J - 2 Category A Items NEWPORT 21R4209.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- N3220521R4209
About this file
This document contains a contractor price breakdown for Category A items for the USNS Newport (T-EPF 12) Mid-Term Availability (MTA). The contractor is required to provide various general requirements, hull structure, machinery, electrical, communications and navigation, auxiliary systems, outfitting and habitability, sponsor equipment, HVAC, docking, and UNREP items and services. Pricing is broken down by labor hours and materials for prime contractor and subcontractor work. No overall pricing totals are included, but the contractor must specify the percentage of work to be performed by prime versus subcontractors. The Navy's Military Sealift Command issued solicitation number N3220521R4209 for the mid-term maintenance availability of the USNS Newport to be performed at the contractor's private facility.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A Items
| ITEM NO. | GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | ||||
| TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | |||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS | NSP | ||||||||||
| 002 | TECHNICAL AND MANUFACTURER'S REPRESENTATIVES | NSP | ||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | ||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | ||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | ||||||||||
| 006 | HEAVY WEATHER PLAN | NSP | ||||||||||
| 007 | COLD WEATHER PLAN | NSP | ||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILTY | NSP | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | GENERAL SERVICES FOR SHIP | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS SUPPORT (ILS) | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL | |||||||||||
| 090 | COVID CLEANING SERVICES | |||||||||||
| Subtotal 000 - 099 | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | 0 | $0 | $0 | |
| 100 | HULL STRUCTURE | |||||||||||
| 101 | STRUCTURAL INSPECTIONS (ANNUAL) | |||||||||||
| 102 | AVIATION FACILITY SUPPORT (1 YR) | |||||||||||
| 103 | ALUMINUM WELDING INSPECTOR PROVIDE | |||||||||||
| 104 | SHELL LEVEL ACCESS CATWALKS (PSA) | |||||||||||
| 105 | FLIGHT DECK TIE DOWN INSPECTION (ANNUAL) | |||||||||||
| 107 | TOWING ARRANGEMENT MODIFICATIONS (MLOC) | |||||||||||
| 108 | MACHINERY SPACE COATING | |||||||||||
| 109 | STBD Transom Mooring Fairlead | |||||||||||
| 110 | PUMP ROOM 7 AND 8 INCLINED LADDERS | |||||||||||
| 111 | SSDG to AMR Hatch Modifications (MLOC) | |||||||||||
| 112 | Maintenance Access for Navigation Lights (MLOC) | |||||||||||
| 114 | Grease Interceptor Replacement (AER) | |||||||||||
| 115 | ACCESS DOORS FOR RESCUE PADEYES | |||||||||||
| 116 | RIDE CONTROL ROOM HULL MODIFICATION | |||||||||||
| 152 | ABS ANNUAL SURVEY - TANK INSPECTION | |||||||||||
| 163 | FLIGHT DECK SAFETY NET INSPECTION AND TEST (1 YR) | |||||||||||
| Subtotal 100 - 199 | 0 | $ - | $ - | 0 | $ - | $ - | $ - | $ - | 0 | $ - | $ - | |
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | CLEAN HEAT EXCHANGERS (1YR) | |||||||||||
| 203 | Coriolis Fuel Meters (PSA) | |||||||||||
| Subtotal 200 - 299 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 300 | ELECTRICAL | |||||||||||
| 301 | ADDITIONAL ELECTRICAL OUTLETS | |||||||||||
| 302 | AFP CONTAINERS ELECTRICAL INTERFACE MODS | |||||||||||
| 303 | NIGHT LIGHTING IN MISSION BAY (MLOC) | |||||||||||
| 304 | HULL PERIMETER SECURITY LIGHTING | |||||||||||
| 305 | INSTALL PILOT LADDER ILLUMINATION | |||||||||||
| 306 | MISSION BAY LED LIGHTS CONVERSION | |||||||||||
| 307 | VSD POWER CABLE AND GROUNDING MODIFICATIONS | |||||||||||
| 308 | WATERJET FEEDBACK CABLE JUNCTION BOXES (AER) | |||||||||||
| 310 | MB FIRE DETECTION PANEL INSTALL | |||||||||||
| 311 | MB COMMUNICATIONS PANEL INSTALL | |||||||||||
| Subtotal 300 -399 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 400 | COMMUNICATION & NAVIGATION | |||||||||||
| 404 | N6 ECDIS DIRECT-WIRE CONNECTION TO PRIMARY |
NAVIGATION SENSORS
405 N6 INSTALLATION OF SHIP SECURITY ALERT SYSTEM FURUNO
FELCOM-19SAT C RELOCATION
| 406 | eCONSOLE INTERFACE TO IMCS | |||||||||||
| 459 | ECHO SOUNDER SERVICE (2.5 YR) | |||||||||||
| Subtotal 400 - 499 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 500 | MACHINERY, AUXILIARY SYSTEM | |||||||||||
| 501 | AFP PW and CHT Mods | |||||||||||
| 502 | JP5 PIPING MODIFICATIONS | |||||||||||
| 503 | SEWAGE PLANT MAINTENANCE (1 YR) | |||||||||||
| 504 | FIREMAIN NON-RETURN VALVES | |||||||||||
| 505 | CHT Tank Suction and Wash Down Modification | |||||||||||
| 506 | GREY WATER 3-WAY VALVE | |||||||||||
| 507 | Fuel System Mods | |||||||||||
| 508 | INSTALL WASTE OIL TRANSFER PUMP STRAINERS | |||||||||||
| 509 | DFM BUNKERING LINES SIZE INCREASE | |||||||||||
| 510 | REFRIGERATION SYSTEM FIREMAIN CROSSOVER | |||||||||||
| 512 | STERN RAMP MAINTENANCE (1 YR) (SCSI) | |||||||||||
| 514 | CHT TRANSFER PUMP | |||||||||||
| 515 | HEF ER MORIN VALVE RELOCATION | |||||||||||
| 517 | VACUUM SEWAGE COLLECTION SYSTEM |
MAINTENANCE (1 YR)
| 520 | HEF DAMPER FUSIBLE LINK REMOVAL |
| 521 | FIRE STATION ISOLATION VALVES |
| 522 | REPLACE STERN RAMP HYDRAULIC TUBING |
| 523 | SSAC MAINTENANCE LIGHTS RESET PUSHBUTTONS |
| 532 | INSPECT SUBMERSIBLE BILGE PUMPS (CONFINED |
SPACES - FOREPEAKS AND VOIDS) (1 YR)
| Subtotal 500 - 599 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 600 | OUTFIT, FURNISHING AND HABITABILITY | |||||||||||
| 603 | HABITABILITY QOL UPGRADES | |||||||||||
| Subtotal 600 - 699 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 700 | SPONSOR EQUIPMENT | |||||||||||
| 701 | READY SERVICE MAGAZINE INTERFACE TO SHIPS |
FIREMAIN AND 208V
| 702 | MODIFICATIONS FOR RSL INSTALLS | |||||||||||
| 704 | TSCIF INSTALLATION | |||||||||||
| Subtotal 700 - 799 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 800 | HVAC AND REFRIGERATION SYSTEM MAINTENANCE | |||||||||||
| 801 | HVAC AND REFRIGERATION SYSTEM |
MAINTENANCE (1 YR)
| 802 | MACHINERY SPACE PLENUM CLEANING (1 YR) | |||||||||||
| 803 | AC Chill Water Unit Mounts | |||||||||||
| 804 | TSCIF HVAC UPGRADE | |||||||||||
| 805 | CHANGES TO AC PLANT | |||||||||||
| 806 | 03 LEVEL AC DISTRIBUTION MODIFICATIONS | |||||||||||
| 852 | ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| Subtotal 800 - 899 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 900 | DOCKING AND UNDOCKING | |||||||||||
| 901 | TEPF_CCSI_DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YR) | |||||||||||
| 902 | TEPF_CSI_RIDE CONTROL SYSTEM (RCS) MAINTENANCE (2 YR) | |||||||||||
| 903 | TEPF_CSI_INSPECT SEA VALVES AND SEA CHEST (2.5 YR) | |||||||||||
| 904 | TEPF_CCSI_CATHODIC PROTECTION SYSTEM (2.5 YR) | |||||||||||
| 907 | HULL MARKINGS TO SUPPORT UWILD CERTIFICATION | |||||||||||
| 910 | TEPF_CSI_REPLACE ANODES (2.5 YR) | |||||||||||
| 911 | TEPF_CSI_SPEED LOG SYSTEM MAINTENANCE (2.5 YR) | |||||||||||
| 929 | TEPF_CSI_WATERJET MAINTENANCE INTERIM |
DRYDOCKING (2.5 YR) (SCSI)
966 TEPF_CCSI_SHAFT ALIGNMENT AND BEARING REACTION
CHECKS (2.5YR) (SCSI)
989 TEPF_CSI_UNDERWATER HULL CLEANING AND
PAINTING - SPOT BLAST (2.5 YR)
| Subtotal 900 - 999 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | |
| 1000 | UNREP | |||||||||||
| 1001 | UNREPVERTREP EQUIPMENT AND SYSTEM TESTING (1 YR) | |||||||||||
| Subtotal 1001 - 1005 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| TOTAL CAT "A" | 0 | - 0 | - 0 | 0 | - 0 | - 0 | - 0 | - 0 | 0 | - 0 | - 0 |
| PRIME/SUB Breakdown | % | ||||||||||
| PRIME Percentage | - | ||||||||||
| SUB Percentage | - |
| &"Times New Roman,Regular"&12USNS CITY OF BISMARCK (T-EPF 9) MTA | &"Times New Roman,Regular"&14CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | N3220519R6712 |
CATEGORY "A" ITEMS ONLY J-2 Attachment