RFC 15 NOV 17

View the file

Other files for this federal contract opportunity

Other files attached to USNS ZEUS MTA SOLICITATION, newest first.
File Type Posted
Q01_-_024_REQUEST_FOR_SPECIFICATION_CLARIFICATION_Answer.DOCX DOCX document
Requests_for_clarification_ZEUS_MTA.docx DOCX document
Q19_-_011_REQUEST_FOR_SPECIFICATION_CLARIFICATION__answered.docx DOCX document
Q23_-_012_REQUEST_FOR_SPECIFICATION_CLARIFICATION_Answered.docx DOCX document
J_-_8_RFC_6_-_WI_106_-_fwd_port_cable_drum_pres_Answered.doc DOC document
J_-_8_Request_for_Spec_Clarification_-_ZEUS_answered.doc DOC document
J_-_8_RFC_5_-_WI_102_-_anti-roll_tk_answered.doc DOC document
J_-_8_RFC_8_-_WI_112_-_cable_drum_mach_spaces_answered.doc DOC document
J_-_8_RFC_7_-_WI_110_-_cable_deck_pres_Answered.doc DOC document
RFC_2_J_-_8_-_WI_513_-_Refs_Answered.doc DOC document
RFC_1__J_-_8_-_WI_303_-_Refs_Answered.doc DOC document
RFC_3_J-8_-_WI_505_-_Answered.doc DOC document
RFC_4_J-8__-_WI_603_-_hvac_ref_answered.doc DOC document
J_-_8_Request_for_Spec_Clarification_-_ZEUS.doc DOC document
J_-_12_Past_Performance_Data_-_ZEUS.doc DOC document
J_-_14_Technical_Data_Non-Disclosure_-_ZEUS.docx DOCX document
J_-_2_Category_A_Items_-_SMALL_BUSINESS_SET_ASIDE.xlsx XLSX spreadsheet
J-10_Interport_Differential.doc DOC document
J_-_7_MSC_Ship_Repair_Facility_Survey_-_ZEUS.docx DOCX document
18-R-4100_FINAL_SOLICITATION.docx DOCX document
J_-_9_Disclosure_of_Lobbying_Activities_-_ZEUS.doc DOC document
J_-_13_Past_Performance_Questionnaire_-_ZEUS.docx DOCX document
J-4_Zeus_FY_18_MTA_Scheduled_GFP.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ZEUS (T-ARC 7) N32205-18-R-4100

REQUEST FOR SPECIFICATION CLARIFICATION

QUESTION NO.: _33_______

SPECIFICATION ITEM NO.: 0301___

PARAGRAPH :_4.0 & 7.2.4__

TITLE: Switchboard Cleaning

QUESTION:

Paragraph 7.2.4 requrires replacement of Over/Under Voltage Relays on the Main Switchboard using GFM.

Paragraph 4.0 does not identify any material as being provided by the government.

Are all required Over/Under Voltage Relays being provided by the Government? If so, how many are being provided?

If not, how many are to be provided by the Contractor and what are the specific model/part numbers for ordering the required units?

ANSWER:

Paragraph 7.2.4 can be deleted. It is not required.

QUESTION NO.: _37_______

SPECIFICATION ITEM NO.: 0307___

PARAGRAPH :_7.4.1.1, 7.4.1.2, 7.4.1.3, and 7.4.1.4__

TITLE: Cable Transporter Power Cable Receptacle Installation

QUESTION:

Paragraph 7.4.1.1 states that contractor shall install new power panel.

A) Is the required power panel Item Number 4 as identified on Reference 2.1? If not, please identify by reference drawing.

B) Who is responsible for providing the new power panel?

Paragraph 7.4.1.2 states that contractor shall install new power distribution enclosure.

C) Is the required power distribution enclosure Item Number 3 as identified on Reference 2.1? If not, please identify by reference drawing.

D) Who is responsible for providing the new power distribution enclosure?

Paragraph 7.4.1.4 states that contractor shall provide and install new power cable, LSTSGU-50 and LSTSGU-200.

E) Is the quantity of cable required by paragraph 7.4.1.4 the quantity of cable that is to be installed by paragraph 7.4.1.1 and 7.4.1.3?

All Material listed on Reference 2.1 is to be installing activity furnished (IAF)

A.) Yes

B.) IAF

C.) Yes

D.) IAF

E.) Yes, The quantity of cable is an estimate for the entire installation.

QUESTION NO.: _38_______

SPECIFICATION ITEM NO.: 0307___

PARAGRAPH :_7.9.1__

TITLE: Cable Transporter Power Cable Receptacle Installation

Paragraph 7.9.1 includes “Error! Reference source not found.”

Please advise.

ANSWER:

See Paragraph below.

7.9.1 New, permanently fixed cable tags, nameplates, warning notices, and markings shall be installed for all new and modified systems (or areas), using References 2.1 and GTR No. 29 as guidance. Reference 2.1 lists and defines the content of the cable tags, nameplates, notices, and markers.

QUESTION NO.: _47______

SPECIFICATION ITEM NO.: WI 604____

PARAGRAPH :_2.1.2 & 2.1.3_

TITLE: Rescue Boat and Davit Annual Inspection

References 2.1.2 and 2.1.3 have not been provided.

Please provide References 2.1.2 and 2.1.3.

References attached.

QUESTION NO.: _49______

SPECIFICATION ITEM NO.: WI 605____

PARAGRAPH :_4.1.3 and 7.2.1

TITLE: Install Furniture in Sponsor Staterooms

QUESTION:

A) What specific components are included in “One (1) Entertainment System”?

B) Is the contractor required to perform any function other than removing existing components and mounting new equipment? If so, what specific requirements are necessary to be performed for the newly installed equipment?

C) If requirements include programming of equipment, what is the brand name and quantity of each component to be programmed?

ANSWER:

A.) Specific components are not known at this time.

B.) There are no additional requirements.

C.) Programming of equipment will not be required by the shipyard.

QUESTION NO.: _63_______

SPECIFICATION ITEM NO.: Solicitation ____

PARAGRAPH :_ __

TITLE: Solicitation

Will the ship’s crew remain on board the ship during the overhaul period?

No the crew will not remain onboard during overhaul period.

QUESTION NO.: _64_______

SPECIFICATION ITEM NO.: 107 ____

PARAGRAPH :_7.2 and following paragraphs __

TITLE: Side Port Doors Refurbishment

QUESTION:

Paragraph 3.0 identifies location of components to be repaired.

Paragraph 7.2 and following paragraphs require removal and repair of doors identified in paragraph 3.0.

Paragraph 3.1.2 identifies hatch, Two (2) Ea, 72” x 81”, Are the hatches identified in paragraph 3.1.2 to be removed and repaired?

Item is misidentified as a hatch. They are water tight doors and need to be repaired per the work item. Paragraph 3.1.2 should read as follows:

3.1.2 Two (2) Ea, Water Tight Doors 72” x 81”, Double door, Third deck port, 3-40.5-1, 3-40.5-4

QUESTION NO.: _65_______

SPECIFICATION ITEM NO.: 108 ____

PARAGRAPH :_3.1.3 __

TITLE: Hatch Refurbishment

QUESTION:

Paragraph 3.1.3 identifies Hatch as being located on Second Deck port, 2-40.5-1

General Arrangement drawings indicate that the hatch identified in paragraph 3.1.3 is located on the starboard side at approximately the same frame number.

Please confirm location of hatch listed in paragraph 3.1.3.

The hatch is on the starboard side. Paragragh 3.1.3 should read as follows:

3.1.3 One (1) , Hatch 8’ x 8’ Second deck, starboard, 2-40.5-1, ATTACHMENT J - 8