0701__(REV_A)_MIN_LB_DECK_REFURBISHMENT_Specifiction.pdf

PDF 271 KB Posted

Attached to
USNS MERCY (T-AH 19) Mid-Term Availability Federal contract opportunity
Solicitation number
N32205-19-R-6502
Issued by
Department of the Navy Military Sealift Command

About this file

Revised Work Item 0701 (Rev A)

View the file

Other files for this federal contract opportunity

Other files attached to USNS MERCY (T-AH 19) Mid-Term Availability, newest first.
File Type Posted
N32205-19-R-6502-0005.pdf PDF
RFC_004.pdf PDF
N32205-19-R-6502-0004.pdf PDF
RFC_003.pdf PDF
0703__(REV_A)_PRC_REPIR_02-52-0_SCULLERY_Specifiction.pdf PDF
0518__(REV_A)FWD_GLLEY_STEM_TBLE_DRIN_PIPE_REPIR_(18-008).pdf PDF
0702__(REV_A)_PRC_REPIRS_02_LEVEL_FR42-62_Specifiction.pdf PDF
RFC_002.pdf PDF
N3220519R6502-0003.pdf PDF
J-8_RFC_(001).pdf PDF
Solicitation_Amendment_(0002).pdf PDF
N3220519R6502_0001.pdf PDF
MERCY_FY-19_MTA_JA__.pdf PDF
J-Attachments_.zip ZIP file
N3220519R6502_USNS_MERCY_.pdf PDF
SYNOPSIS_N3220519R6502.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS Mercy

( TAH 19 )

SPONSOR RELATED CONTRACT NO. N32205-19-R-6502

ITEM NO. 0701 (REV A) CATEGORY "A" 2019-03-14

MAIN LAB DECK REFURBISHMENT Schumacher, Joe

0701 - 1

1. ABSTRACT

1.1. This item describes the requirements for the contractor to accomplish PRC decking s in various locations in 01 Level Main Lab area.

2. REFERENCES/ENCLOSURES

2.1. References:

2.1.1. NAVSEA TECHNICAL MANUAL CHAPTER 634 “Deck Coverings”

2.1.2. Steel Structures Painting Council, Systems and Specifications, Volume 2

2.2. Enclosures: None.

3. ITEM LOCATION/DESCRIPTION

3.1. Location/Quantity

3.1.1. Location:

3.1.1.1. 01-72-0 Main Lab

3.1.1.2. 01-79-0 Bacteriology

3.1.1.3. 01-77-2 Storeroom

3.1.1.4. 01-75-1 Office

3.1.1.5. 01-79-1 Media Reference

3.1.1.6. 01-78-2 Glass Wash Room

3.1.2. Quantity: Approximately 3200 total square feet of deck

3.2. Quantities where stated are considered estimates. The contractor shall provide the exact quantities and additional material such as miscellaneous fittings, elbows, caps, valves, pipe hangers, weld material, cable hangers, cable tags, bus-work, etc., which are not included in the Bill of Materials, in order to install a fully functional system which meets the requirements of this specification.

4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5. NOTES

5.1. The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1-7, 22, 23, 28, and 29. GTRs can be obtained from the following URL:

http://www.msc.navy.mil/instructions/pdf/m470016.pdf

5.2. The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 0001.

6. QUALITY ASSURANCE REQUIREMENTS

http://www.msc.navy.mil/instructions/pdf/m470016.pdf

SPONSOR RELATED CONTRACT NO. N32205-19-R-6502

0701 - 2

6.1. In addition to the contractor’s duties under 29CFR1910.147 or similar local safety regulation, the contractor shall comply with all requirements of equipment lock-out/tag-out (LOTO) program as established by MSC SMS procedure 2.1-004-ALL Lock-out/Tag-out. The Chief Engineer shall administer the program. Prior to the start of work, the contractor shall contact the MSCREP and / or the Chief Engineer to coordinate the implementation of the LOTO program for the entire performance period of this item. The prime contractor shall be responsible for compliance by both prime and subcontractor personnel.

7. STATEMENT OF WORK

7.1. Arrangements/Outfitting:

7.1.1. Provide all material and special equipment. Make all removals and restorations.

Remove and replace all interferences (necessary to remove and replace the existing deck covering and replace with PRC Deck Covering), rig and unrig, stage and unstage, make all disassemblies and subsequent reassemblies, provide and operate equipment, and supply all services and assistance to accomplish the following work. (Material, unless specifically stated as Government Furnished Material (GFM) shall be supplied by the contractor).

7.1.1.1. Restoration shall include complete replacement to the vinyl cove base throughout the spaces listed in 3.1.

7.1.2. Provide and install temporary exhaust and supply dehumidified (DH) ventilation to each space listed in 3.1 to/from the weather deck to remove dust and fumes and provide dry air supply to accelerate the hard cure of the new PRC deck coating.

7.1.2.1. Secure the temporary ducting in the overhead to prevent tripping hazard. Remove the temporary ventilation when all work is complete.

7.2. PRC deck complete renewal:

7.2.1. Remove and dispose of the areas of deck and underlayment identified above as requiring complete removal.

7.2.1.1. For bidding purposes, assume a total of 3200 sqft will require complete removal to the underlying steel deck.

7.2.1.2. If greater than 3200 sqft of surface area is identified as requiring complete replacement, the additional work and material will be the subject of a change order.

7.2.2. Accomplish the requirements of SSPC-SP3 to mechanically scale, clean and solvent wipe all areas of exposed steel deck, adjoining bulkheads in way of the deck and underlayment removed.

7.2.2.1. CHECKPOINT: Prior to applying the paint system the MSCREP paint rep shall inspect and approve the deck surface preparation.

7.2.3. Provide and apply a paint system compatible with the underlayment to the exposed steel surfaces in accordance with the manufacturer’s instructions.

SPONSOR RELATED CONTRACT NO. N32205-19-R-6502

0701 - 3

7.2.4. Install new deck underlayment compatible with PRC deck covering to the areas where the original deck was removed to restore the surface to a smooth, level and continuous deck form.

7.2.4.1. CHECKPOINT: Prior to applying the underlayment system the MSCREP paint rep shall inspect and approve the deck is acceptable for the installation of underlayment.

7.3. PRC coating application

7.3.1. Accomplish the requirements of SSPC-SP3 to mechanically abrade, clean and solvent wipe all areas of existing deck surfaces to prepare the surface for the installation of new PRC decking covering.

7.3.2. Provide and install new install new PRC decking coating system approved for Marine Use in the spaces listed in 3.1. The PRC deck coating system shall be Buff with White flakes and two coats of clear coat gloss sealer.

7.3.3. The PRC deck coating system shall extend above the existing edges up 4” on all vertical surfaces to seal the seam between the deck covering and the bulkhead.

7.3.4. The new system shall be free of defects and imperfections.

7.3.5. Wipe down, detergent wash and clean the entire space; all bulkheads, overhead, light fixtures, book shelves, office equipment and furnishings to remove all dust and dirt and debris.

7.4. Preparation of Drawings/Documentation: None.

7.5. Inspection/Test:

7.5.1. Carry out a final acceptance inspection of the deck with MSCREP for air bubbles and imperfections in the new PRC Deck. Sand out, recolor and reseal as required to provide a professionally installed continuous PRC deck coating.

7.6. Painting:

7.6.1. Mechanically clean, prime and paint all new and disturbed surfaces to match surrounding areas.

7.7. Marking:

7.7.1. Install name plates, notices, cable tags, and markings for all new and modified systems.

7.8. Manufacturer’s Representative: None.

8. GENERAL REQUIREMENTS: None.