Attach_F_Min._Tech._Requirements_Worksheet.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Cable Ship Long-Term Charter Federal contract opportunity
Solicitation number
N32205-18-R-3506
Issued by
Department of the Navy Military Sealift Command

About this file

Attachment F - Minimum Technical Requirements Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Cable Ship Long-Term Charter, newest first.
File Type Posted
Amendment_0005.pdf PDF
Attach_E_PWS_18R3506_-_Rev._1.pdf PDF
Amendment_0004.pdf PDF
Attach_B_Basic_Pricing_Data_18R3506_-_Rev._1.xlsx XLSX spreadsheet
Attach_E_PWS_Rev._1.pdf PDF
Amendment_0003.pdf PDF
Cable_Ship_RFP_(N32205-18-R-3506)_Q&A_Document.docx DOCX document
Q&A___3_&_4.pdf PDF
Amendment_0002.pdf PDF
Q&A___1_&_2.docx DOCX document
Attach_Q_PAST_PERFORMANCE.docx DOCX document
Amendment_0001.pdf PDF
Attach_G_ATFP_CBRD_and_Training_Requirements_18R3506.pdf PDF
Attach_H(2)__WD_2014-0801_Rev_(9).pdf PDF
RFP_N32205-18-R-3506.pdf PDF
Attach_C_Crew_Complement_-18R3506.docx DOCX document
Attach_P_-_Sample_CHE_Accpetance_Regime.pdf PDF
Attach_O_Tech_Exhibit_18R3506.pdf PDF
Attach_H(3)__WD_2014-0800_Rev_(10).pdf PDF
Attach_A_List_of_GFP.xlsx XLSX spreadsheet
Attach_B_Basic_Pricing_Data_18R3506.xlsx XLSX spreadsheet
Attach_E_PWS_18R3506.pdf PDF
Attach_I_SF_LLL_-_18R3506.pdf PDF
Attach_N__Bidders_Questions.docx DOCX document
Attach_L_Decon_Station_DWG_18R3506.pdf PDF
Attach_H(1)__WD_2010-0147_Rev_(7).pdf PDF
Attach_K_Specs_for_CBR-D_Decon_Station_18R3506.docx DOCX document
Attach_J_MECSP_Worksheet_18R3506.doc DOC document
Attach_D_dd0254_-18R3506.pdf PDF
18R3506_SYNOPSIS.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TECHNICAL EVALUATION MATRIX"ACK" - Offeror to acknowledge requirement detail AND indicate compliance
RFP SectionRequirement DescriptionACK/DETOFFEROR PG #"DET" - Offeror to provide full detail to describe how the requirement will be met.
1.5Emissions ControlACK
1.6CertificationsDETThis matrix lists the minimum technical vessel requirements. Some of
2.1FlagDETthe requirements simply require the Offeror to acknowledge the RFP
2.3SpeedDETrequirement and indicate compliance. These requirements have the
2.4EnduranceDETword "ACK" alongside them in the matrix. The verbiage “acknowledge
2.5RangeDETand will comply” or “warrants the vessel will be in compliance” (or
2.6DraftDETsimilar words to that effect) will be sufficient answers for the “ACK”
2.7ManueverabilityDETtechnical requirements listed below. This is sufficient to
2.8BreadthDET“demonstrate” the proposed vessel can meet or exceed these
2.9StabilityDETrequirements. Requirements which contain "DET" next to them must
2.10Bollard PullDETbe described with detailed information including technical data,
2.11Regulatory ComplianceDETdocumentation, drawings other supporting rationale to clearly
2.12Classification CertificationDETillustrate how the requirement will be met.
2.13Deck Crane and A-FrameDET
2.14Winches and CapstansDET
2.15WorkboatDET
2.16Deck PadeyesDET
2.17Repairs and Shore End InstallationsDET
2.18Deep Water Installation/RepairDET
2.19Shipwide Public Address SystemDET
2.20Dynamic PositioningDET
2.21WINFROGDET
2.22Navigation Aids (NAVAIDS) SecurityDET
2.23Navigation and Mission Electronic EquipmentDET
3.0Operating TempoACK
4.3.1Cable TanksDET
4.3.1.2Cable Tank ConfigurationDET
4.3.1.3Cable Coiling SpaceDET
4.3.1.4Minimum Spare CapacityDET
4.3.1.5Cable Tank LightingDET
4.3.1.6Cable Tank AccessDET
4.3.1.7Bighting FacilitiesDET
4.3.1.8Heavy Body StorageDET
4.3.1.9Repeater RacksACK
4.3.2Cable HighwayDET
4.3.2.1Overhead CraneDET
4.3.2.2Bend Restrictors and QuadrantsDET
4.3.2.3Cable Highway LightingDET
4.3.2.4Shock Exposure During HandlingDET
4.3.2.5Cable Loading/Discharge ServicesDET
4.3.2.6Environmental RequirementsDET
4.3.2.7Wet Hardware, Operation In AirDET
4.3.2.8Cooling and PBU BathsDET
4.3.2.9Wet Hardware, Transient Short-Term Operation In AirDET
4.3.2.10Underwater Hardware, Non-Operating and StorageDET
4.3.3.1Cable TroughingDET
4.3.3.2Cable Troughing/Turning Quadrants For Slack Cable SupportDET
4.3.3.3Outboard Overhead Lifting CapabilityDET
4.3.3.4Overboard Sheaves/Chutes and Cheek StructuresDET
4.3.4Cable Jointing SpaceDET
4.3.4.1Splice Area Junction BoxDET
4.3.4.2Power SupplyDET
4.3.5X-Ray/Dark RoomDET
4.3.7Test and Transmission Room (TTR) RequirementsDET
4.3.8Equipment Cabinet MountingDET
4.3.9Optical InterfaceDET
4.3.10Optical Cable TerminationACK
4.3.11Electro-Optical PatchworkACK
4.3.12Electrical Cable TerminationACK
4.3.13High Voltage D.C. Power InterfacesACK
4.3.14Contingency EquipmentACK
4.4Secure Cable Control Van (CCV)DET
4.5Cable Operations CCTV SystemDET
4.6Cable Operations CommunicationsDET
4.7Ship's Internal Communication Telephone SystemDET
4.8Shipwide Public Address SystemDET
4.9.1Cable Handling EquipmentDET
4.9.2Cable Drum EnginesDET
4.9.3Linear Cable EngineDET
4.9.4StonkerDET
4.9.5Draw-Off-Holdback (DOHB) MachinesDET
4.9.6Dynamometer Fairlead AssemblyDET
4.9.7Cable Transporters/HaulersDET
4.9.8Cable Handling, Installation, Repair and Laying MachineryDET
4.10Remote Information Display (RIDs)DET
4.11RIDs InstallationsDET
4.12Rotometers (ROTOS)DET
4.13Cable Protection from ChemicalsACK
4.14Cable GearDET
4.15Communication SuiteDET
4.16RadarACK
4.17Power Grounding Unit (PGU) EquipmentDET
4.17.1Emergency Power ShutdownDET
4.17.2Power StatusACK
5.0Mission Operational ResponsibilitiesDET
5.2Modes of OperationDET
5.2.1Cable Installation (No Plow)DET
5.2.2Cable Installation (With Plow)DET
5.2.3Cable Repair With ROVDET
5.2.4Cable Repair Without ROVDET
5.2.5Post Lay Inspection and Burial (PLIB)DET
5.2.6Route Clearance/Pre Lay Grapnel Run (PLGR)DET
5.2.7TransitACK
5.2.8Stand-By (Idle)ACK
5.3Ship SchedulingDET
5.4Maintenance Management SchedulingDET
5.5ROV and Sea PlowDET
5.5.1Sea Plow RequirementsDET
5.5.2Remotely Operated Vihicle (ROV) RequirementsDET
5.5.3Sea Plow and ROV Control RoomDET
5.5.5Sea Plow and ROV Launch Recovery System (LARS)DET
5.6Communication SupportACK
5.7Proof of CalibrationACK
5.8Expended GearACK
5.9Government Furnished EquipmentACK
5.10PermitsACK
6.1Safety ProgramDET
6.2Email AccountsACK
6.3Operation of SystemsACK
6.4Navigation and Cable LogsACK
6.5Sponsor Berthing/Living SpacesDET
6.5.1LinenACK
6.5.2Mattresses and PillowsACK
6.5.3Laundry Services FacilitiesACK
6.5.4Recreational FacilitiesACK
6.6Provide Sanitation ServicesACK
6.7Fresh WaterDET
6.8Food Service/Snacks for Government PersonnelACK
6.9Vessel ModificationsACK
6.10Physical SecurityACK
6.10.1Force ProtectionACK
6.10.3Notice to Mariners (NTM)ACK
6.10.4Alarm/Intrusion Detection SystemDET
6.10.4.1Contractor Security ResponsibilitiesACK
6.11Data Reporting/Other RequirementsACK
6.12Lifesaving EquipmentACK
6.13Home Port OperationsACK
6.14Port ServicesACK
7.1Contractor Facility ClearanceDET
7.2Personnel ClearanceDET
7.3Transportation Worker Identification Credential (TWIC)DET
7.5Contractor Program Manager (CPM)DET
7.6Security Management and SafeguardingDET
7.7Communications Suite Equipment OperatorsDET
7.8Medical PersonnelACK
7.9Plow PersonnelDET
7.10ROV PersonnelDET
7.11.1Manning PlanACK
7.11.2Personnel Contingency PlanACK
7.11.3Operational ResponsibilitiesACK
8.0Information Assurance Information Security (INFOSEC)ACK
8.1DFARS Comliance CertificationACK
8.2DocumentationACK
8.3Handling of Non-Public InformationACK
8.5Cyber Incident and Compromise ReportingACK
8.6Information Security Management System (ISMS)ACK
8.7ISMS DocumentationACK
8.8Inspection and Test RecordsACK
9.1Quality SystemACK
9.2Safety Management SystemACK
9.3SMS Safety and Occupational Health ProgramACK
9.4SMS Implementation PlanACK
9.5SMS DocumentationACK
9.6SMS NotificationACK
9.7SMS AuditsACK

Sheet2

Sheet3