J - 2 Category A Items NEWPORT 21R4209 MTA..xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- N3220521R4209
About this file
This document contains a contractor price breakdown for category A items required for the USNS Newport (T-EPF 12) Mid-Term Availability (MTA). The Navy's Military Sealift Command is soliciting services including hull inspections, welding inspection, underwater hull cleaning and inspection, machinery maintenance, electrical modifications, communication and navigation equipment installation, auxiliary systems maintenance, HVAC and refrigeration maintenance, and general shipboard services. Pricing is provided by line item with labor hours and material costs for both prime and subcontractors. Category A items refer only to services required for the MTA. The solicitation number is N3220521R4209 and references to the full solicitation are available upon request.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A Items
| ITEM NO. | GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | ||||
| TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | |||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS | NSP | ||||||||||
| 002 | TECHNICAL AND MANUFACTURER'S REPRESENTATIVES | NSP | ||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | ||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | ||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | ||||||||||
| 006 | HEAVY WEATHER PLAN | NSP | ||||||||||
| 007 | COLD WEATHER PLAN | NSP | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | GENERAL SERVICES FOR SHIP | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS SUPPORT (ILS) | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILTY | NSP | ||||||||||
| 090 | COVID CLEANING SERVICES | |||||||||||
| Subtotal 000 - 099 | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | 0 | $0 | $0 | |
| 100 | HULL STRUCTURE | |||||||||||
| 101 | STRUCTURAL INSPECTIONS (ANNUAL) | |||||||||||
| 103 | ALUMINUM WELDING INSPECTOR PROVIDE | |||||||||||
| 106 | TEPF_CSI_UNDERWATER HULL INSPECTION AND CLEANING (0.5 YR) | |||||||||||
| 109 | TEPF_CSI_AFT PEAK PLANKING REPLACEMENT | |||||||||||
| 111 | SSDG to AMR Hatch Modifications (MLOC) | |||||||||||
| 112 | Maintenance Access for Navigation Lights (MLOC) | |||||||||||
| Subtotal 100 - 199 | 0 | $ - | $ - | 0 | $ - | $ - | $ - | $ - | 0 | $ - | $ - | |
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | CLEAN HEAT EXCHANGERS (1YR) | |||||||||||
| Subtotal 200 - 299 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 300 | ELECTRICAL | |||||||||||
| 307 | VSD POWER CABLE AND GROUNDING MODIFICATIONS | |||||||||||
| Subtotal 300 -399 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |
| 400 | COMMUNICATION & NAVIGATION | |||||||||||
| 404 | N6 ECDIS DIRECT-WIRE CONNECTION TO PRIMARY |
NAVIGATION SENSORS
405 N6 INSTALLATION OF SHIP SECURITY ALERT SYSTEM FURUNO
FELCOM-19SAT C RELOCATION
| Subtotal 400 - 499 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 500 | MACHINERY, AUXILIARY SYSTEM | |||||||||||
| 503 | SEWAGE PLANT MAINTENANCE (1 YR) | |||||||||||
| 504 | FIREMAIN NON-RETURN VALVES | |||||||||||
| 507 | Fuel System Mods | |||||||||||
| 515 | HEF ER MORIN VALVE RELOCATION | |||||||||||
| 517 | VACUUM SEWAGE COLLECTION SYSTEM |
MAINTENANCE (1 YR)
| 520 | HEF DAMPER FUSIBLE LINK REMOVAL |
| 521 | FIRE STATION ISOLATION VALVES |
| 532 | INSPECT SUBMERSIBLE BILGE PUMPS (CONFINED |
SPACES - FOREPEAKS AND VOIDS) (1 YR)
| Subtotal 500 - 599 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 800 | HVAC AND REFRIGERATION SYSTEM MAINTENANCE | |||||||||||
| 801 | HVAC AND REFRIGERATION SYSTEM |
MAINTENANCE (1 YR)
| 802 | MACHINERY SPACE PLENUM CLEANING (1 YR) | |||||||||||
| 805 | CHANGES TO AC PLANT | |||||||||||
| 852 | ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| Subtotal 800 - 899 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| TOTAL CAT "A" | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| PRIME/SUB Breakdown | % | ||||||||||
| PRIME Percentage | - | ||||||||||
| SUB Percentage | - |
| &"Times New Roman,Regular"&12USNS CITY OF BISMARCK (T-EPF 9) MTA | &"Times New Roman,Regular"&14CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | N3220519R6712 |
CATEGORY "A" ITEMS ONLY J-2 Attachment
File details come from the government source that posted it. Updated .