J_-_8_RFC_8_-_WI_112_-_cable_drum_mach_spaces_answered.doc
DOC document 38 KB Posted
- Attached to
- USNS ZEUS MTA SOLICITATION Federal contract opportunity
- Solicitation number
- N3220518R4100
About this file
Any files/drawings/references reference by this RFC can be received upon request to norma.rehbein@navy.mil. A techncial non-disclosure must be on file.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS ZEUS (T-ARC 7)
N32205-18-R-4100
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: 0112
PARAGRAPH / SECTION NO:Various
TITLE: CABLE DRUM MACHINERY SPACES PRESERVATION
QUESTION:
1.
Please confirm that the provided surface area of 4500 sq.ft. (3.2) is the total work area for the item. Is this the area for both spaces or for each space?
2.
Paragraph 1.1 directs contractor to preserve the forward and aft cable machinery rooms. Paragraph 7.1 provides additional direction for both spaces. However, paragraphs 7.1.7, 7.1.8, 7.1.9 etc. only address only the FWD cable drum machinery room as listed in 3.1.1. Is only the forward space to be preserved or is this a misprint?
3.
Paragraph 7.1.8 directs contractor to remove the existing deck covering. Please identify the type of existing covering, i.e. epoxy paint, heavy non-skid, rubber underlayment, concrete, tile etc.
4.
Paragraph 7.1.8 also says “including cove base material.” Please identify this material as well.
ANSWER:
1. Surface area provided in paragraph 3.2 is approximate area for both spaces listed in 3.2
2. Paragraphs 7.1.7, 7.1.8, 7.1.9 should read for spaces listed in 3.1 not 3.1.1. Both forward and aft cable machinery spaces are to be preserved.
3. Existing deck is epoxy paint.
4. Cove base is also paint.
ATTACHMENT J - 8