20R3509 Attach_D with Attach S - Basic Pricing and Fuel Cons..xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Undersea Rescue Command Support Vessel Federal contract opportunity
Solicitation number
N32205-20-R-3509
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains pricing templates and fuel consumption data attachments for a solicitation seeking a vessel to support undersea rescue command. The solicitation was issued by the Department of the Navy Military Sealift Command seeking offers for a vessel to support undersea rescue operations. The pricing templates include cost categories for crew, vessel maintenance, insurance, and profit/fees for both the base period and up to five option periods. Offerors are instructed to provide fuel consumption rates and pricing for fuel types including IFO-380, IFO-180, MGO/MDO, and other fuels if applicable. Defined pricing rates for standard fuel types will be used to evaluate total fuel costs.

View the file

Other files for this federal contract opportunity

Other files attached to Undersea Rescue Command Support Vessel, newest first.
File Type Posted
3509 Attach_D with Attach S Revised.xlsx XLSX spreadsheet
3509 Amend 0006 Attach D and S Revised.pdf PDF
Attach. A-Wage Determination 201902884.txt TXT text file
Attach. A-Wage Determination 2015021316.txt TXT text file
20R3509 Amend 0005.pdf PDF
A0004 Extension.pdf PDF
A0003 Extension.pdf PDF
RFP 20R3509 Q AND A.pdf PDF
20R3509_Attachment_F - Crew Complement.docx DOCX document
20R3509 Amend 0002 Attachments.pdf PDF
20R3509 Amend 0001 Due Date Revision.pdf PDF
20R3509 RFP.pdf PDF
20R3509_Attachment_V-Interface Ctrl Drawing2.pdf PDF
20R3509_Attachment_K-Interface Ctrl Drawing1.pdf PDF
Shipyard Data Template.xlsx XLSX spreadsheet
20R3509_Attachment_E - DD254.pdf PDF
20R3509 SPECIALTIME PROFORMA 2019.pdf PDF
20R3509_Attachment_Q- Tech Offer Worksheet.xlsx XLSX spreadsheet
20R3509_Attachment_W - Decon Station DWG.pdf PDF
20R3509_Attachment_O - NAVSEA Drawing.pdf PDF
20R3509_Attachment_U-MSC Monthly Meal Invoice Charge Sheet.xls XLS spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE

PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSESTIMATED FUEL COSTTOTAL PER DIEM/PERIOD
BASE PERIOD365
OPTION 1365
OPTION 2365
OPTION 3366
OPTION 4334
Option 5 (FAR 52.217-8)182

TOTAL EVALUATED FUEL

PORT CHARGES DIFFERENTIAL N/A

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

TOTAL EVALUATED PRICE $ - 0

Note:
1. OFFERORS SHALL USE THE OPTION PERIOD 4 DAILY CHARTER RATE AS THE DAILY RATE IN THE "FAR 52.217-8" PERIOD.

Fuel Consumption Data

Attachment SVessel:
Basic Pricing DataRFP: N32205-20-R-3509

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below and enter in the corresponding price per metric ton for that fuel type in Column G. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
66Fuel Underway (laden)91IFO-380:
Other Fuel Type (if necessary)
69Fuel Underway (ballast)146IFO-380:
Other Fuel Type (if necessary)
71In-Port Idle128IFO-380:
Other Fuel Type (if necessary)
TOTAL:$ - 0
Notes:
1Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors. The rates to be used are as follows:
DLA Std Price 181001
MGO/MDO:per metric ton$ 971.12
IFO-180:per metric ton$ 616.70
IFO-380:per metric ton$ 611.21
Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request,
prior to offers being received, that rates for that fuel be posted via an amendment.

Fuel conversion factors are as follows:

MGO/MDO:7.507 barrels per metric ton
IFO-180:6.526 barrels per metric ton
IFO-380:6.468 barrels per metric ton

2 Fuel Consumption shall be assuming moderate weather

3 Fuel Consumption shall be based upon Box 68, 69, and 71 consumption rates. Fuel consumed during in-port periods when on shore power will not be evaluated.

Basic Pricing Data

Attachment DVessel:
Basic Pricing DataRFP: N32205-20-R-3509
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment F
2Crew Training, not separately itemized in Attachment F
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment DVessel:
Basic Pricing DataRFP: N32205-20-R-3509
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment F
2Crew Training, not separately itemized in Attachment F
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment DVessel:
Basic Pricing DataRFP: N32205-20-R-3509
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment F
2Crew Training, not separately itemized in Attachment F
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment DVessel:
Basic Pricing DataRFP: N32205-20-R-3509
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment F
2Crew Training, not separately itemized in Attachment F
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment DVessel:
Basic Pricing DataRFP: N32205-20-R-3509
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment F
2Crew Training, not separately itemized in Attachment F
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 335 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 5

Attachment DVessel:
Basic Pricing DataRFP: N32205-20-R-3509
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 182-day year
Option 5 (FAR 52.217-8)
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment F
2Crew Training, not separately itemized in Attachment F
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 183 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

File details come from the government source that posted it. Updated .