Amendment 0008 USNS NEWPORT MTA N3220521R4209.docx

DOCX document 92 KB Posted

Attached to
USNS NEWPORT (T-EPF 12) Mid-Term Availability (MTA)
Solicitation number
N3220521R4209
Issued by

About this file

This document is a solicitation for a Mid-Term Availability (MTA) for the USNS NEWPORT (T-EPF 12). The Navy seeks ship repair and alteration services at the contractor's facility, including Category A work items for project planning, ship services, and hazardous waste disposal. Optional Category B work items include physical security, vessel cleaning, and continuation of services. Offerors must submit technical and price proposals by 9 December 2021 addressing factors for understanding the statement of work, ability to perform, management controls, and past performance. Price will be evaluated for reasonableness using a lowest-price technically acceptable approach. The contractor must demonstrate experience in ship repair, planning, engineering, quality assurance, and testing/trials. The work must be completed within 128 days of ship arrival at the contractor's yard, anticipated on 25 April 2022.

View the file

Other files

File Type Posted
Amendment 0011 USNS NEWPORT MTA 21R4209.docx DOCX document
Amendment 0010 USNS NEWPORT MTA N3220521R4209.docx DOCX document
Q and A Response 7..docx DOCX document
Amendment 0009 USNS NEWPORT N3220521R4209.docx DOCX document
J - 2 Category A Items NEWPORT 21R4209 MTA..xlsx XLSX spreadsheet
J - 1 Work Item Specifications NEWPORT MTA 21R4209.docx DOCX document
J - 4 GFP NEWPORT 21R4209 MTA.xlsx XLSX spreadsheet
JA for USNS NEWPORT 2022 MTA RD.pdf PDF
J - 3 Category B Items NEWPORT 21R4209 MTA.xlsx XLSX spreadsheet
Amendment 0007 N3220521R4209.pdf PDF
Amendment 0006 N3220521R4209.pdf PDF
Amendment 0005 N3220521R4209.pdf PDF
Q and A 5.docx DOCX document
Amendment 0004 N3220521R4209.docx DOCX document
Q and A 4.docx DOCX document
N3220521R4209 Amendment 0003.docx DOCX document
Q and A 3.docx DOCX document
N3220521R4209 Amendment 0002.docx DOCX document
N3220521R4209 Amendment 0001.docx DOCX document
Q and A Responses 2..docx DOCX document
Q and A Responses 1.docx DOCX document
RELEASED SOLICITATION - USNS NEWPORT N3220521R4209.docx DOCX document
RELEASED SOLICITATION - USNS NEWPORT N3220521R4209.docx DOCX document
JA for USNS NEWPORT 2022 PSA RD.pdf PDF
J - 2 Category A Items NEWPORT 21R4209.xlsx XLSX spreadsheet
J - 11 Dry Dock Evaluation Form - NEWPORT 21R4209.docx DOCX document
J - 9 Disclosure of Lobbying Activities - NEWPORT 21R4209.doc DOC document
J - 13 Past Performance Questionnaire - NEWPORT 21R4209.docx DOCX document
J- 7 MSC Ship Repair Facility Survey - NEWPORT 21R4209.docx DOCX document
J - 14 Technical Data Non-Disclosure - NEWPORT 21R4209.docx DOCX document
J-6.zip ZIP file
J - 4 GFP NEWPORT 21R4209.xlsx XLSX spreadsheet
J - 10 Interport Differential - NEWPORT 21R4209.doc DOC document
SOLICITATION - USNS NEWPORT N3220521R4209.docx DOCX document
J - 12 Past Performance Data - NEWPORT 21R4209.doc DOC document
J - 1 Work Item (Specifications).docx DOCX document
J - 8 Request for Spec Clarification - NEWPORT 21R4209.doc DOC document
J - 3 Category B Items NEWPORT 21R4209.xls XLS spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
40

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

27-Oct-2021

4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO.(If applicable)
6. ISSUED BYCODE
N32205
7. ADMINISTERED BY (If other than item 6)CODE

MILITARY SEALIFT COMMAND NORFOLK 471 EAST C. STREET

BLDG. SP-64

NAVAL STATION NORFOLK NORFOLK VA 23511

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code)
X
9A. AMENDMENT OF SOLICITATION NO.

N3220521R4209

X
9B. DATED (SEE ITEM 11)

26-Jul-2021

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT S/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment 0008 is as follow s:

1. USNS NEWPORT PSA is being de-scoped to a Mid-Term Availability (MTA)

2. Solicitation closing date is being extended to 09 December 2021

3. RFC closing date is being changed to 24 November 2021.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED
16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

27-Oct-2021

EXCEPTION TO SF 30 APPROVED BY OIRM 11-84

30-105-04

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA FAR (48 CFR) 53.243

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION / CONTRACT FORM

The required response date/time has changed from 30-Nov-2021 12:00 PM to 09-Dec-2021 12:00 PM. The depository location has changed from N/A - Received VIA DoD SAFE to N/A - Received VIA DOD

SAFE.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001

Category "A" WIs FFP Prepare for and accomplish the MTA of the USNS NEWPORT (T-EPF) Total Category "A" WIs $

Proposed unit price per KWh of electrical shore power $IAW WI 0011, 7.1.1. Proposed unit price per gallon of potable water $IAW WI 0011, 7.1.3.
Proposed unit price per gallon of distilled water $IAW WI 0011, 7.1.4. Proposed unit price per gallon of bilge water removal $IAW WI 0011, 7.1.18. Proposed unit price per crane usage $IAW WI 0011, 7.9.1
Proposed Hazardous Waste handling fee rate IAW WI 0023, 7.4.3.%

CDRLs FOR CLINs INCLUDING OPTION CLINs, IF EXERCISED:

The data to be furnished hereunder shall be prepared and submitted IAW the CDRL, DD Form 1423, Exhibit A, attached hereto. The CDRLs form a part of the schedule of this solicitation.

SEE PARAGRAPH 1.

FOB: Destination

NET AMT

N3220521R4209 Page of

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0002

AGR and ODC FFP

AGR

(10,000) man-hours @ $ per man-hour = $

ODC

Base $500,000

Proposed G&A Rate%
Subtotal:$
Proposed Profit Rate%
Subtotal:$

SEE PARAGRAPH 2, 3, AND 4.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0003

Category "B" WI 0025 FFP WI 0025 - Physical Security at Private Contractor's Facility in FPCON Charlie - Delta

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

SEE PARAGRAPH 5.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0004

Category "B" WI 0026 FFP WI 0026 - Final Vessel Cleaning

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0005

Category "B" WI 0030 FFP WI 0030 - Continuation of Services

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0006

Category "B" WI 0107 FFP WI 0107 – Towing Arrangement Modifications (MLOC)

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0007

Category "B" WI 0114 FFP WI 0114 – Grease Interceptor Replacement (AER)

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE 0008

Category "B" WI 0115 FFP WI 0115 – Access Doors for Rescue Padeyes

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE A 0009

Category "B" WI 0301 FFP WI 0301 - Additional Electrical Outlets

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0010

Category "B" WI 0302 FFP WI 0302 – AFP Containers Electrical Interface Mods

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0011

Category "B" WI 0303 FFP WI 0303 – Night Lighting in Mission Bay (MLOC)

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0012

Category "B" WI 0304 FFP WI 0304 – Hull Perimeter Security Lighting

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0013

Category "B" WI 0306 FFP WI 0306 – Mission Bay Led Lights Conversion

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0014

Category "B" WI 0310 FFP WI 0310 – MB Fire Detection Panel Install

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0015

Category "B" WI 0311 FFP WI 0311 – MB Communications Panel Install

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0016

Category "B" WI 0501 FFP WI 0501 – AFP PW and CHT MODS

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0017

Category "B" WI 0701 FFP WI 0701 – Ready Service Magazine Interface to Ships Firemain and 208V

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0018

Category "B" WI 0702 FFP WI 0702 – Modifications for RSL Installs

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0018 $

The contractor shall enter the total proposed price of all CLINs.

Section B, Price Schedule, detailed information

1. Attachment J-2, Category “A” WIs, provides a WI breakdown of CLIN 0001 pricing.

2. AGR and ODC

a. This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated during the contract. Changes are inherent to vessel repair contracts and should be expected by Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing

N3220521R4209 Page of

CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

b. Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support

Supervision

c. Consumable materials are goods used in the ordinary course of work performance that do not become an integral part of the repaired vessel (e.g., office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, paint buckets, paint brushes, protective clothing). Consumable material shall be included in the contractor's FBLR and not separately priced.

d. The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The ACO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

e. The base cost stated in this CLIN does not include profit or G&A rates.

f. This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

3. AGR details.

a. The Government may utilize CLIN 0002 for, and not limited to, man-hours generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. AGR does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 AGR man-hours, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with ODC, and therefore will be performed concurrently.

b. As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders AGR pursuant to this CLIN, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time as may be granted, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the ACO to take any of the three (3) options set forth in subparagraph

“d” below. AGR proposals shall be priced using the FBLR set forth in Section B, CLIN 0002. The rate established in CLIN 0002 will be used in evaluating the contractor's proposal and for negotiating changes. As part of the contractor’s proposal submission for AGR, the following shall be included:

· FBLR

· Proposed Labor Mix/Categories

· Proposed Man Hours

· Total Proposed AGR

c. Considering FBLRs have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) as a result of the mix of labor categories and man-hours, the subsequent AGR price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “d”, below.

d. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government;

2) Issue a unilateral modification; or

3) Cancel the requirement.

e. The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at the contractor's facility. Furthermore, in cases described in subparagraphs “d.1” and “d.2” above, the contractor waives any right to claims of interference under the DFARS 252.217-7011 - Access to Vessels.

f. The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for AGR (CLIN 0002). Settlement of AGR (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the ACO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0005 at contract completion shall be de-obligated.

4. ODC details.

a. The Government may utilize CLIN 0002 for and not limited to, material and equipment generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. ODC does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 ODC, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with AGR, and therefore will be performed concurrently.

b. As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders ODC pursuant to this CLIN, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the ODC and will permit the ACO to take any of the three options set forth in subparagraph “e” below. As part of the contractor’s proposal submission for ODCs, the following shall be included:

MaterialEquipment
-Part number- Part number
-Order quantity- Order quantity
-Unit price- Unit price
-Total price- Total price

Other Direct Costs not captured above

· Travel

· Per diem (lodging, M&IE daily rates)

· Subcontractor Proposal Breakdown shall include but not be limited to, Material (Part number, Order Quantity, Unit Price, and Total Price), equipment (Part Number, Order Quantity, Unit Price, and Total Price), labor (FBLR, Proposed Labor Mix/Categories, and Proposed Manhours), and ODC (Travel and Per Diem)

The G&A and profit rates proposed shall be the same as the rates provided under CLIN 0002.

c. The contractor shall demonstrate due diligence in the assessment, evaluation, and determination resulting in the proposed utilization of other than local specialized labor resources. Only with ACO approval to proceed will a contractor, technical representative, or subcontractor be reimbursed for reasonable per diem costs (transportation, travel expenses, lodging, meals, and incidental expenses) required in connection with the associated change order. Per diem costs are considered reasonable, allowable, and reimbursable only to the extent that they do not exceed the allowed per diem rate in effect at the time of travel as set forth in the JTR.

d. Considering G&A and profit rates have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of ODCs proposed to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) the price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “e”, below.

e. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government;

2) Issue a unilateral modification; or

3) Cancel the requirement.

f. The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing this work at the contractor's facility. Furthermore, in cases described in subparagraphs “e.1” and “e.2” above, the contractor waives any right to claims of interference under the DFARS 252.217-7011 - Access to Vessels.

g. The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the ODC (CLIN 0002). Settlement of ODC (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the ACO. The contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0018 at contract completion shall be de-obligated.

5. Attachment J-3, Category “B” WIs, provides a WI breakdown of CLIN 0003 through 0018 pricing.

The following have been deleted:

Q AND A RESPONSES #4 AND #5 QUESTION AND ANSWER RESPONSE 3 RFC'S 1-10 AMENDMENT 1

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

ACRONYM TABLE

ABIHAmerican Board of Industrial Hygiene
ABRAgreement for Boat Repair
ABSAmerican Bureau of Shipping
ACOAdministrative Contracting Officer
AGRAdditional Government Requirements AIHAAmerican Industrial Hygiene Association ALTAlternate
AMTAmount
BLDGBuilding
CCOContract Change Order
CDCompact Disc
CDRLContract Data Requirements List CD-ROMCompact Disc Read-Only Memory CFMContractor Furnished Material
CFPContractor Furnished Property
CFRCondition Found Report
CHENGChief Engineer
CFRCode of Federal Regulations
CIHCertified Industrial Hygienist
CLINContract Line Item Number

CONUS CPARS

Contiguous United States Contractor Performance Assessment Reporting System

DBIDSDefense Biometric Identification Systems
DFARSDefense Federal Acquisition Regulation Supplement DODDepartment of Defense
DOD SAFEDepartment of Defense Secure Access File Exchange DONDepartment of the Navy
EMAILElectronic Mail
ESRSElectronic Subcontract Report System
FAPIISFederal Awardee Performance and Integrity Information System FARFederal Acquisition Regulation
FBLRFully-Burdened Labor Rate
F/CCFibers Per Cubic Centimeter
FPCONForce Protection Condition
FTRFederal Travel Regulations
G&AGeneral and Administrative
GFI-TDGovernment Furnished Information – Technical Data GFMGovernment Furnished Material
GFPGovernment Furnished Property
GPEGovernmentwide Point of Entry
IAWIn Accordance With
IDIdentification
ISOInternational Organization for Standardization
JTRJoint Travel Regulations
KOContracting Officer
KWhKilowatt Hour
LLTMLong Lead Time Material
LPTALowest Price Technically Acceptable
M&IEMeals and Incidental Expenses
MSCMilitary Sealift Command
MSCREPMilitary Sealift Command Representative MMMillimeter
MSRAMaster Ship Repair Agreement
MTAMid-Term Availability
N/ANot Applicable
NCACSNavy Commercial Access Control System NDANon-Disclosure Agreement
NONumber
NSPNot Separately Priced
ODCOther Direct Costs
PATProficiency in Analytical Testing

PDF PII

Portable Document Format Personally Identifiable Information

PMProgram Manager
PPEPrinciple Port Engineer
PRIMEPrime Contractor
QAQuality Assurance
QCQuality Control
REVRevision
RFCRequest for Specification Clarification
RFPRequest for Proposal
ROH/DDRegular Overhaul/Dry-Docking SECNAVSecretary of the Navy
SFStandard Form
SUBSubcontractor
TPSNTime Phased Sequencing Network
TWATime-Weighted Average
USCUnited States Code
USCGUnited States Coast Guard
USNSUnited States Naval Ship
VRVoyage Repair
WAWFWide Area Workflow
WIWork Item

SCOPE OF WORK

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS NEWPORT (T- EPF 12) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.

f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow- ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive

Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for berthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

4. Asbestos removal requirements.

a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.

b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).

d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re- occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.

2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.

4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.

g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.

i. The contractor shall insert this instruction in all subcontracts entered into under this contract.

5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.

6. Substitution of key personnel.

a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.

b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.

c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.

7. It is anticipated the ship will arrive at the contractor’s yard on or about 25 Apr 22. All work shall be completed in no more than 128 calendar days from the actual start date designated by the Government at the time of contract award.

8. The place of performance for this contract shall be the contractor’s facility.

Table 1: List of WIs:

SECTION 000 GENERAL REQUIREMENTS

NOT SEPERATELY PRICED (NSP) REQUIREMENTSCategory
001
INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS
NSP
002
TECHNICAL AND MANUFACTURER’S REPRESENTATIVES
NSP
003
APPROACH, BERTH, AND MOORING REQUIREMENTS
NSP
004
TESTING AND QUALITY ASSURANCE
NSP
005
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
NSP
006
HEAVY WEATHER PLAN
NSP
007
COLD WEATHER PLAN
NSP
024
PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (NSP)
NSP

CATEGORY “A” WORK ITEMS

010
FURNISH OFFICE FOR OMT
A
011
GENERAL SERVICES FOR SHIP
A
012
INFORMATION TECHNOLOGY SERVICES
A
013
PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS
A
014
WEIGHT AND MOMENT REPORT
A
015
INTEGRATED LOGISTICS SUPPORT (ILS)
A
016
FIRE PROTECTION AND SHIP SAFETY PROGRAM
A
017
HANDLING SHIPS STORES
A
018
DELIVERY AND REDELIVERY
A
019
SHIPBOARD ACCESS AND SECURITY
A
020
GAS FREE CERTIFICATES
A
021
CLEAN AND GAS FREE TANKS, VOIDS, AND COFFERDAMS
A
022
MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS
A
023
HAZARDOUS WASTE DISPOSAL
A
090
COVID CLEANING SERVICES
A

CATEGORY “B” WORK ITEMS

025
PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY
B
026
VESSEL FINAL COVID CLEANING (B)
B
030
CONTINUATION OF SERVICES (B)
B
SECTION 100HULL STRUCTURE
CATEGORY “A” WORK ITEMST-ALTCategory
101
STRUCTURAL INSPECTION (ANNUAL)
N/A
A
103
ALUMINUM WELDING INSPECTOR PROVIDE
N/A
A
106
UNDERWATER HULL INSPECTION AND CLEANING
N/A
A
109
AFT PEAK PLANKING REPLACEMENT
N/A
A
111
SSDG to AMR Hatch Modifications (MLOC)
16-033
A
112
Maintenance Access for Navigation Lights (MLOC)
13-028
A
107
TOWING ARRANGEMENT MODIFICATIONS (MLOC)
17-026
B
114
Grease Interceptor Replacement (AER)
17-105
B
115
ACCESS DOORS FOR RESCUE PADEYES
16-097
B
SECTION 200PROPULSION MACHINERY
CATEGORY “A” WORK ITEMS
T-ALT
Category
201CLEAN HEAT EXCHANGERS (1YR)
N/A
A
SECTION 300
ELECTRICAL

CATEGORY “A” WORK ITEMS

307VSD POWER CABLE AND GROUNDING MODIFICATIONS
17-163
A
CATEGORY “B” WORK ITEMST-ALTCategory
301
ADDITIONAL ELECTRICAL OUTLETS
13-004
B
302
AFP CONTAINERS ELECTRICAL INTERFACE MODS
19-219
B
303
NIGHT LIGHTING IN MISSION BAY (MLOC)
13-014
B
304
HULL PERIMETER SECURITY LIGHTING
13-016
B
306
MISSION BAY LED LIGHTS CONVERSION
18-189
B
310
MB FIRE DETECTION PANEL INSTALL
N/A
B
311
MB COMMUNICATIONS PANEL INSTALL
N/A
B
SECTION 400COMMUNICATION AND NAVIGATIONAL AIDS CATEGORY “A” WORK ITEMST-ALTCategory
404N6 ECDIS DIRECT-WIRE CONNECTION TO PRIMARY
NAVIGATION SENSORS
16-101
A

405 N6 INSTALLATION OF SHIP SECURITY ALERT SYSTEM FURUNO

FELCOM-19SAT C RELOCATION
15-078
A
SECTION 500AUXILIARY SYSTEMS
CATEGORY “A” WORK ITEMST-ALTCategory
503
SEWAGE PLANT MAINTENANCE (1 YR)
N/A
A
504
FIREMAIN NON-RETURN VALVES
16-077
A
507
FUEL SYSTEM MODS
13-046
A
515
HEF ER MORIN VALVE RELOCATION
16-106
A
517
VACUUM SEWAGE COLLECTION SYSTEM
MAINTENANCE (1 YR)
N/A
A
520
HEF DAMPER FUSIBLE LINK REMOVAL
18-200
A
521
FIRE STATION ISOLATION VALVES16-115 A
532
INSPECT SUBMERSIBLE BILGE PUMPS (CONFINED
SPACES - FOREPEAKS AND VOIDS) (1 YR)
N/A
A

501 AFP PW AND CHT MODS 14-073 B

SECTION 700
SPONSOR EQUIPMENT
CATEGORY “B” WORK
ITEMS
T-ALT
CATEGORY

701 READY SERVICE MAGAZINE INTERFACE TO SHIPS FIREMAIN AND 208V

18-186

B

702MODIFICATIONS FOR RSL INSTALLS
17-139
B
SECTION 800HVAC
CATEGORY “A” WORK ITEMST-ALTCategory
801
HVAC AND REFRIGERATION SYSTEM

MAINTENANCE (1 YR)

A

802
MACHINERY SPACE PLENUM CLEANING (1 YR)

A

805
CHANGES TO AC PLANT
18-188
A
852
ANNUAL LAUNDRY VENT CLEANING
N/A
A

SECTION G - CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self- registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

INVOICE

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

NOT APPLICABLE

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

INVOICE COMBO

(iii) For customary progress payments based on costs incurred, submit a progress payment request. (iv)For performance based payments, submit a performance based payment request.

(v)For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill inapplicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
N50082

Issue By DoDAAC

Admin DoDAAC**
N62387
Inspect By DoDAAC
N62387
Ship To Code
N62387

Ship From Code

Mark For Code

Service Approver (DoDAAC)
N62387
Service Acceptor (DoDAAC)
N62387

Accept at Other DoDAAC

LPO DoDAAC
N62387

DCAA Auditor DoDAAC

Other DoDAAC(s)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

MSCHQ_WAWF@navy.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS

The following documents, exhibits, and other attachments that will form a part of this contract are as follows: ATTACHMENT

NUMBER TITLE/DESCRIPTION NO. OF PAGES

J-1WI Package (Specifications)
Separate Attachment
J-2Contractor Price Breakdown - Category “A” Items
4
J-3Contractor Price Breakdown - Category “B” Items
2
J-4GFM List
1

J-5 N/A

J-6 (RESERVED)

J-7MSC Ship Repair Facility Survey
5
J-8RFC
1
J-9Disclosure of Lobbying Activities (SF-LLL)
4
J-10Interport Differential
1
J-11MSC Dry Dock Evaluation Form (as applicable)
3
J-12Past Performance Data Sheet
1
J-13Past Performance Questionnaire
3

J-14 Technical NDA 1

Exhibit A CDRL (DD Form 1423) A001 – A090

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS

INSTRUCTIONS TO OFFERORS

1. To obtain access to attachment J-1 and GFI-TD, complete and return attachment J-14 to the contract specialist. Indicate if data will be forwarded to subcontractors. Files will be available via DOD SAFE for download for up to seven (7) days. Alternatively and at the determination of the KO, attachment J-1 and GFI-TD may be distributed on CD.

2. REQUIREMENTS FOR SUBMISSION OF PROPOSALS

a. Proposal Submittal and Inquiries.

1) Proposals shall be received, via DOD SAFE ONLY, prior to the closing date and time identified on SF 33 block 9, at the following e-mail address: matias.l.parker.civ@us.navy.mil and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .