Revised Work Item 0607 Rev A
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS SIOUX
T-ATF 171
HABITABILITY RFP NO. N32205-18-R-4553
March 2018
ITEM NO. 0607 CATEGORY "A" MSC/LA
TITLE: TRANSIENT QUARTERS DECK COATING, RENEWAL
0607-1
1.0 ABSTRACT
1.1 This work item requires the contractor to provide labor, material and equipment, to completely remove the Transient Quarters existing deck coating system down to bare steel and renew with PRC or equal deck coating system.
2.0 REFERENCES/ENCLOSURES
2.1 Booklet of General Plans – Drawing 4842478
3.0 ITEM LOCATION/DESCRIPTION/QUANTITY
3.1 Location/Description
a. Transient Quarters (2-29-1-L), including Engine Utility/Radio Officer SR (2-
34-1-L) MILDET SR (2-32-2-L), shower area and stalls.
3.2 Quantity
a. Deck area – approximately 468 square feet. The actual deck area is to be determined by Contractor during Bidder Ship Check.
Note: Quantities of materials below to be determined by Contractor at Bidder Ship
Check.
b. Primer, Amercoat 240 or equal, two coats, 3-5 mils DFT per coat on all prepared surfaces.
c. Enamel Paint of matching colors to touch up disturbed surfaces of doors, bulkheads and furniture.
c. Paint supplies.
d. PRC or equal deck coating system.
4.0 GOVERNMENT FURNISHED SERVICES (GFS)
4.1 Paint Representative (NACE Certified Coatings Inspector)
5.0 NOTES
5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR 1 through 7 and 25.
5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
HABITABILITY RFP NO. N32205-18-R-4553
March 2018
ITEM NO. 0607 CATEGORY "A" MSC/LA
0607-2
5.3 This work item is to be considered “Time Sensitive” and must be completed seven
(7) days prior to “Crew Move Aboard”.
5.4 All sizes, dimensions, and quantities provided are approximate. The contractor shall verify all sizes, dimensions, and quantities prior to commencement of repairs.
5.5 The available deck coating system colors shall be presented to and approved by the Ship’s Master during bidder ship check.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK REQUIRED
7.1 Contractor to provide labor, material and equipment, to completely remove the Transient Quarters existing deck coating system down to bare steel and renew with PRC or equal deck coating system.
7.2 Provide adequate lighting and forced ventilation from the work space to remove fumes and dust for the duration of this work item
7.3 Provide a dust barrier of heavy mil plastic sheeting across the entry into the work space and over all permanently mounted furniture. This barrier shall be maintained daily for the duration of this work item.
7.4 Perform a preliminary and final flow test of deck drains to prove to the MSCREP that drains run free.
7.5 Cover and protect floor drains and shower drain openings.
7.6 Cover and protect the lower one foot of doors, bulkheads and furniture.
7.7 Upon cure and final inspection of the new deck coating system by the MSCREP, accomplish the following work clean dust and debris from vertical and horizontal surfaces in the work area and any adjacent areas resulting in contamination by this Item.
7.8 Remove all protective plastic sheeting and drain covers. Work areas shall be left clean and in good order. Install deck protection same as stated in Work Item 011 to protect deck until the ship departs for Sea Trials and return and reinstall all items removed from the work space.
HABITABILITY RFP NO. N32205-18-R-4553
March 2018
ITEM NO. 0607 CATEGORY "A" MSC/LA
0607-3
7.9 Remove all existing loose outfitting and furnishing from the Transient Quarters including but not limited to bedding, privacy curtain, mattresses, chairs and contents of drawers. Do not remove deck welded furniture.
7.10 Palletize, shrink wrap and store these items at the Contractor’s Warehouse in a dry, clean, space.
7.11 Mechanically remove all of the existing deck coating system down to bare steel.
7.12 Mechanically clean to SSPC-SP3, the entire deck surface of rust and remaining coatings.
7.13 Provide a condition report to the MSCREP of the steel deck, deck penetrations bunk and desk foundations and bulkheads along the deck level and up 6”.
7.14 For bid purposes, mechanically clean to SSPC-SP3, an additional 100 square feet of surface area from piping penetrations, bunk and desk foundations and lower bulkhead surfaces from the deck up 6”.
7.15 The MSCREP shall approve deck preparation work and provide authorization to proceed with work.
7.16 Apply primer to all prepared surfaces using Amercoat 240 or as directed by the MSCREP. Apply two coats, 3-5 mils DFT per coat.
7.17 Coordinate with the MSC Representative to inspect primer coat DFT thickness. The MSCREP will provide approval to proceed with installation of the deck coating system.
7.18 Upon completion and cure of the deck coating system installation, prepare, and paint all disturbed areas including bulkheads, doors and permanent furniture bases. Utilize Contractor furnished enamel paint to match original colors of disturbed surfaces.
7.19 Install PRC or equal deck coating system on Transient Quarters deck described in Para 3.0. Install in accordance with manufacturer’s instructions. Insure coating system is properly sloped toward the deck drains.
HABITABILITY RFP NO. N32205-18-R-4553
March 2018
ITEM NO. 0607 CATEGORY "A" MSC/LA
0607-4
7.20 In the presence of the MSCREP, prove proper deck slope test by pouring water around the deck perimeter while observing direction of flow.
7.21 Contractor shall remove and renew the overhead tiles and supporting rails in the transient quarter’s head area. Replace tiles and supporting rails with material of like kind. Note: only stainless steel material is to be used.
7.22 In the transient living area and the two officer stateroom on the port and starboard side, contractor shall remove the overhead tiles and supporting rails and renew with U.S Joiner C562 24x 24 fire rated celling panels.
7.23 For bidding purposes contractor shall bid on replacing approximately 3600 square feet of ceiling tile in the living area and approximately 150 square feet of stainless steel tile in the shower area.
7.24 Turn over any excess un-used and complete tile panels to the ship’s chief mate.
7.25 Clean the work area and remove all debris from the space.
8.0 GENERAL REQUIREMENTS: None additional