J - 1 Work Item Specifications NEWPORT MTA 21R4209.docx
DOCX document 33 KB Posted
- Solicitation number
- N3220521R4209
About this file
This document outlines specifications for a mid-term availability contract for the USNS Newport, a expeditionary fast transport ship. The specifications include requirements for hull structure work, propulsion machinery cleaning and maintenance, electrical system modifications and upgrades, communication and navigation equipment installations and repairs, auxiliary system inspections and repairs, and HVAC system maintenance. Key work items involve inspection and repair of hull structures, cleaning of heat exchangers, electrical power cable and grounding modifications, ECDIS and ship security system installations, sewage plant and vacuum system maintenance, auxiliary machinery repairs, and annual maintenance of HVAC and refrigeration equipment. The solicitation is issued by the Military Sealift Command of the Department of the Navy to fulfill these technical requirements and maintenance services during the scheduled mid-term availability period for the USNS Newport.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND - NORFOLK
NORFOLK, VIRGINIA
S P E C I F I C A T I O N S
FOR
USNS NEWPORT (EPF 12)
25 APR 2022MTA
PRINCIPAL DIMENSIONS
LENGTH 103.0 m (337.9 ft.)
BEAM 28.5 m (93.5 ft.)
DRAFT FULL LOAD (mean) 3.92 m (12.85 ft.)
ESTIMATED GROSS TONNAGE 2500 TONNES
DESIGN DEADWEIGHT 9154 TONNES
| ESTIMATED ARRIVAL DRAFT | 3.4M (11.0 FT) FWD |
| 3.4M (11.0 FT) Aft |
AIR DRAFT WITH MAST DOWN 25.3M (83 ft.)
THIS SPECIFICATION CONSISTS OF THE FOLLOWING PAGES
INDEX PAGES 2 THRU 4
| SECTION 000 | GENERAL REQUIREMENTS | |
| NOT SEPERATELY PRICED (NSP) REQUIREMENTS | Category | |
| 001 | INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP |
| 006 | HEAVY WEATHER PLAN | NSP |
| 007 | COLD WEATHER PLAN | NSP |
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (NSP) | NSP |
CATEGORY “A” WORK ITEMS
| 010 | FURNISH OFFICE FOR OMT | A |
| 011 | GENERAL SERVICES FOR SHIP | A |
| 012 | INFORMATION TECHNOLOGY SERVICES | A |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | A |
| 014 | WEIGHT AND MOMENT REPORT | A |
| 015 | INTEGRATED LOGISTICS SUPPORT (ILS) | A |
| 016 | FIRE PROTECTION AND SHIP SAFETY PROGRAM | A |
| 017 | HANDLING SHIPS STORES | A |
| 018 | DELIVERY AND REDELIVERY | A |
| 019 | SHIPBOARD ACCESS AND SECURITY | A |
| 020 | GAS FREE CERTIFICATES | A |
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, AND COFFERDAMS | A |
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | A |
| 023 | HAZARDOUS WASTE DISPOSAL | A |
| 090 | COVID CLEANING SERVICES | A |
CATEGORY “B” WORK ITEMS
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY | B | |
| 026 | VESSEL FINAL COVID CLEANING (B) | B | |
| 030 | CONTINUATION OF SERVICES (B) | B |
| SECTION 100 | HULL STRUCTURE | ||
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 101 | STRUCTURAL INSPECTION (ANNUAL) | N/A | A |
| 103 | ALUMINUM WELDING INSPECTOR PROVIDE | N/A | A |
| 106 | UNDERWATER HULL INSPECTION AND CLEANING | N/A | A |
| 109 | AFT PEAK PLANKING REPLACEMENT | N/A | A |
| 111 | SSDG to AMR Hatch Modifications (MLOC) | 16-033 | A |
| 112 | Maintenance Access for Navigation Lights (MLOC) | 13-028 | A |
CATEGORY “B” WORK ITEMS
| 107 | TOWING ARRANGEMENT MODIFICATIONS (MLOC) | 17-026 | B |
| 114 | Grease Interceptor Replacement (AER) | 17-105 | B |
| 115 | ACCESS DOORS FOR RESCUE PADEYES | 16-097 | B |
SECTION 200 PROPULSION MACHINERY
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 201 | CLEAN HEAT EXCHANGERS (1YR) | N/A | A |
SECTION 300 ELECTRICAL
CATEGORY “A” WORK ITEMS
307 VSD POWER CABLE AND GROUNDING MODIFICATIONS 17-163 A
| CATEGORY “B” WORK ITEMS | T-ALT | Category | |
| 301 | ADDITIONAL ELECTRICAL OUTLETS | 13-004 | B |
| 302 | AFP CONTAINERS ELECTRICAL INTERFACE MODS | 19-219 | B |
| 303 | NIGHT LIGHTING IN MISSION BAY (MLOC) | 13-014 | B |
| 304 | HULL PERIMETER SECURITY LIGHTING | 13-016 | B |
| 306 | MISSION BAY LED LIGHTS CONVERSION | 18-189 | B |
| 310 | MB FIRE DETECTION PANEL INSTALL | N/A | B |
| 311 | MB COMMUNICATIONS PANEL INSTALL | N/A | B |
| SECTION 400 | COMMUNICATION AND NAVIGATIONAL AIDS | ||
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 404 | N6 ECDIS DIRECT-WIRE CONNECTION TO PRIMARY | ||
| NAVIGATION SENSORS | 16-101 | A | |
| 405 | N6 INSTALLATION OF SHIP SECURITY ALERT SYSTEM FURUNO | ||
| FELCOM-19SAT C RELOCATION | 15-078 | A |
| SECTION 500 | AUXILIARY SYSTEMS | ||
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 503 | SEWAGE PLANT MAINTENANCE (1 YR) | N/A | A |
| 504 | FIREMAIN NON-RETURN VALVES | 16-077 | A |
| 507 | FUEL SYSTEM MODS | 13-046 | A |
| 515 | HEF ER MORIN VALVE RELOCATION | 16-106 | A |
| 517 | VACUUM SEWAGE COLLECTION SYSTEM | ||
| MAINTENANCE (1 YR) | N/A | A | |
| 520 | HEF DAMPER FUSIBLE LINK REMOVAL | 18-200 | A |
| 521 | FIRE STATION ISOLATION VALVES | 16-115 | A |
| 532 | INSPECT SUBMERSIBLE BILGE PUMPS (CONFINED | ||
| SPACES - FOREPEAKS AND VOIDS) (1 YR) | N/A | A |
CATEGORY “B” WORK ITEMS
501 AFP PW AND CHT MODS 14-073 B
SECTION 700 SPONSOR EQUIPMENT
| CATEGORY “B” WORK ITEMS | T-ALT | CATEGORY | |
| 701 | READY SERVICE MAGAZINE INTERFACE TO SHIPS | ||
| FIREMAIN AND 208V | 18-186 | B | |
| 702 | MODIFICATIONS FOR RSL INSTALLS | 17-139 | B |
SECTION 800 HVAC
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 801 | HVAC AND REFRIGERATION SYSTEM | ||
| MAINTENANCE (1 YR) | A | ||
| 802 | MACHINERY SPACE PLENUM CLEANING (1 YR) | A | |
| 805 | CHANGES TO AC PLANT | 18-188 | A |
| 852 | ANNUAL LAUNDRY VENT CLEANING | N/A | A |