J - 1 Work Item (Specifications).docx
DOCX document 36 KB Posted
- Solicitation number
- N3220521R4209
About this file
This document outlines specifications for a mid-term availability contract for the USNS Newport (T-EPF 12). The specifications include requirements across several categories and sections for hull structure, propulsion machinery, electrical systems, communications and navigation aids, auxiliary systems, outfitting and habitability, sponsor equipment, HVAC, and drydocking. Products and services include structural inspections, welding inspection, flight deck modifications, machinery space coating, electrical upgrades, communication systems installation, auxiliary piping modifications, refrigeration maintenance, and drydocking services. The solicitation was issued by the Department of the Navy Military Sealift Command for the work to be completed between 2022 and 2024. Pricing will be on a firm-fixed price basis.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND - NORFOLK
NORFOLK, VIRGINIA
S P E C I F I C A T I O N S
FOR
USNS NEWPORT (EPF 12)
24 JAN 2022 PSA
PRINCIPAL DIMENSIONS
LENGTH 103.0 m (337.9 ft.)
BEAM 28.5 m (93.5 ft.)
DRAFT FULL LOAD (mean) 3.92 m (12.85 ft.)
ESTIMATED GROSS TONNAGE 2500 TONNES
DESIGN DEADWEIGHT 9154 TONNES
| ESTIMATED ARRIVAL DRAFT | 3.4M (11.0 FT) FWD |
| 3.4M (11.0 FT) Aft |
AIR DRAFT WITH MAST DOWN 25.3M (83 ft.)
THIS SPECIFICATION CONSISTS OF THE FOLLOWING PAGES
INDEX PAGES 2 THRU 5
| SECTION 000 | GENERAL REQUIREMENTS | |
| NOT SEPERATELY PRICED (NSP) REQUIREMENTS | Category | |
| 001 | INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP |
| 006 | HEAVY WEATHER PLAN | NSP |
| 007 | COLD WEATHER PLAN | NSP |
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (NSP) | NSP |
CATEGORY “A” WORK ITEMS
| 010 | FURNISH OFFICE FOR OMT | A |
| 011 | GENERAL SERVICES FOR SHIP | A |
| 012 | INFORMATION TECHNOLOGY SERVICES | A |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | A |
| 014 | WEIGHT AND MOMENT REPORT | A |
| 015 | INTEGRATED LOGISTICS SUPPORT (ILS) | A |
| 016 | FIRE PROTECTION AND SHIP SAFETY PROGRAM | A |
| 017 | HANDLING SHIPS STORES | A |
| 018 | DELIVERY AND REDELIVERY | A |
| 019 | SHIPBOARD ACCESS AND SECURITY | A |
| 020 | GAS FREE CERTIFICATES | A |
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, AND COFFERDAMS | A |
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | A |
| 023 | HAZARDOUS WASTE DISPOSAL | A |
| 090 | COVID CLEANING SERVICES | A |
CATEGORY “B” WORK ITEMS
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY | B | |
| 026 | VESSEL FINAL COVID CLEANING (B) | B | |
| 030 | CONTINUATION OF SERVICES (B) | B |
| SECTION 100 | HULL STRUCTURE | ||
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 101 | STRUCTURAL INSPECTION (ANNUAL) | N/A | A |
| 102 | AVIATION FACILITY SUPPORT (1 YR) | N/A | A |
| 103 | ALUMINUM WELDING INSPECTOR PROVIDE | N/A | A |
| 104 | SHELL LEVEL ACCESS CATWALKS (PSA) | 13-006 | A |
| 105 | FLIGHT DECK TIE DOWN INSPECTION (ANNUAL) | N/A | A |
| 107 | TOWING ARRANGEMENT MODIFICATIONS (MLOC) | 17-026 | A |
| 108 | MACHINERY SPACE COATING | N/A | A |
| 109 | STBD TRANSOM MOORING FAIRLEAD | 16-062 | A |
| 110 | PUMP ROOM 7 AND 8 INCLINED LADDERS | 15-098 | A |
| 111 | SSDG to AMR Hatch Modifications (MLOC) | 16-033 | A |
| 112 | Maintenance Access for Navigation Lights (MLOC) | 13-028 | A |
| 114 | Grease Interceptor Replacement (AER) | 17-105 | A |
| 115 | ACCESS DOORS FOR RESCUE PADEYES | 16-097 | A |
| 116 | RIDE CONTROL ROOM HULL MODIFICATION | 20-236 | A |
| 152 | ABS ANNUAL SURVEY - TANK INSPECTION | N/A | A |
| 163 | FLIGHT DECK SAFETY NET INSPECTION AND TEST (1 YR) | N/A | A |
SECTION 200 PROPULSION MACHINERY
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 201 | CLEAN HEAT EXCHANGERS (1YR) | N/A | A |
| 203 | CORIOLIS FUEL METERS (PSA) | 13-010 | A |
| SECTION 300 | ELECTRICAL | ||
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 301 | ADDITIONAL ELECTRICAL OUTLETS | 13-004 | A |
| 302 | AFP CONTAINERS ELECTRICAL INTERFACE MODS | 19-219 | A |
| 303 | NIGHT LIGHTING IN MISSION BAY (MLOC) | 13-014 | A |
| 304 | HULL PERIMETER SECURITY LIGHTING | 13-016 | A |
| 305 | INSTALL PILOT LADDER ILLUMINATION | 16-104 | A |
| 306 | MISSION BAY LED LIGHTS CONVERSION | 18-189 | A |
| 307 | VSD POWER CABLE AND GROUNDING MODIFICATIONS | 17-163 | A |
| 308 | WATERJET FEEDBACK CABLE JUNCTION BOXES (AER) | N/A | A |
| 310 | MB FIRE DETECTION PANEL INSTALL | N/A | A |
| 311 | MB COMMUNICATIONS PANEL INSTALL | N/A | A |
| SECTION 400 | COMMUNICATION AND NAVIGATIONAL AIDS | ||
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 404 | N6 ECDIS DIRECT-WIRE CONNECTION TO PRIMARY | ||
| NAVIGATION SENSORS | 16-101 | A | |
| 405 | N6 INSTALLATION OF SHIP SECURITY ALERT SYSTEM FURUNO | ||
| FELCOM-19SAT C RELOCATION | 15-078 | A | |
| 406 | eCONSOLE INTERFACE TO IMCS | 17-143 | A |
| 459 | ECHO SOUNDER SERVICE (2.5 YR) | N/A | A |
| SECTION 500 | AUXILIARY SYSTEMS | ||
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 501 | AFP PW AND CHT MODS | 14-073 | A |
| 502 | JP5 PIPING MODIFICATIONS | 14-067 | A |
| 503 | SEWAGE PLANT MAINTENANCE (1 YR) | N/A | A |
| 504 | FIREMAIN NON-RETURN VALVES | 16-077 | A |
| 505 | CHT TANK SUCTION AND WASH DOWN MODIFICATION | 17-155 | A |
| 506 | GREY WATER 3-WAY VALVE | 13-021 | A |
| 507 | FUEL SYSTEM MODS | 13-046 | A |
| 508 | INSTALL WASTE OIL TRANSFER PUMP STRAINERS | 16-054 | A |
| 509 | DFM BUNKERING LINES SIZE INCREASE | 16-063 | A |
| 510 | REFRIGERATION SYSTEM FIREMAIN CROSSOVER | 16-066 | A |
| 512 | STERN RAMP MAINTENANCE (1 YR) (SCSI) | N/A | A |
| 514 | CHT TRANSFER PUMP | 16-093 | A |
| 515 | HEF ER MORIN VALVE RELOCATION | 16-106 | A |
| 517 | VACUUM SEWAGE COLLECTION SYSTEM | ||
| MAINTENANCE (1 YR) | N/A | A | |
| 520 | HEF DAMPER FUSIBLE LINK REMOVAL | 18-200 | A |
| 521 | FIRE STATION ISOLATION VALVES | 16-115 | A |
| 522 | REPLACE STERN RAMP HYDRAULIC TUBING | 16-117 | A |
| 523 | SSAC MAINTENANCE LIGHTS RESET PUSHBUTTONS | 17-161 | A |
| 532 | INSPECT SUBMERSIBLE BILGE PUMPS (CONFINED | ||
| SPACES - FOREPEAKS AND VOIDS) (1 YR) | N/A | A |
SECTION 600 OUTFIT, FURNISHINGS AND HABITABILITY
| CATEGORY “A” WORK ITEMS | T-ALT | CATEGORY | |
| 603 | HABITABILITY QOL UPGRADES | 17-013 | A |
SECTION 700 SPONSOR EQUIPMENT
| CATEGORY “A” WORK ITEMS | T-ALT | CATEGORY | |
| 701 | READY SERVICE MAGAZINE INTERFACE TO SHIPS | ||
| FIREMAIN AND 208V | 18-186 | A | |
| 702 | MODIFICATIONS FOR RSL INSTALLS | 17-139 | A |
| 704 | TSCIF INSTALLATION | 16-124 | A |
SECTION 800 HVAC
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 801 | HVAC AND REFRIGERATION SYSTEM | ||
| MAINTENANCE (1 YR) | A | ||
| 802 | MACHINERY SPACE PLENUM CLEANING (1 YR) | A | |
| 803 | AC CHILL WATER UNIT MOUNTS | 18-184 | A |
| 804 | TSCIF HVAC UPGRADE | 17-152 | A |
| 805 | CHANGES TO AC PLANT | 18-188 | A |
| 806 | 03 LEVEL AC DISTRIBUTION MODIFICATIONS | 13-019 | A |
| 852 | ANNUAL LAUNDRY VENT CLEANING | N/A | A |
SECTION 900 DRYDOCK
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 0901 | TEPF_CCSI_DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YR) | N/A | A |
| 0902 | TEPF_CSI_RIDE CONTROL SYSTEM (RCS) MAINTENANCE (2 YR) | N/A | A |
| 0903 | TEPF_CSI_INSPECT SEA VALVES AND SEA CHEST (2.5 YR) | N/A | A |
| 0904 | TEPF_CCSI_CATHODIC PROTECTION SYSTEM (2.5 YR) | N/A | A |
| 0907 | HULL MARKINGS TO SUPPORT UWILD CERTIFICATION | 13-002 | A |
| 0910 | TEPF_CSI_REPLACE ANODES (2.5 YR) | N/A | A |
| 0911 | TEPF_CSI_SPEED LOG SYSTEM MAINTENANCE (2.5 YR) | N/A | A |
| 0929 | TEPF_CSI_WATERJET MAINTENANCE INTERIM | ||
| DRYDOCKING (2.5 YR) (SCSI) | N/A | A | |
| 0966 | TEPF_CCSI_SHAFT ALIGNMENT AND BEARING REACTION | ||
| CHECKS (2.5YR) (SCSI) | N/A | A | |
| 0989 | TEPF_CSI_UNDERWATER HULL CLEANING AND | ||
| PAINTING - SPOT BLAST (2.5 YR) | N/A | A |
SECTION 1000 UNDERWAY REPLENISHMENT GEAR
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 1001 | UNREPVERTREP EQUIPMENT AND SYSTEM TESTING (1 YR) | N/A | A |