J-8_RFC_Questions_and_Answers.doc
DOC document 75 KB Posted
- Attached to
- USNS COMFORT Mid-Term Availability Federal contract opportunity
- Solicitation number
- N3220519R6505
About this file
Questions and Answers Revised
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| USNS_COMFORT_MTA_-_Amendment_0002.docx | DOCX document | |
| 0556_A_(REV_A_)INSPECT_DECK_CRANES_(1YR).pdf | ||
| J-8_RFC_Questions_and_Answers.doc | DOC document | |
| J-2_USNS_Comfort_-_Work_Items_Estimates_J2_Revised_(002)_Sep.xlsx | XLSX spreadsheet | |
| J-8_RFC_Questions_and_Answers.doc | DOC document | |
| USNS_COMFORT_Amendment_0001_Documentation.pdf | ||
| Memo_to_File_19R6505.pdf | ||
| J-2_USNS_Comfort_-_Work_Items.xlsx | XLSX spreadsheet | |
| COMFORT_Solicitation_-_N3220519R6505.docx | DOCX document | |
| J_&_A_USNS_COMFORT-20190709142409_Redacted.pdf | ||
| J-3_USNS_Comfort_-_Work_Items_.xlsx | XLSX spreadsheet | |
| J_&_A_USNS_COMFORT-20190709142409_Redacted.pdf | ||
| COMFORT_J_Attachents.zip | ZIP file | |
| COMFORT_Solicitation_-_N3220519R6505.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220519R6505
USNS COMFORT (T-AH 20)
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __WI 458_____________
PARAGRAPH / SECTION NO: _2.1.1_____________
TITLE: ____WHIP ANTENNA MAINTENANCE_______
QUESTION: #1
COULD YOU PLEASE PROVIDE THE REFERENCE AS LISTED IN SPECIFICATIONS? THE ARRANGEMENT IS NOT IN THE PACKAGE.
ANSWER:
Please see attached references.
0967-LP-177-3050
0967-LP-421-1010
0967-LP-297-6010
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __WI 301____________
PARAGRAPH / SECTION NO: _3.3___________
TITLE: ____NR 2 ADG JACKET WATER PUMP_______
QUESTION: #2
THE MANUFACTURER STATED THAT THEY DO NOT SELL MATERIALS TO A THIRD PARTY ENTITY. THEY STATE THAT THEY SELL TO GOVERNMENT ONLY. THE MANUFACTURER IS MAN B&W AG
ANSWER:
Gov has also found parts to be long lead items. To prevent undue stress on the contractor, the Gov will “delete the work item” from the package and send out as a separate work request NOT attached to this solicitation.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __WI 881____________
PARAGRAPH / SECTION NO: ALL__________
TITLE: ____AC CHILLER SERVICING_______
QUESTION: #3
CAN ALL THREE UNITS BE TAGGED OUT AT THE SAME TIME TO BE SERVICED ?
ANSWER:
NO.
At least 1 unit must remain in operation daily.
With ship’s force participation, it may be possible to secure all 3 for the maximum of 1 to 2 hours.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: _______WI 503_____________
PARAGRAPH / SECTION NO: ___________________
TITLE: _________________________________________________________________
QUESTION: #4
Does the work listed for Main Circulating Pump and Motor Overhaul require the installation of a cofferdam?
ANSWER:
YES.
The present arrangement is only One (1) valve protection, Butterfly valve.
The scope of work will require divers to install a “cofferdam” and contractor to install a “Pancake” to provide Two (2) valve protection for pump overhaul.
Recap:
Three step process:
1) Divers install cofferdam, contractor install pancake. Test for leakage prior to divers departing the water. Prior to opening pump case.
2) Contractor / divers monitor status of cofferdam daily while pump case is opened.
3) After pump has been put back together, divers to verify cofferdam integrity, contractors remove pancake, test for leakage, prior to divers leaving the water.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __SECTION I____________
PARAGRAPH / SECTION NO: 52.211-11__________
TITLE: ______LIQUIDATED DAMAGES__
QUESTION: #5
Being the ship will be on the base for repairs and not a Contractor Facility, the Contractor does not have control of all of the subs and OEMs gaining access to the vessel. Can the $90,342.00 a day be removed from the Contract?
ANSWER:
This clause will not be removed but, Total Liquidated Damages shall not exceed 50% of the contract value
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __0011___________
PARAGRAPH / SECTION NO: 7.1.3.1.__________
TITLE: ______FURNISH GENERAL SERVICES__
QUESTION: #8
Paragraph states to provide 90 ton crane 10 times with a 24 hour notice. Since it takes at least 5 days to get crane lifts approved, is it the intent for contractor to have crane on pier for entire availability?
ANSWER:
Crane capacity reduced from 90 Ton to 25 Tons and notice increased from 24 hours to 40 hours. Revision A of work item attached.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __102___________
PARAGRAPH / SECTION NO: ALL__________
TITLE: ______01 DECK NON SKID RENEWAL__
QUESTION: #9
This work item requires port and starboard 01 level decks to be blasted and non-skidded during this availability. These two decks are like the major interstate highway on this ship. Prepping and painting of these decks would interfere and prevent repairs on many items. Items include accommodation ladders, life raft davits, lifeboat davits, life boats, rescue boats and davits, security boats and crane. Contractor feels that this item should not be accomplished at this time given all of the work to be done. Can this item be rescheduled?
ANSWER:
Work Item removed from Work Package.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __ALL__________
PARAGRAPH / SECTION NO: ALL__________
TITLE: ______ALL__
QUESTION: #6
Due to the extensive amount of work associated with this availability, can more time be allotted to complete repairs?
ANSWER:
Period of Performance has been extended eighteen days (18). It has gone from an 60 day availability to a 78 day availability. POP is now January 8, 2020 to March 27, 2020.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: ____353_______
PARAGRAPH / SECTION NO: ____ALL_____
TITLE: ______THEMOGRAPHIC SURVY_
QUESTION: #7
While obtaining subcontractor pricing, it was revealed that the subcontractor just completed survey in March during shipyard period. Are we certain we want this item completed again?
ANSWER:
Work Item to be retained as written.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __102___________
PARAGRAPH / SECTION NO: ALL__________
TITLE: ______01 DECK NON SKID RENEWAL__
QUESTION: #8
This work item requires port and starboard 01 level decks to be blasted and non-skidded during this availability. These two decks are like the major interstate highway on this ship. Prepping and painting of these decks would interfere and prevent repairs on many items. Items include accommodation ladders, life raft davits, lifeboat davits, life boats, rescue boats and davits, security boats and crane. Contractor feels that this item should not be accomplished at this time given all of the work to be done. Can this item be rescheduled?
ANSWER:
Work Item removed from Work Package.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: ____353_______
PARAGRAPH / SECTION NO: ____ALL_____
TITLE: ______THEMOGRAPHIC SURVY_
QUESTION: #9
While obtaining subcontractor pricing, it was revealed that the subcontractor just completed survey in March during shipyard period. Are we certain we want this item completed again?
ANSWER:
Work Item to be retained as written.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: _______WI_958____________
PARAGRAPH / SECTION NO: ________7.4.a___________
TITLE: _________________________________________________________________
QUESTION: #10
“Hydroblasting (high pressure water jet cleaning) may be used on all propellers and fairwater surfaces. Perform hydroblasting immediately upon drydocking and before marine growth has dried. At NO TIME shall hydroblasting on unpainted propeller surfaces exceed 10,000 psi or 2,000 psi for painted surfaces.” Please advise if the USNS COMFORT does/doesn’t have painted propellers. Specification is a generic form and this will make a difference in the cleaning method and associated pricing.
ANSWER:
USNS Comfort will not be going on dry dock, this is a pier side availability.
Comfort only has one (1) propeller.
Comfort propeller is not painted.
Propeller is Ni Al Brz, ABS Type 4, 26 Feet Diameter, 5 Blades.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: ________WI 501____________
PARAGRAPH / SECTION NO: ___3.2.1 and 3.2.2________________
TITLE: _________________________________________________________________
QUESTION: #11
Paragraph 3.2.1 – “40 feet of schedule 80 piping for each of the various sizes.” Please advise if the piping material is carbon steel for all systems including sewage & seawater/freshwater.
Paragraph 3.2.2 – “20 feet of schedule 40 piping for each of the various sizes.” Please advise if the piping material is carbon steel for all systems including sewage & seawater/freshwater.
ANSWER:
For bid purposes, all piping is schedule 40 galvanized steel.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: ________WI 657____________
PARAGRAPH / SECTION NO: ___7.2________________
TITLE: Accommodation Ladder Inspection
QUESTION: #12
Paragraph 7.2 – “Provide temporary means of access to the vessel whenever the accommodation ladder and gangways are unavailable due to inspection, service & testing.” Can the Public Works Center (PWC) at NOB provide the temporary ladder/gangway for this item?
ANSWER:
The standard set up for USNS Comfort while at Norfolk Naval Base is to have a quarterdeck / access point utilizing a base gangway arrangement.
Typically, the ship’s “accommodation ladder” is only used as a backup, when needed.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: _______WI 556_____________
PARAGRAPH / SECTION NO: _________7.8.1__________
TITLE: Inspect Deck Cranes
QUESTION:
Paragraph 7.8.1 – “Provide the services of a Contractor recognized as a crane certifying authority to inspect, repair, weight test and recertify the cranes & hoists located in machinery spaces using reference 2.1.1 thru 2.1.5 for guidance. Qualifications and certificates for the company and field service rep are to be submitted to the MSCREP for review and approval prior to starting any work. Suggested source: 7.8.1.2 Palfinger Marine USA Inc. and 7.8.1.3 Pine Hill Equipment”
1. The cranes requiring certification are not located in the “Machinery Spaces” as noted in paragraph 7.8.1. Since the cranes requiring servicing are not located in the Machinery Spaces do these same requirements still apply? Please advise.
2. Palfinger Marine USA directed contractor to Pine Hill Equipment for work on 3.2.2.2. Pine Hill Equipment stated “PHE is not certified by any outside surveyor, not ABS or Lloyds.” Please advise if the lack of certificates by Pine Hill Equipment will meet the MSCREP requirement to provide qualifications/certificates for review and approval prior to starting any work.
ANSWER:
1. Paragraph 7.8.1 of work items is incorrect. Paragraph 7.8.1 of the work item has been revised and will be issued in Ammendment 002.
2. Pine Hill Equipment is recognized by MSC as an acceptable contractor to accomplish the requirements of the Work Item 556 for the Palfinger 32002M Crane onboard the Comfort.
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: __________WI 581__________
PARAGRAPH / SECTION NO: ________7.9.1___________
TITLE: Steering System Annual Service
QUESTION:
Paragraph 7.9.1 – “The equipment addressed in this work item is categorized as critical equipment in accordance with MSC policy on the classification of critical shipboard systems and equipment. Only original equipment manufacturer (OEM) authorized technical field service representatives and OEM parts shall be used to accomplish the requirements of this work item for this critical equipment including oversight,….” The OEM Sperry Marine provided the contractor with a “NO BID” for this work item. Stating “We cannot meet the spec or do any hydraulic work on this system. This system is also no longer supported and has limited to no spare parts.” Please advise.
ANSWER:
The following OEM Authorized Representative is a suggested source that can accomplish the requirements of the work item:
Nav Systems Inc.
425 Network Station, STE 10
Chesapeake, Va 23320
POC: David Hall
Phone: (757) 410-4872
Mobil: (757) 675-5900
E-mail: dave.hall@nav-sys.com
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: ________ALL____________
PARAGRAPH / SECTION NO: ________ALL___________
TITLE: Solicitation Extension
QUESTION:
Contractor A - Can the USNS COMFORT submittal due date of 10-9-19 be extended. Contractor is having difficulty obtaining quotes from Original Equipment Manufacturers (OEM) as well as vendors due to No Bids, material ordering issues, requested references response delays, obsolete equipment and the need for bidder question government answered replies. If possible a 2 week extension would help.
Contractor B - We respectfully request the due date be extended until October 11, 2019 to allow additional time to prepare our proposal for the subject solicitation.
ANSWER: The solicitation for the USNS COMFORT (T-AH 20) will not be extended. Proposal due date will remain the same, with proposals being due on October 9, 2019 at 12:00pm Eastern Standard Time.
ATTACHMENT J - 8