USNS_COMFORT_Amendment_0001_Documentation.pdf
PDF 154 KB Posted
- Attached to
- USNS COMFORT Mid-Term Availability Federal contract opportunity
- Solicitation number
- N3220519R6505
About this file
Amendment Documentation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-8_RFC_Questions_and_Answers.doc | DOC document | |
| USNS_COMFORT_MTA_-_Amendment_0002.docx | DOCX document | |
| 0556_A_(REV_A_)INSPECT_DECK_CRANES_(1YR).pdf | ||
| J-8_RFC_Questions_and_Answers.doc | DOC document | |
| J-2_USNS_Comfort_-_Work_Items_Estimates_J2_Revised_(002)_Sep.xlsx | XLSX spreadsheet | |
| J-8_RFC_Questions_and_Answers.doc | DOC document | |
| Memo_to_File_19R6505.pdf | ||
| J-2_USNS_Comfort_-_Work_Items.xlsx | XLSX spreadsheet | |
| COMFORT_Solicitation_-_N3220519R6505.docx | DOCX document | |
| J_&_A_USNS_COMFORT-20190709142409_Redacted.pdf | ||
| J-3_USNS_Comfort_-_Work_Items_.xlsx | XLSX spreadsheet | |
| J_&_A_USNS_COMFORT-20190709142409_Redacted.pdf | ||
| COMFORT_J_Attachents.zip | ZIP file | |
| COMFORT_Solicitation_-_N3220519R6505.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment 0001 is to:
a) Remove WI 102 and 301 from C-2, J-1, and J-2;
b) Revise WI 011 and 021 in J-1;
c) Add WI 162 (Watertight Closure Inspection) and 506 (Sew age Piping Repairs) to C-2, J-1, and J-2;
d) Updated numerous clauses and provisions w ithin Section I and L
e) Extend Solicitation Due Date to October 9, 2019 (Section A);
f) Extend the due date for clarif ications to September 20, 2019 (L-3); and
g) Change the Period of Performance to 80 days (F-1). January 8, 2020 to March 27, 2020.
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220519R6505
X 9B. DATED (SEE ITEM 11)
20-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2019
CODE
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C STREET, BLDG SP-64 NAVAL STATION N
NORFOLK VA 23511
N32205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3220519R6505
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION / CONTRACT FORM
The required response date/time has changed from 25-Sep-2019 12:00 PM to 09-Oct-2019 12:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C-1 GENERAL
1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS COMFORT (T-AH 20) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.
2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):
(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.
(b) Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR Clause 52.245-1 and DFARs Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.
(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.
(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.
(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance.
Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.
(f) Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.
(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.
(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.
(i) Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.
(j) Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.
(k) Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.
3. Contract work shall be performed by an eligible contractor as defined below.
(a) The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.
(b) The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:
a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority.
Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions.
Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.
b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios.
Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.
c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.
d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.
e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.
f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.
g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability.
Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.
h. Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.
i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.
j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:
o Structural Shop o Machine Shop o Pipe Shop o Electrical/Electronic Shop o Carpentry Shop o Rigging Equipment
k. Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.
(c) The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.
WORK ITEM INDEX REPORT
Item Number Title Category
SECTION 0000 GENERAL SERVICES AND REQUIREMENTS
0001 INTENT SCOPE GENERAL CONDITION AND DEFINITIONS N
0002 TECHNICAL AND MANUFACTURER REPRESENTATIVES N
0004 TESTING AND QUALITY ASSURANCE N
0005 ELECTRICAL SAFETY PROCEDURE REQUIREMENTS N
0011 FURNISH GENERAL SERVICES FOR SHIP AT GOVT PIER A
0013 PROJECT PLANNING AND PRODUCTION STATUS MONITORING A
0016 FIRE PROTECTION AND SHIPS SAFETY PROGRAM A
0020 GAS FREE CERTIFICATES A
0021 CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS AND A
0022 MACHINERY SPACE TURNOVER DOCK AND SEA TRIALS A
0023 HAZARDOUS WASTE DISPOSAL A
SECTION 0100 HULL AND STRUCTURAL
0101 KICK PIPE RENEWALS A
0103 ULTRASONIC THICKNESS GAUGING A
0106 B DECK STEEL RENEWALS A
0107 PRESERVATION SERVICE AREA NO. 2 A
0108 PRESERVATION SERVICE AREA NO. 3 A
0109 LEAD PAINT TESTING AND ABATEMENT B
0110 A DECK STEEL RENEWALS A
0162 WATER TIGHT CLOSURE INSPECTION A
0165 PUMP ROOM BILGE PRESERVATION A
0186 CABLE PENETRATION INSPECTIONS A
SECTION 0200 PROPULSION MACHINERY
0287 AUTOMATION AND PROPULSION CONTROL INSPECT AND TEST A
SECTION 0300 ELECTRICAL
0302 ER EXHAUST FANS MOTORS OVERHAUL A
0304 SSDG LOW VOLTAGE ALARM INSTALLATION A
0353 THERMOGRAPHIC SURVEY (1YR) A
0382 BATTERY REPLACEMENT (5YR) A
SECTION 0400 COMMUNICATION AND NAVIGATION
0451 ANNUAL RADAR SERVICE (1YR) A
0452 ANNUAL ECDIS SERVICE (1YR) A
0453 ANNUAL GYRO SERVICE (1YR) A
0455 ANNUAL RADIO COMMUNICATION EQUIPMENT CERT (1YR) A
0458 WHIP ANTENNA MAINTENANCE A
0459 ECHO SOUNDER SERVICE (1YR) A
0460 ANNUAL INSPECTION OF ALARMS (1YR) A
0491 ANNUAL SVDR RECERTIFICATION (1YR) A
SECTION 0500 AUXILIARY MACHINERY
0501 PIPING RENEWAL A
0502 MOORING WINCHES TROUBLESHOOTING A
0503 MAIN CIRC PUMP AND MOTOR OVERHAUL A
0504 STEAM DRIVEN FIRE PUMP A
0505 DISTILLER MAINTENANCE A
0506 SEWAGE PIPING RENEWAL A
0554 INSPECT TEST AND CERT MACH SPACE CRANES (1YR) A
0556 INSPECT DECK CRANES (1YR) A
0560 PERSONNEL ELEVATOR INSPECTION AND TEST (5YR) A
0562 SCBA ANNUAL INSPECTION (1YR) A
0563 SCBA COMPRESSOR AND FILL STATION INSPECT AND MAINT A
0565 FIXED GAS FIREFIGHTING SYSTEM INSPECT AND TEST (1Y A
0567 FIXED FOAM FIREFIGHTING SYSTEM INSPECT AND TEST (1 A
0569 FIRE AND SMOKE DETECTION AND ALARM SYSTEM (1YR) A
0570 PORTABLE FIRE EXTINGUISHER SERVICE (1YR) A
0571 ANNUAL FIRE AND SMOKE DAMPER SERVICE (1YR) A
0572 DEEP FAT FRYER AND RANGE HOOD FIRE EXTINQUISHER SY A
0573 FIRE HOSES (1YR) A
0574 FIRE DOORS AND SHUTTERS (1YR) A
0580 REFRIGERATION PLANT SERVICE AND REPAIR A
0581 STEERING SYSTEM ANNUAL SERVICE (1YR) A
0585 INCINERATOR SERVICING (5YR) A
0587 OWS AND OCM ANNUAL SERVICING (1YR) A
0590 WATER MIST FIREFIGHTING SYSTEMS (1YR) A
SECTION 0600 HABITABILITY OUTFITTING AND FURNISHINGS
0601 TENDER BOAT IMO NUMBERING (VRR 18-078 AND 079) A
0602 LIFEBOAT DAVIT SHEAVE RENEWAL A
0651 ANNUAL LIFEBOAT AND DAVIT INSPECTION (1YR) A
0653 ANNUAL RESCUE BOAT AND DAVIT INSPECTION (1YR) A
0657 ACCOMMODATION LADDER INSPECTION (1YR) A
0662 DEEP FAT FRYER INSPECTION (1YR) A
0681 LIFE RAFT DAVIT ANNUAL SERVICING (1YR) A
0686 USN RHIB INSPECTION (1YR) A
0690 STEAM KETTLE RELIEF VALVE AND HYDRO TEST (5YR) A
0693 SPIDER LIFT SERVICING (1YR) A
0694 UTILITY BOAT INSPECTION (1YR) A
SECTION 0700 SPONSOR RELATED
0701 MTF HEADS AND GEAR LOCKER OVERHAUL B
0702 PACU DECK TILE REPLACEMENT (VR18-045) B
0703 MTF WARD HEAD REPAIRS (VRR 18-084) B
SECTION 0800 HVAC
0851 ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANIN A
0852 ANNUAL LAUNDRY VENT CLEANING (1YR) A
0853 ACCOMODATION VENT SYSTEM CLEANING A
0881 AC CHILLER SERVICING (1YR) A
SECTION 0900 DRYDOCKING
0958 PROP CLEAN AND POLISH IN WATER - (0.5YR) A
SECTION F - DELIVERY AND PERFORMANCE
F-1 SHIP AVAILABILITY PERIOD
It is anticipated the ship will arrive at contractor’s yard on or about January 8, 2020. All work shall be completed in no more than 80 calendar days from actual start date designated by the Government at time of contract award.
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION
2019-O0003).
JAN 2019
52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2019-O0003). JAN 2019 52.244-6 Subcontracts for Commercial Items AUG 2019 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7004 Display of Hotline Posters AUG 2019
52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of not exceeding $90,342.00 per calendar day of delay. Total Liquidated Damages shall not exceed 50% of the contract value.
(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.
(End of clause)
The following have been deleted:
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-14 Limitations On Subcontracting JAN 2017 52.244-6 Subcontracts for Commercial Items JAN 2019 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7004 Display of Hotline Posters MAY 2019
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS
The following have been added by reference:
252.215-7008 Only One Offer JUL 2019
L – 1 GOVERNMENT FURNISHED INFORMATION – TECHNICAL DATA (GFI-TD)
GFI-TD referenced but not enclosed with this RFP are available via CD upon request. Offerors shall submit their request to the KO and provide their company name, point of contact, address, and phone number, and shall indicate if data will be forwarded to subcontractors.
L –2 REQUIREMENTS FOR SUBMISSION OF PROPOSALS
A. Proposal Submittal and Inquiries.
1. Proposals shall be received prior to the closing date and time identified on the SF 33, at the following address:
Military Sealift Command
Attn: Ricky Bell 471 East C Street Bldg. Sp-64 Naval Station Norfolk, VA 23511-2419
2. Electronic submissions via email or facsimile will not be accepted. Offers shall be mailed through a commercial/Government carrier or hand-carried.
3. All questions concerning the solicitation shall be addressed to the contracting specialist identified below via email:
richard.bell3@navy.mil
4. See L-5, “Inspection of Vessel/Pre-Proposal Conference,” for instructions to participate in a pre-proposal inspection of the vessel.
B. General Instructions
1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Subpart 15.3. Offers will be evaluated using the criteria under Section M, “Evaluation Factors for Award.” Noncompliance with the RFP requirements may hamper the Government’s ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
2. The offer. The submission of the documentation specified below will constitute the offeror’s acceptance of the terms and conditions of the solicitation.
3. It is the Government’s intention to award without discussions. Offerors are encouraged to submit their best technical proposal and prices in initial proposals. IAW FAR 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR 15.306(c)(2). Proposals containing unacceptable ratings may be included in the competitive range provided they can be made acceptable as a result of discussions.
4. Instructions outlined in paragraph C below prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of information needed to allow for evaluation of proposals.
5. The WI Package is only available upon a written request to the contract specialist. All other referenced documents for this solicitation are available on the FBO website at https://www.fbo.gov.
6. Debriefings. The KO will promptly notify offerors of the decision to eliminate their proposals from the competitive range, whereupon an offeror can request and receive a debriefing in accordance with FAR
15.505. The KO will notify unsuccessful offerors in the competitive range of the source selection decision IAW FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing.
Any offeror requesting a debriefing must make the request in accordance with the requirements of FAR 15.506.
C. Proposal Preparation Instructions mailto:Contract%20Specialist@navy.mil https://www.fbo.gov/
1. Offeror’s proposal shall consist of two (2) separate volumes: (Volume I) General; and (Volume II) Technical Proposal.
2. Proposal Format
a. Offerors shall submit an original of their proposals and the number of copies listed in paragraph “c” below.
b. The proposals shall be organized into two (2) separate, sealed volumes. Each hard copy volume of the proposal shall be separately bound in a three-ring loose leaf binder. The original copy of each volume shall be marked, “Original,” and any copy shall be marked, “Copy.”
c. In addition to submitting hard copies of the proposals, offerors shall provide digital copies shall be provided on CD-ROM disk in Adobe PDF, Microsoft Word, PowerPoint, and/or Excel.
Offerors shall ensure that proposal disks are virus-free and free of password protection. The Government reserves the right to eliminate a proposal from consideration if access to proposal data is prohibited due to viruses, passwords, and/or wrong format.
d. The table below shows detailed page limits and number of copies required to be submitted:
Volume Title Number of Hard Copies
Number of Digital Copies (CD ROM)
Page Limits
I General 2 1 N/A II Technical Proposal 4 1 50 pages, excluding appendices
The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and remain unread.
The offeror shall submit a technical and a price proposal that shall include, at a minimum:
D. Proposal Content
1. Volume 1 – General. Offerors are required to submit: (TAB A) a completed SF 33 to include acknowledgement of amendments, if applicable; (TAB B) Section B – Supplies or Services and Prices/Costs and an itemized breakdown of price on the form(s) provided in Attachments J-2 and J-3; (TAB D) Section K Representations, Certifications, and Other Statements of Offerors; and (TAB E) Past Performance.
TAB A, SF 33. The SF 33 shall be fully completed upon submission. The offeror shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 33 and FAR Clause 52.215-1(b).
TAB B, Price:
For the price submission, the hard copy version will take precedence for any differences noted between the hard copy and electronic versions of an offeror’s proposal.
Offerors shall submit prices in the format specified on the Contractor Price Breakdown forms of this solicitation, Attachments J-2 and J-3. Each specification Item Number must be either priced or marked “NSP.”
Overall Price. Unit prices and extended prices must be submitted as indicated, except NSP items.
Offerors shall include any costs associated with third-party access to the contractor’s facility, including costs for badges, safety orientation instruction, and/or parking, in the price proposal under the Shipboard Access and Security Item. For estimating purposes, offerors shall assume that (1) the Government will require access, to include safety orientation instruction and parking at the shipyard facility, for thirty individuals for the entire duration of the performance period; and
(2) 20% of the badges issued to the Government and third-party personnel will be lost/misplaced and will require replacement.
Offerors shall include the Hazardous Waste Handling Fee rate per WI 0023 Hazardous Waste Disposal, the unit price per gallon of distilled water per WI 0011, the unit price per gallon on bilge water disposal per WI 0011, and the unit price per Crane Lift per WI 0011 in Section B of the solicitation.
The contractor agrees that its man-hour rate for the 2,742 man-hours of the AGR includes the complete and full compensation to which it is entitled, including, but not limited to, compensation for all the direct labor costs, (e.g., straight time, overtime, premium time, shift differential, holiday time, standby time, etc.) for performing the AGR, as well as compensation for acceleration, delay and disruption, and other impact, if any, to the aforementioned WI, to work performed under any other Government contract, and to any work in progress for the Government. The contractor further agrees that it is not entitled to a time extension to the delivery date of any ship under a Government contract by reason of or as a result of the ordering of 2,742 man-hours of AGR.
AGR does not include work performed pursuant to the clauses of this contract entitled “Inspection and Manner of Doing Work,” “Guarantees,” or other contract provision relating to the correction of defects.
TAB C, Subcontracting Plan. IAW FAR 52.219-9, 52.219-9 Alt II, and DFARS 252.219-7003 (DEVIATION 2018-O0007), large business offerors shall submit a Small Business Subcontracting Plan with their proposal. Offerors shall ensure they submit a Small Business Subcontracting Plan with all of the information required.
In preparing the Small Business Subcontracting Plan, offerors should note that historical compliance with FAR 52.219-8, 52.219-9 Alt II, and DFARS 252.219-7003 (DEVIATION 2018-O0007) shall be evaluated as part of Past Performance.
TAB D, Section K (Representations, Certifications, and Other Statements of Offerors). The offeror shall ensure that its Section K submission is thoroughly completed, with all blocks in each certification/representation executed in their entirety and truthfully.
TAB E, Past Performance:
The Past Performance evaluation will be accomplished by reviewing aspects of an offeror’s recent and relevant Past Performance. Offerors may provide information for up to three (3) previous Government contracts where the effort is/was recent and relevant to the effort required by this solicitation.
a. “Recent” is defined as a contract inprogress or completed within the last three (3) years.
If the offeror has not had three (3) Government contracts within the last three (3) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted.
b. “Relevant” is defined as a contract that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation.
i. Scope: Experience in the areas defined in the WI package.
ii. Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the WI package.
iii. Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the WI package. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).
A Past Performance Data Sheet (Attachment J-12) shall be submitted for each contract to be considered as past performance. Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract; and the role performed, including whether the offeror acted as a prime contractor or a subcontractor. Offerors are responsible for the accuracy of all data provided.
Past performance information regarding predecessor companies, key personnel who have relevant experience, and subcontractors that will perform major or critical aspects of the requirement may be provided as past performance submissions.
For each of the contracts the offeror describes in a Performance Data Sheet (Attachment J-12), the offeror is requested to provide a Past Performance Questionnaire (Attachment J-13) to a reference at the organization that awarded the contract. The reference, not the offeror, shall email the completed past performance Questionnaire BEFORE THE DUE DATE FOR PROPOSALS directly to Ricky Bell, Military Sealift Command Norfolk, Bldg SP-64 471 East C Street, Naval Station Norfolk, VA 23511-2419, email to richard.bell3@navy.mil. Fax submittals will not be considered. If the contracts listed in Attachment J-12 are available in a Government past performance system (i.e. CPARS, FAPIIS, ESRS) for Government review, Attachment J-13 is not required. The offeror, NOT THE GOVERNMENT, is responsible for ensuring the Government receives a sufficient number of questionnaires or that sufficient information is documented in the Government’s past performance systems for review.
2. Volume II – Technical Proposal.
The technical proposal will be the basis for assessing the offeror’s ability to understand and perform the tasks in the solicitation. Section M of the solicitation outlines the evaluation factors and defines the source selection evaluation criteria for evaluating the technical proposal. A legible, neat, orderly, and comprehensive proposal is required. Data should be presented in Evaluation Factor sequence (1.0-3.0) and paragraph numbering in the proposal submitted should coincide with the numbering system set forth in Section M. Failure to respond to any one of the evaluation factors may result in disqualification of the proposal.
The technical proposal must demonstrate an understanding of and an ability to meet all of the requirements covered in the specification. The proposal should be sufficiently complete to demonstrate how the offeror will comply with Government directions and requirements throughout the performance period. Data previously submitted, or presumed to be known, i.e., descriptions of previous projects performed for the Government, cannot be considered as a part of the proposal unless physically incorporated in the proposal.
All information must be presented in sufficient depth for the Government to make a comprehensive evaluation of the offeror’s understanding of the work package and of the offeror’s capability to successfully perform the work package.
The proposal should demonstrate this understanding and capability in a concise, logical manner and should not contain superfluous material not directly related to the solicitation.
L-3 SPECIFICATION CLARIFICATION
Offerors may use the RFC, provided in attachment J-8, to request clarification of any WI specification or contract term. No verbal requests for information will be accepted by the KO or his technical representative. Offerors’ questions must be submitted to the KO in writing. All requests for specification clarification must be received by MSC Norfolk no later than September 20, 2019 at 1200 hrs Eastern Standard Time (EST).
L-4 NOTICE TO OFFERORS (FEB 2000)
(a) Sealed proposals will be received by the KO and will be opened at the hour and at the date specified in the solicitation for the performance of the work specified in the solicitation and in accordance with the terms of the Master Agreement for Repair and Alteration of Vessels, as amended through the date of this solicitation.
(b) Any drawings and specifications referenced in this solicitation are an integral part of the solicitation.
(c) The work shall be completed on or before close of business on the completion date of the period indicated in Section F.
(d) Liquidated damages as specified in Section F shall be payable by the contractor to the Government IAW FAR Clause 52.211-11.
(e) In submitting a solicitation response for Ship Repair, a vendor must cite the above solicitation number and each amendment thereto, if any, and must respond to each certification in this solicitation.
(f) The Government cannot guarantee that an application for a security clearance (if required) can be processed in the time between the solicitation closing and the time of award.
L-5 INSPECTION OF VESSEL / PRE-PROPOSAL CONFERENCE -
Inspection for the USNS COMFORT will take place on the sister ship USNS MERCY at Pier 2 Naval Station San Diego, CA, on September 5, 2019_at 1200hrs Eastern Standard Time (EST). Inspection is not mandatory and shall be at the offeror’s expense.
The point of contact for the inspection/shipcheck will be:
Steve Destree, PPE USNS COMFORT (757) 462-2495 Office Steven.destree@navy.mil
Offerors who plan to inspect the vessel must complete the registration process in accordance with L-6, “Ship & Base Access,” below. Personnel who fail to pre-register will, at best, experience protracted delays in accessing the vessel.
A second inspection will NOT be scheduled.
Contractor’s failure to investigate, pursuant to the site inspection clause in the solicitation, general and local conditions potentially affecting the work or its cost, will not relieve Contractor’s responsibility for properly estimating the cost of successful performance of the work, or for proceeding to successfully perform the work, without additional expense to the Government.
L-6 SHIP & BASE ACCESS (NOV 2017)
Vendors are responsible for correctly submitting forms/applications. Vendors are encouraged to monitor email using “Request a Read Receipt” function and to confirm receipt of facsimile transmissions.
Due to enhanced security measures, ship and base access is required for pre-award ship visits (e.g. ship-check) and for contract performance. Specifically the following permissions are required:
1. Base/Repair Facility Access Request
2. Vehicle Access Request
3. Ship Access List (vendor-provided)
All forms are available for download on the MSC contracts webpage at http://www.msc.navy.mil. Click on “Contracts” in the upper right corner. Click on “Online Library of Common Documents” for all forms.
Base/Repair Facility Access: Permit is required to access Navy facilities. Base/Repair Facility Access Request is desired seven days prior to ship-check or performance start date. Submit forms per the document instruction and to the PPE.
DBIDS is being implemented for access to DoD facilities in CONUS, HI, Guam and Puerto Rico (replaces RapidGate). Vendor is responsible to acquire DBIDS credentials prior to performance start date. Delays that may result from inadequate planning are contractor responsibility. Vendor instructions and program information is available at https://www.cnic.navy.mil/om/dbids.html. DBIDS credentials require (in succession) (1) Present a letter or official document from the Government-sponsoring organization that provides the purpose for your access, (2) Present valid identification, such as a passport or Real ID Act-compliant state driver's license, (3) Present a completed copy of the SECNAV 5512/1 form to obtain your background check, (4) Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments, and (5) After all of this is done, the contractor will be provided with the DBDIS credential. For vendors with existing Navy Commercial Access Control System (NCACS) cards, see https://www.cnic.navy.mil/om/dbids.html for instructions to obtain DBIDS credentials. Vendor is responsible to confirm that each employee-held DBIDS credential is active for the specific facility and performance period in accordance with DBIDS.
Additional access permissions may be required in the future.
Vehicle Access: Required for vehicle access to Navy facilities. Follow supplemental instructions on Base Access forms or base-specific vehicle access forms.
Ship Access List (Vendor-Provided): On company letterhead attachment via email, the vendor is required to provide the ship master (courtesy copy the Port Engineer, Chief Mate, and Chief Engineer) with an accurate, current list of visiting personnel prior to being admitted aboard the vessel. This list shall include name, title, and company name. No PII shall be submitted. Under no circumstances will a hand-delivered list be accepted. Please ensure that this list is submitted at least four (4) days prior to the scheduled site visit.
master.mercy@mercy.navy.mil chmate.mercy@mercy.navy.mil cheng.mercy@mercy.navy.mil joe.schumacher@navy.mil Steven.destree@navy.mil
(End of Text)
L-7 RESERVED
L-8 RESERVED
L-9 SECTION B SUBMISSION INSTRUCTIONS
The contractor shall follow the instructions stated below when completing Section B:
CLIN 0001 – The contractor shall complete CLIN 0001 NET AMT, each of the fill-in items stated in the extended description, and complete Attachment J-2 – Category “A” WIs.
http://www.msc.navy.mil/ https://www.cnic.navy.mil/om/dbids.html https://www.cnic.navy.mil/om/dbids.html
CLIN 0002: Indicate the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates will be used in evaluating the offeror's proposal and shall be the rates for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by Contractors. Offerors shall include a FBLR to be used in negotiating changes. The rate must include all costs for negotiating changes, including but not limited to, G&A, overhead, profit, supervision, consumables, and/or support functions, etc. Additionally, offerors shall include G&A and profit rates for ODC to be used for negotiating changes. The offeror shall insert these rates in CLIN 0002, above that it agrees to use in negotiating changes for supplemental, emergent, and new work. These rates shall prevail throughout the duration of the contract’s period of performance even when the period of performance is extended/modified. The number of man-hours and ODC base are estimates for evaluation purposes; the actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
Abrasive cleaning/blasting Tank cleaning Welding Machinists (inside and outside) Burning Brazing Carpentry Electrical work Electronic work Shipfitting Lagging Painting Boilermaking Pipefitting Sheetmetal work Engineering Rigging Staging/scaffolding General labor Fire Watch
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:
Testing Quality Assurance Planning Cleaning (except tank cleaning) Material handling & Warehousing Security Surveying Administration Transportation Purchasing staff Lofting Other indirect support Supervision
Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.
The rates proposed for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.
The base cost does not include the profit or G&A rates. Include the final figure that results when proposed profit and G&A rates are applied to the base price of the contractor’s total price for evaluation purposes.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs should be included under CLIN 0001.
CLINs 0003– The offeror shall complete CLIN 0003 NET AMT, each of the fill-in items, and complete Attachment J-3 – Category “B” WIs.
Addendum to 52.233-2 SERVICE OF PROTEST
Interested parties may request an independent review of their protest as an alternative to consideration by the KO or as an appeal of the KO’s decision on their protest. See FAR 33.103. Requests for independent review shall be addressed to Code N10 or N10X, Military Sealift Command, SP 64, 471 East C Street, Norfolk, VA 23511-2419.
MSC encourages potential protesters to discuss their concerns with the KO prior to filing a protest.
The following have been deleted:
252.215-7008 Only One Offer OCT 2013
(End of Summary of Changes)
File details come from the government source that posted it.