N3220518R4007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SECTION 000 – GENERAL SERVICES
| 001 | INTENT, SCOPE, GEN REQUIREMENTS & DEFINITIONS | NSP | |||||||
| 002 | TECHNICAL AND MANUFATURER’S REPRESENTATIVES | NSP | |||||||
| 003 | APPROACH, BERTHING AND MOORING | NSP | |||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | |||||||
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP | |||||||
| 006 | HEAVY WEATHER PLAN | NSP | |||||||
| 007 | COLD WEATHER PLAN | NSP | |||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | A | |||||||
| 011 | GENERAL SERVICES FOR SHIP | A | |||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | A | |||||||
| 013 | PROJECT PLAN AND MONITORING | A | |||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | A | |||||||
| 015 | INTEGRATED LOGISTICS SUPPORT REQUIREMENTS, GFM | A | |||||||
| 016 | FIRE PROTECTION AND SHIP SAFETY PROGRAM | A | |||||||
| 017 | HANDLING SHIP’S STORES | A | |||||||
| 018 | DELIVERY AND REDELIVERY OF SHIP | A | |||||||
| 019 | SHIPBOARD ACCESS | A | |||||||
| 020 | GAS FREE CERTIFICATES | A | |||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS AND COFFERDAMS | A | |||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | A | |||||||
| 023 | HAZARDOUS WASTE DISPOSAL | A | |||||||
| 024 | PHYSICAL SECURITYAT PRIVATE CONTRACTOR’S FACILITY | NSP | |||||||
| 025 | PHYSICAL SECURITYAT PRIVATE CONTRACTOR’S FACILITY | B | |||||||
| 030 | CONTINUATION OF SERVICES | B |
SECTION 100 – HULL STRUCTURE
| 101 | VERTICAL LADDER REPAIRS | A | |||||
| 102 | NON-SKID RECOAT | A | |||||
| 103 | TANK DECK RISER PRESERVATION AND REPAIR | A | |||||
| 104 | REMOVED | ||||||
| 105 | MISC STEEL REPAIRS, MAIN DECK & 05 LEVEL REV-A | A | |||||
| 106 | REMOVED | ||||||
| 107 | STRUCTURAL STEEL REPAIRS | B | |||||
| 108 | INTERIOR JOINER DOOR REPLACEMENT | A | |||||
| 109 | ACCOM LADDER REPAIRS AND WEIGHT TEST | A | |||||
| 110 | REMOVED | ||||||
| 111 | REMOVED | ||||||
| 112 | ZINC ANODE FASTENER REPLACEMENT | B | |||||
| 113 | STABILITY TEST | A |
SECTION 200 – MACHINERY, PROPULSION
| 201 | MAIN ENGINE 12,000 HOUR OVERHAUL | A | ||
| 202 | FUEL INJECTOR OVERHAUL | A | ||
| 203 | OIL MIST DETECTOR CALIBRATION AND SERVICE | A | ||
| 204 | NOT USED | |||
| 205 | PTO CLUTCH OPEN-INSPECT | A | ||
| 206 | OVERHAUL MAIN ENGINE TURBO CHARGERS | A |
SECTION 300 – ELECTRICAL
| 301 | THERMOGRAPHIC SURVEY OF MOTOR CONTROL CENTERS | A | ||||
| 302 | PTO GENERATOR GROOM | A | ||||
| 303 | ANNUAL GENERATOR MAINTENANCE | A | ||||
| 304 | NOT USED | |||||
| 305 | PTO CLUTCH AIR CONTROL PANEL REPLACEMENT | A | ||||
| 306 | CABLE TRANSIT A-60 BOUNDARY SURVEY AND REPAIRS REV-B | A |
SECTION 400 – COMMUNICATION AND NAVIGATION
| 401 | ANNUAL RADAR AND ECDIS MAINTENANCE | A | ||||
| 402 | ANNUAL NAVIGAT X GYRO SYSTEM PREVENTIVE MAINTENANCE | A | ||||
| 403 | ANNUAL GMDSS RECERTIFICATION | A | ||||
| 404 | ANNUAL SVDR RECERTIFICATION | A | ||||
| 405 | ANNUAL MAGNETIC COMPASS ANNUAL MAINT, SERVICE AND ADJUSTMENT | A | ||||
| 406 | REMOVED | |||||
| 407 | UHF SATCOM AND LOS TRANSCEIVER GROOM | A | ||||
| 408 | DOPPLER SPEED LOG MAINTENANCE | A | ||||
| 409 | FATHOMETER DUAL TRANSDUCER MAINTENANCE | A | ||||
| 410 | URT-23 AND URR-2368 HF SET GROOM | A | ||||
| 411 | AVAY TELEPHONE SYSTEM GROOM | A | ||||
| 412 | HAND HELD RADIO TRANSCEIVER RADIO SYTEM MODERNIZATION | A | ||||
| 413 | ANTENNA MAINTENANCE, WHIP AND DIPOLE | A |
SECTION 500 – MACHINERY, AUXILIARY SYSTEMS
| 501 | SCBA COMPRESSOR/REFILL STATION ANNUAL SERVICING | A | ||||||
| 502 | AUXILIARY BOILER MAINTENANCE, INSPECTION AND TEST | A | ||||||
| 503 | ATLAS INCINERATOR TROUBLESHOOT AND REPAIR | A | ||||||
| 504 | NO 1 & NO 2 DISTILLER PLANT OVERHAUL | A | ||||||
| 505 | SSDG MAINTENANCE (BERGEN 50,000 HOUR) | A | ||||||
| 506 | NO. 1 CONSTANT TENSION (CT) WINCH DRUM REPAIRS | A | ||||||
| 507 | CARGO OIL CONTENT MONITOR CALIBRATION AND REPAIR | A | ||||||
| 508 | ROLLER CURTAIN DOOR REPLACEMENT | A | ||||||
| 509 | OVERHAUL NO. 3 AC SYSTEM COMPRESSOR AND CHILLER | |||||||
| REPLACEMENT | A | |||||||
| 510 | REMOVED | A | ||||||
| 511 | WESTFALIA OILY WATER SEPERATOR SERVICE AND CALIBRATION | A | ||||||
| 512 | NO. 1 DOMESTIC REEFER COMPRESSOR OVERHAUL | A |
SECTION 600 – OUTFIT, FURNISHING AND HABITABILITY
| 601 | ANNUAL OVERHAUL OF FIRE FIGHTING EQUIPMENT | A | |||||
| 602 | INSPECTION OF FIRE HOSES | A | |||||
| 603 | INSPECTION OF AFFF HOSES | A | |||||
| 604 | SCBA EQUIPMENT ANNUAL SERVICING | A | |||||
| 605 | STATEROOM CARPET SHOWER BULKHEAD AND TERRAZZO | A | |||||
| 606 | ANNUAL ELEVATOR SERVICE AND MANITENANCE | A | |||||
| 607 | LIFEBOAT RECERTIFICATION | A | |||||
| 608 | RECERTIFY LIFEBOAT WINCHES AND DAVITS | A | |||||
| 609 | RESCUE BOAT RECERTIFICATION | A | |||||
| 610 | STBD RESCUE BOAT WINCH AND DAVIT INSPECTION | A | |||||
| 611 | ANNUAL PORT RHIB DAVIT AND WINCH INSPECTION | A | |||||
| 612 | ANNUAL LIFERAFT RECERTIFICATION | A | |||||
| 613 | REMOVED | ||||||
| 614 | INSPECTION OF SURVIVAL SUITS | A |
SECTION 800 – HEATING, VENTILATION AND AIR CONDITIONING
| 801 | GALLEY VENTILATION SYSTEM CLEANING | A | ||
| 802 | HOUSE VENTILATION SYSTEM CLEANING | A | ||
| 803 | 06 LEVEL ENGINE ROOM PLENUM REPAIRS | A | ||
| 804 | RECONDITION MISC VENTILATION FANS AND MOTORS | A | ||
| 805 | FIRE AND SMOKE DAMPER SERVICE | A |
SECTION 900 – DRY-DOCKING AND UNDOCKING
| 901 | DRYDOCKING AND UNDOCKING | A | |||||
| 902 | PROPELLER SHAFT WEARDOWN READINGS | A | |||||
| 903 | RUDDER AND STERN FRAME EXAMINATION | A | |||||
| 904 | INSPECTION OF BILGE KEELS | A | |||||
| 905 | PROPELLER SYSTEM MAINTENANCE | A | |||||
| 906 | OVERHAULING SEA VALVES | A | |||||
| 907 | UNDERWATER HULL CLEANING AND PAINTING | A | |||||
| 908 | STERN TUBE SEAL MAINTENANCE | A | |||||
| 909 | ROPE GUARD ZINC REPLACEMENT | A | |||||
| 910 | PROPELLER SHAFT LINE AND NET CUTTER REPLACEMENT | A | |||||
| 911 | CATHODIC PROTECTION SYSTEM | A | |||||
| 912 | MARINE GROWTH INHIBITOR ANODE REPLACEMENT | A | |||||
| 913 | DRYDOCKING AND UNDOCKING | B | |||||
| 914 | REMOVED |
SECTION 1000 – UNREP MACHINERY
| 1001 | RAM SHEAVE BEARING REPLACEMENT AND REFURBISHMENT | A | ||
| 1002 | ASD FOUNDATION REFURBISHMENT | A | ||
| 1003 | WINCH CONTROL BOOTH WINDOW AND STEEL REPLACEMENT | A | ||
| 1004 | SADDLE WINCH MOTOR REPAIRS | A | ||
| 1005 | HAULING WINCH BLOWER SHROUD REPAIRS | A |
SECTION F - DELIVERY AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 14-FEB-2019 TO
14-APR-2019
| N/A |
| N/A |
FOB: Destination
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 30-MAR-2019 TO
28-MAY-2019
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0002 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 14-FEB-2019 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 30-MAR-2019 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0003 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 14-FEB-2019 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 30-MAR-2019 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0004 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 14-FEB-2019 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 30-MAR-2019 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0005 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 14-FEB-2019 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 30-MAR-2019 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0006 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 14-FEB-2019 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 30-MAR-2019 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0007 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 14-FEB-2019 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 30-MAR-2019 TO
| N/A |
| N/A |
The following have been modified:
F-1 SHIP AVAILABILITY PERIOD
It is anticipated the ship will arrive at contractor’s yard on or about 03/30/2019. All work shall be completed in no more than sixty (60) calendar days from actual start date designated by the Government at time of contract award.