This document contains questions and answers regarding Military Sealift Command solicitation number N3220521R4168 for a dry cargo voyage charter to transport a heavy-lift portal crane. The solicitation seeks transportation of the 91-foot-tall, 97-foot-long crane weighing over 2 million pounds from Portsmouth Naval Shipyard in Maine to its destination. Questions and answers clarify details including the crane's estimated $55 million value, center of gravity specifications, and plans to make structural drawings and pictures available to support offerors' proposals. No amendment to the solicitation is indicated beyond clarifications provided. Contact information is supplied for questions.

View the file

Other files

File Type Posted
21R4168 A0006.pdf PDF
21R4168 A0005.pdf PDF
21R4168 A0004.pdf PDF
21R4168 QA 0002.pdf PDF
FAR 52.229-11.pdf PDF
Wage Det 20190228rev6.pdf PDF
21R4168 A0002.pdf PDF
21R4168 A0001.pdf PDF
FAR 52.204-24 Oct 2020.pdf PDF
21R4168 RFP.pdf PDF
Shipyard Data Template.xlsx XLSX spreadsheet
201902885.pdf PDF
FAR 52.204-26 Oct 2020.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N3220521R4168

QUESTIONS AND ANSWERS

21 April 2021

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

1. What is the value of Crane #79, for insurance purposes?

ANSWER: 55 Million USD. However, please refer to II(j) risk of loss in the DRYVOY proforma. This contract will not require contractor to obtain cargo insurance for the crane on this charter. The response to this question does not constitute MSC declaring a valuation higher than $500.00 per package or per measurement ton.

2. There is a new Portal crane being delivered to PNS; Can that study can be made available?

Also, if the same concept is used for the roll-off of # 79, would contractor still need a certified review by an accredited Independent Marine Surveyor?

ANSWER: Study is not available and not applicable; Yes, accredited Independent Marine Surveyor is still needed.

3. There is another similar crane being delivered to Kittery this year. What is the method to unload it on the relatively weak dock?

ANSWER: This question will not be answered due to unknown proprietary implications.

4. What is the schedule for the offload of this other Crane?

ANSWER: 19 May 2021

5. Will this other crane offload potentially interfere with the move of this specified crane?

ANSWER: No, they are being offloaded on different berths at the shipyard.

6. What is the radius or boom angle when the CG is located 2.11’ behind the center of rotation and.133’ toward the operators cab?

ANSWER: After closer evaluation the x CG is -2.6' with hooks down and -2.7' with hooks up.

All calculations were done with the boom flat. Amendment to follow.

7. Where is the vertical center of gravity located when the CG is 2.11’ behind the centerline of rotation and .133 feet toward the operators cab?

Total weight: 989.21 long tons (2,215,830.00 pounds)

- Overall height: 91 feet- 3 inches (Rail to A-frame top)

- Length: 96 feet-10 inches

- Overall width: 35 feet- 6 inches

- Wheel track guage: 20 feet

- Center of gravity; 2.11 feet (Towards counterweight from center of rotation), .133 feet (towards Ops cab from center of rotation- Crane intact)

ANSWER: For hooks down, yCG is 31.90'. For hooks up yCG is 31.89'. Amendment to follow, concerning the center of gravity. See response to question 6.

8. Request drawings showing main structures of the portal, and the rotate bearing area as well as the counterweight area.

ANSWER: Requested drawings have been made available. Please contact Nic Hatcher at eric.n.hatcher@navy.mil for drawings.

9. Request structural plans of the crane to have something to base Sea Fastening design on.

Note: Use of same or similar method will save time, money and likely increase safety due to method having been completely vetted already?

ANSWER: Requested drawings have been made available. Please contact Nic Hatcher at eric.n.hatcher@navy.mil for drawings.

10. Request additional pictures of Berth 11C Portsmouth Naval Shipyard.

ANSWER: Requested drawings have been made available. Please contact Nic Hatcher at eric.n.hatcher@navy.mil for drawings.