SYNOPSIS_N32205-18-R-4553.docx
DOCX document 33 KB Posted
- Attached to
- SOLICITATION USNS SIOUX (T-ATF 171) Federal contract opportunity
- Solicitation number
- N3220518R4553
About this file
SYNOPSIS USNS SIOUX (T-ATF 171)
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N10 - CONTRACTS AND BUSINESS MANAGEMENT DIRECTORATE
Military Sealift Command Synopsis
1. Action Code: Pre-solicitation
2. Date: 26 April 2018
3. Fiscal Year: 2018
4. Contracting Office Zip Code: 23511
5. Classification Code: J999
6. Contracting Office Address: 471 East C Street, Norfolk VA 23511-2419
7. Subject: USNS SIOUX (T-ATF 171) Regular Overhaul/Dry-docking Availability
8. Proposed Solicitation Number: N32205-18-R-4553
9. Closing Response Date: 11 May 2018
10. Contact Point or Contracting Officer: Tyshawn Neals, 757-443-5962, tyshawn.neals@navy.mil
11. Contract Award and Solicitation Number: N32205-18-C-4553 and N32205-18-R-4553
12. Contract Award Dollar Amount: TBD
13. Contract Line Item Number(s): 0001, 0002, 0003, 0004, 0005 and 0006
14. Contract Award Date: TBD
15. Contractor: TBD
16. Description: MSC intends to award a contract for the Regular Overhaul and Dry-docking Availability of the USNS SIOUX (T-ATF 171) to be performed on the Gulf/West Coast. This work package includes approximately 70 work items with a sample of Work Items to be accomplished list below:
| 1) | Port and Starboard Stacks Metal Replacement |
| 2) | 02 level deck repairs |
| 3) | House Painting and Preservation |
| 4) | 01 Level Port Side Cable Pass Through Repairs |
| 5) | Controllable Pitch Propeller System Groom and Adjustment |
| 6) | Change out Port and Starboard CPP and MRG oil coolers |
| 7) | Switch Board and Motor Controller Cleaning/Inspection |
| 8) | Electric Motor Repairs |
| 9) | GMDSS Recertification |
| 10) | Preserve and Paint Main CHT Tank, Remove and Overhaul CHT Overboard Diverter Valve, remove existing 4-inch gate valve and Install 4-inch scupper valve |
11) Replacement of Traction Machine Heat Exchangers
| 12) | Overhaul Port and Starboard Anchor Windlass |
| 13) | Replace 1 and 2 Fresh Water Pumps |
| 14) | Annual Maintenance and Certification of Ship’s Crane |
| 15) | Clean Ship’s HVAC System |
| 16) | Underwater Hull Preservation |
| 17) | Underwater Hull Inspection cleaning and Propeller Polish |
| 18) | Shafting and CPP Propeller Overhaul |
a. Unit of issue: Each
b. Performance location information: Gulf/West Coast, USA.
c. Delivery schedule: POP, commence 1 October 2018 for approximately 60 days.
d. Procedures: FAR part 15
| e. | Anticipated Award Date: 1 August 2018 |
| f. | The solicitation will be made available on www.fbo.gov on or about 21 May 2018 |
g. Set-aside Status: Full and Open
17. The decision to solicit Full and Open was based off Market Research. MSC received interest from one small business under NAICS 336611, which has a size standard of 1,250 employees. The MSC Small Business representative concurs with the decision to solicit this requirement Full and Open.
V1.1 (17 June 2014)
File details come from the government source that posted it.