OFF. GRATING SHOULD COVER THE ENTIRE SHOWER DECK AREA.
22. IN ADDITION TO THE NORMAL SPACE DESIGNATION LABELS, DECON STATION
LABELS SHALL BE RED PLASTIC ENGRAVED WITH WHITE LETTERS. LABELS
SHALL BE INSTALLED IN THE FOLLOWING LOCATIONS WITH THE FOLLOWING
INSCRIPTIONS, WHITE LETTERS 3/4" HIGH ON A RED BACKGROUND:
A. AT THE EXTERIOR CCA ENTRANCE -
"DECONTAMINATION STATION ENTRANCE. FOR RECOVERY FROM CBR ATTACK,
ENTER UPON COMMAND"
B. IN THE SHOWER AREA -
"USE HANDS TO SHIELD CANISTERS DURING SHOWER OPERATION, CAUTION
DO NOT TOUCH CANISTERS"
802-4844759 C94421B
AS NOTED 3 6
C. ON THE DOOR LEADING FROM THE IGRA TO THE SHOWER AREA
AND ON THE DOOR LEADING FROM THE SHOWER AREA TO THE
INTERIOR OF THE SHIP.
"DO NOT OPEN THIS DOOR UNTIL ORDERED TO DO SO BY STATION
ATTENDANT."
D. ON THE INBOARD SIDE OF THE DOOR LEADING FROM INTERIOR OF
THE SHIP TO THE SHOWER AREA -
"DO NOT BLOCK DECONTAMINATION STATION EXIT"
E. ON THE INBOARD SIDE OF THE DOOR LEADING FROM THE INTERIOR
OF THE SHIP TO THE OGRA -
"NO ENTRY EXCEPT AS DIRECTED DURING DECONTAMINATION RECOVERY
EXERCISE"
23. PORTABE SCISSOR TRAY SHALL BE SIZED APPROXIMATELY 9" WIDE BY
18" LONG AND 1" DEEP. LOCAL MANUFACTURED. CRES
24. TEMPLATE ALL WORK FROM SHIP AND EQUIPMENT. DIMENSIONS
PROVIDED ARE FOR REFERENCE ONLY.
25. FOR FURTHER GUIDANCE, NSTM CHAPTER 470 PROVIDES FUNCTIONAL
INFORMATION.
D
2224 21 192023
C
B
A
2224 21 192023
D
C
B
A
802-4844759 C94421B
AS NOTED 4 6
LIST OF MATERIALS
NO. QTY DESCRIPTION MANUFACTURER MATERIAL REMARKS
1 4 INTERCOM, LOUDSPEAKER AND MICROPHONE, HANDS FREE COMMERCIAL COMMERCIAL SEE NOTE 9
2 1 FAUCET, FRESH WATER COMMERCIAL COMMERCIAL W/THREADED 3/4" HOSE ATTACHEMENT
3 1 LIGHT SWITCH COMMERCIAL COMMERCIAL
4 1 MIRROR COMMERCIAL COMMERCIAL
5 1 PORTABLE STOOL LOCAL MFR CRES SEE NOTE 19 - UNPAINTED, HINGED BHD MOUNTED
6 1 2' X 2' X 6" BOOTWASH LOCAL MFR CRES
7 1 2" DRAING COMMERCIAL CRES
8 2 4" DRAIN COMMERCIAL CRES
9 1 BAR GRATING (1" CRES 316 SS) SEIDELHUBER CRES 316 SEE NOTE 21 - MFR OR EQUAL
10 4 32 GALLON WASTE CAN (APPROX SIZE) COMMERCIAL COMMERCIAL
11 1 15" X 21" FIXED WINDOW COMMERCIAL COMMERCIAL
12 3 26" X 66" X 9" WT 8 DOG QA DOOR W/FIXED WINDWOW COMMERCIAL STEEL
13 2 26" X 66" X 9" WT 8 DOG QA DOOR W/FIXED LIGHT & COVER COMMERCIAL STEEL 6 INCH FIXED LIGHT W/HINGED COVER
14 2 PORTABLE SCISSOR TRAY LOCAL MFR CRES SEE NOTE 23
15 AR SHOWER PIPING/TUBING. 1
2" ID, CNA 90-10 COMMERCIAL CNA 90-10 MIL-T-16400 OR EQUIVALENT
16 AR SHOWER PIPING/TUBING FITTINGS, BRONZE COMMERCIAL CNA 90-10 MIL-T-16400 OR EQUIVALENT
17 18 SPRINKLER HEAD, FULL JET, WIDE ANGLE, SQUARE SPRAY SPRAYING SYSTEM CO MONEL '1/4HH 14-WSQ
D
2830 27 252629
C
B
A
2830 27 252629
D
C
B
A
6'-0" 3'-6"
4'-6"
3'-6"
9SEE NOTE 21
SEE NOTE 16
SEE NOTE 16
MASTER INTERCOM AT
DECON STATION
CONTROL AREA
802-4844759 C94421B
AS NOTED 5 6
SHOWERS
9 SEE NOTE 21
SEE NOTE 16
INNER GARMENT
REMOVAL AREA (IGRA)
EXIT TO SHIP
INTERIOR
WEATHER ENTRANCE
ENTRANCE FROM SHIP INTERIOR
(SECURED DURING DECON OPS)
OUTER GARMENT
REMOVAL AREA
(OGRA)
CONTAMINATION
CONTROL
AREA (CCA)
8'-0"
FWD
DECON
SHOWER
AREA
D
3436 33 313235
C
B
A
3436 33 313235
D
C
B
A
802-4844759 C94421B
AS NOTED 6 6
SHOWERSHOWER
FROM COLD WATER
FW SYSTEM
SHOWER NOZZLESEE NOTE 20
SHOWER NOZZLE
SEE NOTE 8
1'-0"
1'-0"
3'-0"
5'-0"
BRACING TO BULKHEAD
BRACING TO BULKHEAD
6'-0"
4'-0"
2'-0"
2'-0"
3'-0"
| SHEET 1 |
| SHEET 2 |
| SHEET 3 |
| SHEET 4 |
| SHEET 5 |
| SHEET 6 |
File details come from the government source that posted it. Updated .