This document is an amendment to a solicitation for the USNS NEWPORT (T-EPF 12) Mid-Term Availability (MTA). The amendment provides answers to questions from potential offerors. Nineteen heat exchangers require cleaning, fabrication of new fittings, and installation. The coating area references in section 7.9.1 should refer to paragraphs 3.1.2 and 3.1.3, not 3.1.1 and 3.1.2. There is an estimated 13,640 linear feet of edge grinding and 10 square feet of coating required per bilge pocket, totaling 380 square feet. The Department of the Navy Military Sealift Command issued the solicitation.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220521R4209
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
Q AND A RESPONSES #4 AND #5
QUESTION #1: 7.1.7.1- Is there an allowance for the amount of Belzona application is to be required?
7.2.1- How many linear feet of edge grinding is to be required?
SPECIFICATION ITEM NO.: 108
PARAGRAPH / SECTION NO: 7.1.7.1& 7.2.1
TITLE: Machinery Space Coating
ANSWER: 7.1.7.1 - 10 square feet per bilge pocket (380 sqft total)
7.2.1 - Estimate approximately 13640 linear feet. Note: This is an approximate estimate based on General Ship Drawings.
QUESTION #2: Paragraph 3.1.2 v. 3.2: Paragraph 3.1.2 calls for 15 heat exchangers while paragraph 3.2 adds up to 19. Please clarify how many units total are being worked.
SPECIFICATION ITEM NO.: 201
PARAGRAPH / SECTION NO: Multiple
TITLE: Heat exchangers
ANSWER: 3.1.2 is incorrect. 3.2 is correct. There are 19 total. No “cleaning in place” fittings were installed at new construction, so the contractor will need to fabricate and install them.
QUESTION #3: Is paragraph 7.9.1 supposed to reference “paragraphs 3.1.2 and 3.1.3” instead of “paragraphs 3.1.1 and 3.1.2, as 3.1.1 would mean a far greater amount of area?
SPECIFICATION ITEM NO.: 989
PARAGRAPH / SECTION NO: 7.9.1
TITLE: Hull Coating
ANSWER: Correct, paragraph 7.9.1 should refer to paragraphs 3.1.2 and 3.1.3.
(End of Summary of Changes) image1.wmf