Amendment_0002.pdf

PDF 91 KB Posted

Attached to
Cable Ship Long-Term Charter Federal contract opportunity
Solicitation number
N32205-18-R-3506
Issued by
Department of the Navy Military Sealift Command

About this file

Amendment 0002 to Solicitation N32205-18-R-3506

View the file

Other files for this federal contract opportunity

Other files attached to Cable Ship Long-Term Charter, newest first.
File Type Posted
Amendment_0005.pdf PDF
Attach_E_PWS_18R3506_-_Rev._1.pdf PDF
Attach_B_Basic_Pricing_Data_18R3506_-_Rev._1.xlsx XLSX spreadsheet
Amendment_0004.pdf PDF
Attach_E_PWS_Rev._1.pdf PDF
Amendment_0003.pdf PDF
Cable_Ship_RFP_(N32205-18-R-3506)_Q&A_Document.docx DOCX document
Q&A___3_&_4.pdf PDF
Q&A___1_&_2.docx DOCX document
Attach_Q_PAST_PERFORMANCE.docx DOCX document
Attach_F_Min._Tech._Requirements_Worksheet.xlsx XLSX spreadsheet
Amendment_0001.pdf PDF
Attach_G_ATFP_CBRD_and_Training_Requirements_18R3506.pdf PDF
Attach_H(2)__WD_2014-0801_Rev_(9).pdf PDF
RFP_N32205-18-R-3506.pdf PDF
Attach_B_Basic_Pricing_Data_18R3506.xlsx XLSX spreadsheet
Attach_E_PWS_18R3506.pdf PDF
Attach_I_SF_LLL_-_18R3506.pdf PDF
Attach_C_Crew_Complement_-18R3506.docx DOCX document
Attach_P_-_Sample_CHE_Accpetance_Regime.pdf PDF
Attach_O_Tech_Exhibit_18R3506.pdf PDF
Attach_H(3)__WD_2014-0800_Rev_(10).pdf PDF
Attach_A_List_of_GFP.xlsx XLSX spreadsheet
Attach_N__Bidders_Questions.docx DOCX document
Attach_L_Decon_Station_DWG_18R3506.pdf PDF
Attach_H(1)__WD_2010-0147_Rev_(7).pdf PDF
Attach_K_Specs_for_CBR-D_Decon_Station_18R3506.docx DOCX document
Attach_J_MECSP_Worksheet_18R3506.doc DOC document
Attach_D_dd0254_-18R3506.pdf PDF
18R3506_SYNOPSIS.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to amend the laydays listed in Box 5 of PART I of this solicitation.

All other terms and condition of this solicitation remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220518R3506

X 9B. DATED (SEE ITEM 11)

13-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Apr-2018

CODE

MILITARY SEALIFT COMMAND NORFOLK

471 EAST C STREET, BLDG SP-64 NAVAL STATION N

NORFOLK VA 23511

N32205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3220518R3506

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been modified:

MSC SPECIAL TIME

PART I – SPECIAL TIME BOXES

Vessel(s):

Solicitation Number: N32205-18-R-3506 Contract Number:

1. Vessel(s) Required:

The vessel requirements are provided as Attachment E. Attachment E is hereby incorporated for the purposes of FAR 52.212.4(as tailored)paragraph(s) ORDER OF

PRECEDENCE

2. Place / Range of Delivery:

Cheatham Annex, VA

3. Place / Range of Redelivery:

Cheatham Annex, VA

4. Charter Period):

Base period of one year, then followed by two

(2) 6-month options, then two (2) one-year options and then an 11-month option.

5. Laydays:

Commencing: 01 November 2018 Ending: 15 December 2018

6. Terms/Conditions/Attachments added, deleted or modified:

GENERAL DATA

7. Vessel/Flag/Year Built:

8. Proposal Firm Until:

9. Amendments Acknowledged (amendment numbers and dates):

10. Owner (style, address, phone, cell phone, e-mail, fax):

11. Broker (address, phone, e-mail, fax):

12. Remittance address for hire (if other than box 10):

FIRST PERIOD

FULL OPERATIONAL

STATUS RATE

REDUCED OPERATIONAL

STATUS RATE

(Not applicable to this solicitation)

REDUCED OPERATIONAL

STATUS RATE

(Not applicable to this solicitation)

13. USD per diem

14. USD per diem

15. USD per diem

SECOND PERIOD

STATUS RATE

REDUCED OPERATIONAL

STATUS RATE

(Not applicable to this solicitation)

REDUCED OPERATIONAL

STATUS RATE

13A. USD per diem

14A. USD per diem

15A. USD per diem

THIRD PERIOD

FULL OPERATIONAL REDUCED OPERATIONAL REDUCED OPERATIONAL

STATUS RATE STATUS RATE

STATUS RATE

13B. USD per diem

14B. USD per diem

15B. USD per diem

FOURTH PERIOD

STATUS RATE

REDUCED OPERATIONAL

STATUS RATE

(Not applicable to this solicitation)

REDUCED OPERATIONAL

STATUS RATE

13C. USD per diem

14C. USD per diem

15C. USD per diem

FIFTH PERIOD

STATUS RATE

REDUCED OPERATIONAL

STATUS RATE

(Not applicable to this solicitation)

REDUCED OPERATIONAL

STATUS RATE

13D. USD per diem

14D. USD per diem

15D. USD per diem

SIXTH PERIOD

STATUS RATE

REDUCED OPERATIONAL

STATUS RATE

(Not applicable to this solicitation)

REDUCED OPERATIONAL

STATUS RATE

13E. USD per diem

14E. USD per diem

15E. USD per diem

16. Indicate anticipated crewing arrangements during ROS (Less Than 10 Days) and ROS (10 Days and Longer):

17. Other Costs:

18. Laydays Proposed:

N/A

19. Estimated Readiness Date:

20. Voluntary Intermodal Sealift Agreement (VISA) Status of Offeror and Vessel(s):

21. Vessel type and, if applicable, MARAD design type:

22. Place built:

23. Year built: Flag:

24. INMARSAT: 25. Vessel's e-mail/Fax:

26. Call Letters: 27. Official number:

28. Net registered tonnage: 29. Panama Canal tonnage:

30. Gross registered tonnage: 31. Suez Canal tonnage:

32. Beam (extreme)

a. (ft) b. (m)

33. Length Overall:

a. (ft) b. (m)

34. Immersion (on draft in Box 36):

a. (LT/in) b. (t/cm)

35. Length between perpendiculars:

a. (ft) b. (m)

36. Summer mean draft:

a. (ft) b. (m)

37. Deadweight capacity (on draft in Box 36):

a. (LT) b. (t)

38. Displacement, loaded (on draft in Box 36):

a. (LT/in) b. (t/cm)

39. Summer Load Line Freeboard:

a. (ft b. (m)

40. Shaft Horsepower/kilowatts:

a. (hp) b. (kW)

41. Brake Horsepower/kilowatts:

a. (hp) b. (kW)

42. Nationality of Master/Officers/Crew: 43. Number of persons other than crew that can be carried:

44. Classification society entered and class assigned:

45. Insured value of vessel (USD): 46. Vessel's present position/destination:

47. Last dry-dock date (mm/dd/yy): 48. Next dry-dock date (mm/dd/yy):

49. MarAd subsidized vessel: Yes _____ No ___ Will not be subsidized after postaward sale.

50. Total grain cubic capacity (cu ft / cubic meters underdeck, exclusive of deep tanks, wing tanks, reefer spaces, and spaces fitted with cell guides): N/A

51. Total Bale cubic capacity (cu ft / cubic meters underdeck, exclusive of deep tanks, wing tanks, reefer spaces, and spaces fitted with cell guides): N/A

52. Number of tween decks: N/A

53. Cargo Space

a. Square footage of cargo space (note particularly total ft2, ft2 with 10 ft clearance, ft2underdeck, Ro/Ro Space): N/A

b. Square meters of cargo space (note particularly total m2, m2 with 3.048 m clearance, m2 underdeck, Ro/Ro Space): N/A

54. Total underdeck container capacity (TEU/FEU): N/A

55. Total on-deck container capacity (TEU/FEU): N/A

56. Total refrigerated-container capacity (TEU/FEU, including number/style of outlets): N/A

57. Reefer-space capacity (cu ft / cu meters): N/A

58. Deep-tank capacity (cu ft/cu meters/bbls): N/A

59. Capacity of spaces fitted with cell guides (TEU): N/A

60. Amount and location of permanent ballast carried:

61. General description of ramps (number, location, size, capacity, and type):

(note particularly weight of heaviest permissible vehicle in LT or t)

N/A

62. General description of cargo spaces and special features:

GEAR

63. Number/location/SWL capacity of winches, derricks, booms, and cranes:

CASUALTIES / DEFICIENCIES

64. Has vessel been involved in any serious grounding or collision within twelve months from the submission date of this proposal?

65. Are any deficiencies lodged by any regulatory body outstanding against the Vessel? (include full description if "yes")

FUEL CONSUMPTION AT SERVICE SPEEDS

66. Average warranted speed (knots in Moderate weather):

a. Laden

b. Cable installation with no plow

c. Cable installation with plow

d. Cable repair with ROV

e. Cable repair with no ROV

f. Post Lay Inspection Burial (PLIB)

g. Pre Lay Grapnel Run

67. Average warranted speed (knots, for ballast, moderate weather):

68. Average fuel consumption (net bbls at 60 deg F and grade(s): for laden, moderate weather passage at speed identified in Box 66):

68a. Average fuel consumption (net bbls at 60 deg F and grade(s): for Cable installation with no plow, moderate weather passage at speed identified in Box 66):

68b. Average fuel consumption (net bbls at 60 deg F and grade(s): for Cable installation with plow, moderate weather passage at speed identified in Box 66):

68c. Average fuel consumption (net bbls at 60 deg F and grade(s): for Cable repair with ROV, moderate weather passage at speed identified in Box 66):

68d. Average fuel consumption (net bbls at 60 deg F and grade(s): for Cable repair with no ROV, moderate weather passage at speed identified in Box 66):

68e. Average fuel consumption (net bbls at 60 deg F and grade(s): for Post Lay Inspection Burial (PLIB), moderate weather passage at speed identified in Box 66):

68f. Average fuel consumption (net bbls at 60 deg F and grade(s): for Pre Lay Grapnel Run moderate weather passage at speed identified in Box 66):

69. Average fuel consumption (net bbls at 60 deg F and grade(s): for ballast, moderate weather passage at speed identified in Box 67):

70. Auxiliaries underway fuel consumption (net bbls at 60 deg F and grade(s), only if not elsewhere identified):

a. Laden

b. Cable installation with no plow

c. Cable installation with plow

d. Cable repair with ROV

e. Cable repair with no ROV

f. Post Lay Inspection Burial (PLIB)

g. Pre Lay Grapnel Run

71. Idle fuel period fuel consumption (net bbls at 60 deg F and grade(s)):

FUEL CONSUMPTION AT VARIABLE SPEEDS

72. Average fuel consumption (net bbls at 60 deg F for all grades and all engines/auxiliaries utilized while underway over moderate-weather passages at the speed, ranges, and grade(s) indicated):

73. Grades Consumed:

74a.

Knots

LADEN -

Net bbls per mile

Net bbls per day

Operating Range

(NM)

74b.

Knots

BALLAST

- Net bbls per mile

Net bbls per day

Operating Range

(NM)

02 . 02 03 03 04 04 05 05 06 06 07 07 08 08 09 09 10 10 11 11

75. Price to Purchase Chartered Vessel

(End of Summary of Changes)

PART I – SPECIAL TIME BOXES

File details come from the government source that posted it.