This document contains three Request for Clarification items and responses related to a solicitation for mid-term availability work on the USNS APACHE (T-ATF 172). Item 050 requests clarification on enclosure 2.2.1, to which the response is that the enclosure does not exist and the work item should be updated. Item 051 requests reference 2.1.1 and clarification on paragraph 7.5.1, to which the response provides the corrected reference 2.1.1 and updates to work item 0483. Item 052 notes a 10-12 week delivery time for AC compressors upon award and the response indicates that a Condition Found Report should be submitted if material cannot be procured in time. The solicitation is for mid-term availability work by the Department of the Navy Military Sealift Command on the USNS APACHE, with a signed non-disclosure agreement required to receive the full work package and associated documents.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220520R7001
USNS APACHE (T-ATF 172) FY20 MTA
REQUEST FOR SPECIFICATION CLARIFICATION
RFCs 050 – 052
RFC 050
SPECIFICATION ITEM NO.: 0501
PARAGRAPH / SECTION NO: Enclosure 2.2.1
TITLE: Renew 3-Way Valve
QUESTION:
Can you please send me a copy of Enclosure 2.2.1?
ANSWER:
There is no enclosure 2.2.1. Update the Work item to reflect the valve and the location in para 3.0
RFC 051
SPECIFICATION ITEM NO.: 0483
PARAGRAPH / SECTION NO: 2.1.1. & 7.5.1
TITLE: TV-DTS SCS
QUESTION:
Can you please provide reference 2.1.1- TV-DTS System Certification Sheet.
Paragraph 7.5.1- States to provide the services of TV-DTS representative to perform the TV-DTS System Certification outlined in reference 2.1.2. There is no reference 2.1.2 in paragraph 2.1.
ANSWER:
#1.a: Reference 2.1.1 is corrected and attached.
#1.b: Work Item 0483 corrected, please review uodated work item 0483 for changes to reference 2.1.1, and paragraphs 7.5.1.
RFC 052
SPECIFICATION ITEM NO.: 0508
PARAGRAPH / SECTION NO: 3.2
TITLE: AC Plant Refurbishment
QUESTION:
Just advised that the AC Compressors are 10-12 week delivery time upon award.
ANSWER:
Noted, if material cannot be procured between contract award date and work items scheduled start date within Period of Performance Contractor to submit Condition Found Report (CFR) for adjudication.